Garage, shed and shade structure permits in Montgomery County, MD

Data through September 2026 · updated 19 Oct 2026

2,548 garage, shed and shade structure permits were issued in Montgomery County, October 2024 through September 2026: about 1,274 a year and 4% of all permits. 1,282 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 1,266 in the 12 months before. The busiest month is April. The usual one took 50 days from issue to the county's final. 20854 has the most, 166.

2,548permits issued
1,282last 12 months
Aprbusiest month
50days, usual issue to final
86%finished
$10,000usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 117Oct2024Nov 2024: 110Dec 2024: 76Jan 2025: 62Jan2025Feb 2025: 78Mar 2025: 75Apr 2025: 143May 2025: 113Jun 2025: 119Jul 2025: 121JulAug 2025: 126Sep 2025: 126Oct 2025: 128Nov 2025: 89Dec 2025: 77Jan 2026: 61Jan2026Feb 2026: 52Mar 2026: 91Apr 2026: 133May 2026: 118Jun 2026: 139Jul 2026: 154JulAug 2026: 121Sep 2026: 119
The same numbers as a table
MonthPermits
Oct 2024117
Nov 2024110
Dec 202476
Jan 202562
Feb 202578
Mar 202575
Apr 2025143
May 2025113
Jun 2025119
Jul 2025121
Aug 2025126
Sep 2025126
Oct 2025128
Nov 202589
Dec 202577
Jan 202661
Feb 202652
Mar 202691
Apr 2026133
May 2026118
Jun 2026139
Jul 2026154
Aug 2026121
Sep 2026119

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (130), January the quietest (58). A busy month at the permit counter usually means a longer wait for a contractor.

January: 58 (100 = an average month)February: 61 (100 = an average month)March: 78 (100 = an average month)April: 130 (100 = an average month)130May: 109 (100 = an average month)June: 122 (100 = an average month)July: 130 (100 = an average month)August: 116 (100 = an average month)September: 115 (100 = an average month)October: 115 (100 = an average month)November: 94 (100 = an average month)December: 72 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January58
February61
March78
April130
May109
June122
July130
August116
September115
October115
November94
December72

Download this table (CSV)

How long a garage, shed and shade structure permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,089 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,266
Finished86.0%
Usual days, issue to final50
Middle half, days28–111

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 2,530 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$10,000
Middle half$5,000–$22,824

Download this table (CSV)

ZIP codes with the most garage, shed and shade structure permits

Counted at the property's ZIP code. Share is the part of the county's 2,548 garage, shed and shade structure permits.

ZIP codePermitsShare
208541667%
208171516%
208411426%
209021365%
208861315%
208781195%
209061185%
209011175%
208741064%
209041024%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Deck: construct1,63364%
Shed: construct61024%
Residential Accessory Structure: construct1426%
Garage: construct462%
Residential Accessory Structure: add402%
Residential Accessory Structure: alter321%
Garage: restore and / or repair16under 1%
Shed: restore and / or repair8under 1%
Garage: alter8under 1%
Residential Accessory Structure: restore and / or repair8under 1%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Washington, DC. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: dataMontgomery: Residential Permit, Commercial Permits, Mechanical Permits and Electrical Building Permits (Department of Permitting Services), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical and mechanical permits issued by the Montgomery County Department of Permitting Services, which covers the county outside the cities that run their own building offices: Silver Spring, Bethesda, Potomac, Germantown, Clarksburg, Chevy Chase, Olney, Wheaton, Takoma Park and the rest. The cities of Rockville and Gaithersburg issue most of their own building permits, so permits inside those cities are largely missing; a Rockville or Gaithersburg mailing address in this file is usually just outside those cities. Plumbing and gas-service permits are issued by WSSC Water, not the county, and are not in the file.

  • The county's files name no contractor, so there are no contractor lists, rankings or firm pages for Montgomery County.
  • Declared value is filled on building permits only; electrical and HVAC permits carry no job value, so costs are shown only for building work.
  • Plumbing permits are issued by WSSC Water, not the county, so plumbing barely appears here (a few gas-appliance jobs on mechanical permits).
  • Solar counts come from electrical permits whose description mentions solar or photovoltaic panels.
  • Decks count with garages and sheds. A final date is the county's final inspection date; a permit at Stop Work counts as open.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in Montgomery County, MD", https://contractorrecords.com/montgomery-county-md/accessory-permits, data through September 2026, from Montgomery County Department of Permitting Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: days to final · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by ZIP code · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Montgomery County issue a year?About 1,274 a year in Montgomery County: 2,548 permits issued October 2024 through September 2026, 1,282 of them in the last 12 months.
  • How long does a garage, shed and shade structure permit take in Montgomery County?The usual one took 50 days from issue to the county's final inspection, and the middle half took 28 to 111 days (1,089 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Montgomery County file the most garage, shed and shade structure permits?April (130 against an average month of 100); January is the quietest (58). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most garage, shed and shade structure permits in Montgomery County?20854, with 166 of the 2,548 (7%); then 20817 (151).