7,854 solar permits were issued in Montgomery County, October 2024 through September 2026: about 3,927 a year and 14% of all permits. 4,070 solar permits in the last 12 months (Oct 2025–Sep 2026), 8% more than the 3,784 in the 12 months before. The busiest month is October. The usual one took 48 days from issue to the county's final. 20906 has the most, 522.

7,854permits issued
4,070last 12 months
Octbusiest month
48days, usual issue to final
81%finished
$23,000usual declared value
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 385Oct2024Nov 2024: 303Dec 2024: 253Jan 2025: 239Jan2025Feb 2025: 270Mar 2025: 329Apr 2025: 257May 2025: 287Jun 2025: 242Jul 2025: 412JulAug 2025: 414Sep 2025: 393Oct 2025: 494Nov 2025: 493Dec 2025: 506Jan 2026: 237Jan2026Feb 2026: 212Mar 2026: 189Apr 2026: 228May 2026: 351Jun 2026: 336Jul 2026: 356JulAug 2026: 328Sep 2026: 340
The same numbers as a table
MonthPermits
Oct 2024385
Nov 2024303
Dec 2024253
Jan 2025239
Feb 2025270
Mar 2025329
Apr 2025257
May 2025287
Jun 2025242
Jul 2025412
Aug 2025414
Sep 2025393
Oct 2025494
Nov 2025493
Dec 2025506
Jan 2026237
Feb 2026212
Mar 2026189
Apr 2026228
May 2026351
Jun 2026336
Jul 2026356
Aug 2026328
Sep 2026340

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (134), January the quietest (73). A busy month at the permit counter usually means a longer wait for a contractor.

January: 73 (100 = an average month)February: 74 (100 = an average month)March: 79 (100 = an average month)April: 74 (100 = an average month)May: 97 (100 = an average month)June: 88 (100 = an average month)July: 117 (100 = an average month)August: 113 (100 = an average month)September: 112 (100 = an average month)October: 134 (100 = an average month)134November: 122 (100 = an average month)December: 116 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January73
February74
March79
April74
May97
June88
July117
August113
September112
October134
November122
December116

Download this table (CSV)

How long a solar permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 3,052 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20253,784
Finished80.7%
Usual days, issue to final48
Middle half, days29–83

Download this table (CSV)

What a solar permit is declared at

The value written on the permit at application, from 3,859 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$23,000
Middle half$13,851–$34,000

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the county's 7,854 solar permits.

ZIP codePermitsShare
209065227%
209024576%
209044566%
208783825%
208743645%
208543595%
209103224%
208173064%
208862974%
208532954%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical permit3,99451%
Single Family Dwelling: alter3,62746%
Townhouse: alter1522%
Commercial Miscellaneous Structure: alter16under 1%
Miscellaneous Structure: construct13under 1%
Business Building: alter11under 1%
Storage Building: alter8under 1%
Multifamily Dwelling High Rise: alter5under 1%
Commercial Miscellaneous Structure: construct5under 1%
Place Of Worship: alter3under 1%

Download this table (CSV)

How Montgomery County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Solar permits for other places in Washington, DC. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: dataMontgomery: Residential Permit, Commercial Permits, Mechanical Permits and Electrical Building Permits (Department of Permitting Services), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical and mechanical permits issued by the Montgomery County Department of Permitting Services, which covers the county outside the cities that run their own building offices: Silver Spring, Bethesda, Potomac, Germantown, Clarksburg, Chevy Chase, Olney, Wheaton, Takoma Park and the rest. The cities of Rockville and Gaithersburg issue most of their own building permits, so permits inside those cities are largely missing; a Rockville or Gaithersburg mailing address in this file is usually just outside those cities. Plumbing and gas-service permits are issued by WSSC Water, not the county, and are not in the file.

  • The county's files name no contractor, so there are no contractor lists, rankings or firm pages for Montgomery County.
  • Declared value is filled on building permits only; electrical and HVAC permits carry no job value, so costs are shown only for building work.
  • Plumbing permits are issued by WSSC Water, not the county, so plumbing barely appears here (a few gas-appliance jobs on mechanical permits).
  • Solar counts come from electrical permits whose description mentions solar or photovoltaic panels.
  • Decks count with garages and sheds. A final date is the county's final inspection date; a permit at Stop Work counts as open.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in Montgomery County, MD", https://contractorrecords.com/montgomery-county-md/solar-permits, data through September 2026, from Montgomery County Department of Permitting Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: days to final · Solar permits: declared value · Solar permits by ZIP code · Solar permits by permit type.

Common questions

  • How many solar permits does Montgomery County issue a year?About 3,927 a year in Montgomery County: 7,854 permits issued October 2024 through September 2026, 4,070 of them in the last 12 months.
  • How long does a solar permit take in Montgomery County?The usual one took 48 days from issue to the county's final inspection, and the middle half took 29 to 83 days (3,052 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Montgomery County file the most solar permits?October (134 against an average month of 100); January is the quietest (73). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.