Contractor Records
Home › Montgomery County › Remodels & repairs

Remodel and repair permits in Montgomery County, MD

Data through September 2026 · updated 19 Oct 2026

2,673 remodel and repair permits were issued in Montgomery County, October 2024 through September 2026: about 1,336 a year and 5% of all permits. 1,458 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 20% more than the 1,215 in the 12 months before. The busiest month is July. The usual one took 119 days from issue to the county's final. 20854 has the most, 264.

2,673permits issued
1,458last 12 months
Julbusiest month
119days, usual issue to final
85%finished
$25,000usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 101Oct2024Nov 2024: 91Dec 2024: 100Jan 2025: 104Jan2025Feb 2025: 92Mar 2025: 118Apr 2025: 100May 2025: 102Jun 2025: 82Jul 2025: 129JulAug 2025: 102Sep 2025: 94Oct 2025: 137Nov 2025: 115Dec 2025: 137Jan 2026: 90Jan2026Feb 2026: 108Mar 2026: 114Apr 2026: 109May 2026: 135Jun 2026: 144Jul 2026: 117JulAug 2026: 128Sep 2026: 124
The same numbers as a table
MonthPermits
Oct 2024101
Nov 202491
Dec 2024100
Jan 2025104
Feb 202592
Mar 2025118
Apr 2025100
May 2025102
Jun 202582
Jul 2025129
Aug 2025102
Sep 202594
Oct 2025137
Nov 2025115
Dec 2025137
Jan 202690
Feb 2026108
Mar 2026114
Apr 2026109
May 2026135
Jun 2026144
Jul 2026117
Aug 2026128
Sep 2026124

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (110), January the quietest (87). A busy month at the permit counter usually means a longer wait for a contractor.

January: 87 (100 = an average month)February: 90 (100 = an average month)March: 104 (100 = an average month)April: 94 (100 = an average month)May: 106 (100 = an average month)June: 101 (100 = an average month)July: 110 (100 = an average month)110August: 103 (100 = an average month)September: 98 (100 = an average month)October: 107 (100 = an average month)November: 92 (100 = an average month)December: 106 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January87
February90
March104
April94
May106
June101
July110
August103
September98
October107
November92
December106

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,029 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,215
Finished84.7%
Usual days, issue to final119
Middle half, days68–196

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 2,663 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$25,000
Middle half$10,000–$60,000

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the county's 2,673 remodel and repair permits.

ZIP codePermitsShare
2085426410%
208172028%
208151957%
209011465%
209021305%
209101215%
209121104%
208161054%
208781044%
208951014%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Single Family Dwelling: alter2,22083%
Single Family Dwelling: restore and / or repair2429%
Townhouse: alter1305%
Townhouse: restore and / or repair542%
Single Family Dwelling: final only ap19under 1%
Duplex: alter4under 1%
Single Family Dwelling: construct sheeting/shoring3under 1%
Duplex: restore and / or repair1under 1%

Download this table (CSV)

How Montgomery County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in Washington, DC. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: dataMontgomery: Residential Permit, Commercial Permits, Mechanical Permits and Electrical Building Permits (Department of Permitting Services), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical and mechanical permits issued by the Montgomery County Department of Permitting Services, which covers the county outside the cities that run their own building offices: Silver Spring, Bethesda, Potomac, Germantown, Clarksburg, Chevy Chase, Olney, Wheaton, Takoma Park and the rest. The cities of Rockville and Gaithersburg issue most of their own building permits, so permits inside those cities are largely missing; a Rockville or Gaithersburg mailing address in this file is usually just outside those cities. Plumbing and gas-service permits are issued by WSSC Water, not the county, and are not in the file.

  • The county's files name no contractor, so there are no contractor lists, rankings or firm pages for Montgomery County.
  • Declared value is filled on building permits only; electrical and HVAC permits carry no job value, so costs are shown only for building work.
  • Plumbing permits are issued by WSSC Water, not the county, so plumbing barely appears here (a few gas-appliance jobs on mechanical permits).
  • Solar counts come from electrical permits whose description mentions solar or photovoltaic panels.
  • Decks count with garages and sheds. A final date is the county's final inspection date; a permit at Stop Work counts as open.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Montgomery County, MD", https://contractorrecords.com/montgomery-county-md/remodel-permits, data through September 2026, from Montgomery County Department of Permitting Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits: declared value · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Montgomery County issue a year?About 1,336 a year in Montgomery County: 2,673 permits issued October 2024 through September 2026, 1,458 of them in the last 12 months.
  • How long does a remodel and repair permit take in Montgomery County?The usual one took 119 days from issue to the county's final inspection, and the middle half took 68 to 196 days (1,029 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Montgomery County file the most remodel and repair permits?July (110 against an average month of 100); January is the quietest (87). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Montgomery County?20854, with 264 of the 2,673 (10%); then 20817 (202).