Garage, shed and shade structure permits in unincorporated Pierce County, WA

Data through September 2026 · updated 20 Oct 2026

592 garage, shed and shade structure permits were issued in unincorporated Pierce County, October 2024 through September 2026: about 296 a year and 4% of all permits. 298 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 294 in the 12 months before. The busiest month is November. The usual one took 168 days from issue to the county's final.

592permits issued
298last 12 months
Novbusiest month
168days, usual issue to final
70%finished
$50,141usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 25Oct2024Nov 2024: 35Dec 2024: 18Jan 2025: 22Jan2025Feb 2025: 17Mar 2025: 19Apr 2025: 26May 2025: 26Jun 2025: 19Jul 2025: 39JulAug 2025: 15Sep 2025: 33Oct 2025: 33Nov 2025: 31Dec 2025: 15Jan 2026: 22Jan2026Feb 2026: 13Mar 2026: 23Apr 2026: 31May 2026: 21Jun 2026: 33Jul 2026: 26JulAug 2026: 26Sep 2026: 24
The same numbers as a table
MonthPermits
Oct 202425
Nov 202435
Dec 202418
Jan 202522
Feb 202517
Mar 202519
Apr 202526
May 202526
Jun 202519
Jul 202539
Aug 202515
Sep 202533
Oct 202533
Nov 202531
Dec 202515
Jan 202622
Feb 202613
Mar 202623
Apr 202631
May 202621
Jun 202633
Jul 202626
Aug 202626
Sep 202624

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). November is the busiest (134), February the quietest (61). A busy month at the permit counter usually means a longer wait for a contractor.

January: 89 (100 = an average month)February: 61 (100 = an average month)March: 85 (100 = an average month)April: 116 (100 = an average month)May: 95 (100 = an average month)June: 105 (100 = an average month)July: 132 (100 = an average month)August: 83 (100 = an average month)September: 116 (100 = an average month)October: 118 (100 = an average month)November: 134 (100 = an average month)134December: 67 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January89
February61
March85
April116
May95
June105
July132
August83
September116
October118
November134
December67

Download this table (CSV)

How long a garage, shed and shade structure permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 207 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025294
Finished70.4%
Expired17.3%
Usual days, issue to final168
Middle half, days87–284

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 591 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$50,141
Middle half$22,000–$84,050

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Construction Residential - New Structure - Garage40468%
Construction Residential - New Structure - Deck/Dock/Shed8214%
Construction Residential - Addition - Deck/Dock/Shed539%
Construction Residential - Addition - Garage183%
Construction Residential - New Structure - Agriculture183%
Construction Residential - New Structure - Other Structure122%
Construction Residential - Garage4under 1%
Construction Residential - Deck/Dock/Shed1under 1%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Seattle and Puget Sound. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Pierce County Open Data, Permits - Pierce County (Permits_Pierce_County, from PALS Plus), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, mechanical, plumbing, manufactured-home, demolition, pool and sign permits Pierce County Planning & Public Works issues for unincorporated land only: Spanaway, Graham, Frederickson, Parkland, South Hill, Lake Tapps, the Key Peninsula, Gig Harbor peninsula and similar places. Tacoma, Lakewood, Puyallup, University Place, Gig Harbor city, Bonney Lake and the other cities run their own permit offices and are not in this file. Engineering, sewer and fire-prevention permits are left out.

  • The county's open permit file names no contractor, so there are no contractor lists, rankings or firm pages for Pierce County.
  • The value is the building valuation the county works out to set the permit fee (largely from floor area and type of construction); mechanical and plumbing permits carry none. It is not a final cost.
  • The file has no property ZIP code, so there are no ZIP code pages for Pierce County.
  • Electrical permits in Washington are issued by the state Department of Labor & Industries, not the county, so electrical work does not appear here; rooftop solar appears only when it needed a county building permit.
  • Mechanical permits cover furnaces, heat pumps and air conditioning, and also gas piping, gas fireplaces and water heaters; those last are counted as plumbing when the description says so.
  • A final date is the county's final date; permits the county cancelled are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in unincorporated Pierce County, WA", https://contractorrecords.com/pierce-county/accessory-permits, data through September 2026, from Pierce County Planning & Public Works building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: days to final · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Pierce County issue a year?About 296 a year in unincorporated Pierce County: 592 permits issued October 2024 through September 2026, 298 of them in the last 12 months.
  • How long does a garage, shed and shade structure permit take in Pierce County?The usual one took 168 days from issue to the county's final inspection, and the middle half took 87 to 284 days (207 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Pierce County file the most garage, shed and shade structure permits?November (134 against an average month of 100); February is the quietest (61). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.