Contractor Records
Orlando › Firms › In Phaze Electric Inc
IN

In Phaze Electric Inc: building permits in Orlando, FL

In Phaze Electric Inc pulled 74 building permits in Orlando, FL from Oct 2023 to Sep 2026, 37 in the last 12 months, across 1 trade (electrical). Top 4 of 751 for electrical in Orlando · based in St Cloud · name on permits: IN PHAZE ELECTRIC INC

74matching permits
37last 12 months
1trade
Strongevidence strength

Building permits by In Phaze Electric Inc

TradePermitsLast 12 moUsual filed valuevs tradeActiveEvidenceList position
Electrical7437$3,7601.4× the usual for the tradeOct 2023 – Sep 2026Strong#4 of 751

List position: where the firm lands on the Orlando comparison for that trade at default settings (or at a typical budget), among firms without a license problem. It's a match score from public records, not a quality rating.

Filed value is what was written on the permit, not a quote or final bill. Some jobs never need a permit.

License

Complaints, lawsuits and the permit record

Our record covers building permits, not complaints or court cases. In Orlando, FL, In Phaze Electric Inc pulled 74 permits 2023–2026. To check complaints and lawsuits, search Florida DBPR (Florida DBPR license search), BBB complaints for In Phaze Electric Inc and Orange County court records.

We never say whether a complaint or lawsuit exists: we do not hold those records.

Questions

Where In Phaze Electric Inc works

The ZIP codes where In Phaze Electric Inc filed the most of its 74 permits on homes in Orlando, counted at each property's ZIP code. A ZIP code opens every permit we track there and the most active firms in each trade.

Orlando permits by ZIP code →

Similar electricians in Orlando

The 5 electricians closest to In Phaze Electric Inc's 74 electrical permits. Similar volume, not similar quality.

Compare all Orlando electricians →

Compare In Phaze Electric Inc with other Orlando electrical contractors

Every permit record in the city, side by side. Pick what you value. The list moves.

Source: public permit records (Orlando), matched by contractor name. How the records work. Something wrong? Firms can request a correction.