ADU and casita permits in Montgomery County, MD

Data through September 2026 · updated 19 Oct 2026

229 ADU and casita permits were issued in Montgomery County, October 2024 through September 2026: about 114 a year and under 1% of all permits. 147 ADU and casita permits in the last 12 months (Oct 2025–Sep 2026), 79% more than the 82 in the 12 months before. The busiest month is September. The usual one took 167 days from issue to the county's final. 20817 has the most, 23.

229permits issued
147last 12 months
Sepbusiest month
167days, usual issue to final
$40,000usual declared value
Sep 2026records through

ADU and casita permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 9Oct2024Nov 2024: 2Dec 2024: 9Jan 2025: 1Jan2025Feb 2025: 5Mar 2025: 8Apr 2025: 7May 2025: 8Jun 2025: 5Jul 2025: 6JulAug 2025: 12Sep 2025: 10Oct 2025: 13Nov 2025: 10Dec 2025: 18Jan 2026: 5Jan2026Feb 2026: 3Mar 2026: 18Apr 2026: 17May 2026: 8Jun 2026: 11Jul 2026: 14JulAug 2026: 13Sep 2026: 17
The same numbers as a table
MonthPermits
Oct 20249
Nov 20242
Dec 20249
Jan 20251
Feb 20255
Mar 20258
Apr 20257
May 20258
Jun 20255
Jul 20256
Aug 202512
Sep 202510
Oct 202513
Nov 202510
Dec 202518
Jan 20265
Feb 20263
Mar 202618
Apr 202617
May 20268
Jun 202611
Jul 202614
Aug 202613
Sep 202617

Download this table (CSV)

When ADU and casita permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (141), January the quietest (31). A busy month at the permit counter usually means a longer wait for a contractor.

January: 31 (100 = an average month)February: 42 (100 = an average month)March: 136 (100 = an average month)April: 126 (100 = an average month)May: 84 (100 = an average month)June: 84 (100 = an average month)July: 105 (100 = an average month)August: 131 (100 = an average month)September: 141 (100 = an average month)141October: 115 (100 = an average month)November: 63 (100 = an average month)December: 141 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January31
February42
March136
April126
May84
June84
July105
August131
September141
October115
November63
December141

Download this table (CSV)

How long an ADU and casita permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 62 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 202582
Usual days, issue to final167
Middle half, days85–307

Download this table (CSV)

What an ADU and casita permit is declared at

The value written on the permit at application, from 223 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$40,000
Middle half$15,000–$135,000

Download this table (CSV)

ZIP codes with the most ADU and casita permits

Counted at the property's ZIP code. Share is the part of the county's 229 ADU and casita permits.

ZIP codePermitsShare
208172310%
208542210%
20904167%
20910146%
20902115%
20815115%
2081494%
2085394%
2087894%
2089583%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Single Family Dwelling: alter15166%
Single Family Dwelling: add5022%
Residential Accessory Structure: construct146%
Townhouse: alter42%
Single Family Dwelling: restore and / or repair42%
Garage: construct31%
Residential Accessory Structure: alter1under 1%
Residential Accessory Structure: add1under 1%
Shed: construct1under 1%

Download this table (CSV)

Nearby permit data

ADU and casita permits for other places in Washington, DC. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: dataMontgomery: Residential Permit, Commercial Permits, Mechanical Permits and Electrical Building Permits (Department of Permitting Services), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical and mechanical permits issued by the Montgomery County Department of Permitting Services, which covers the county outside the cities that run their own building offices: Silver Spring, Bethesda, Potomac, Germantown, Clarksburg, Chevy Chase, Olney, Wheaton, Takoma Park and the rest. The cities of Rockville and Gaithersburg issue most of their own building permits, so permits inside those cities are largely missing; a Rockville or Gaithersburg mailing address in this file is usually just outside those cities. Plumbing and gas-service permits are issued by WSSC Water, not the county, and are not in the file.

  • The county's files name no contractor, so there are no contractor lists, rankings or firm pages for Montgomery County.
  • Declared value is filled on building permits only; electrical and HVAC permits carry no job value, so costs are shown only for building work.
  • Plumbing permits are issued by WSSC Water, not the county, so plumbing barely appears here (a few gas-appliance jobs on mechanical permits).
  • Solar counts come from electrical permits whose description mentions solar or photovoltaic panels.
  • Decks count with garages and sheds. A final date is the county's final inspection date; a permit at Stop Work counts as open.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "ADU and casita permits in Montgomery County, MD", https://contractorrecords.com/montgomery-county-md/adu-permits, data through September 2026, from Montgomery County Department of Permitting Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): ADUs & casitas permits by month · ADUs & casitas permits by calendar month (index) · ADUs & casitas permits: days to final · ADUs & casitas permits: declared value · ADUs & casitas permits by ZIP code · ADUs & casitas permits by permit type.

Common questions

  • How many ADU and casita permits does Montgomery County issue a year?About 114 a year in Montgomery County: 229 permits issued October 2024 through September 2026, 147 of them in the last 12 months.
  • How long does an ADU and casita permit take in Montgomery County?The usual one took 167 days from issue to the county's final inspection, and the middle half took 85 to 307 days (62 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Montgomery County file the most ADU and casita permits?September (141 against an average month of 100); January is the quietest (31). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most ADU and casita permits in Montgomery County?20817, with 23 of the 229 (10%); then 20854 (22).