Remodel and repair permits in unincorporated Pierce County, WA

Data through September 2026 · updated 20 Oct 2026

1,233 remodel and repair permits were issued in unincorporated Pierce County, October 2024 through September 2026: about 616 a year and 8% of all permits. 651 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 12% more than the 582 in the 12 months before. The busiest month is October. The usual one took 65 days from issue to the county's final.

1,233permits issued
651last 12 months
Octbusiest month
65days, usual issue to final
66%finished
$17,024usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 65Oct2024Nov 2024: 59Dec 2024: 54Jan 2025: 68Jan2025Feb 2025: 46Mar 2025: 31Apr 2025: 26May 2025: 48Jun 2025: 43Jul 2025: 49JulAug 2025: 45Sep 2025: 48Oct 2025: 74Nov 2025: 41Dec 2025: 42Jan 2026: 43Jan2026Feb 2026: 50Mar 2026: 53Apr 2026: 66May 2026: 57Jun 2026: 68Jul 2026: 54JulAug 2026: 55Sep 2026: 48
The same numbers as a table
MonthPermits
Oct 202465
Nov 202459
Dec 202454
Jan 202568
Feb 202546
Mar 202531
Apr 202526
May 202548
Jun 202543
Jul 202549
Aug 202545
Sep 202548
Oct 202574
Nov 202541
Dec 202542
Jan 202643
Feb 202650
Mar 202653
Apr 202666
May 202657
Jun 202668
Jul 202654
Aug 202655
Sep 202648

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (135), March the quietest (82). A busy month at the permit counter usually means a longer wait for a contractor.

January: 108 (100 = an average month)February: 93 (100 = an average month)March: 82 (100 = an average month)April: 90 (100 = an average month)May: 102 (100 = an average month)June: 108 (100 = an average month)July: 100 (100 = an average month)August: 97 (100 = an average month)September: 93 (100 = an average month)October: 135 (100 = an average month)135November: 97 (100 = an average month)December: 93 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January108
February93
March82
April90
May102
June108
July100
August97
September93
October135
November97
December93

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 386 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025582
Finished66.3%
Expired30.1%
Usual days, issue to final65
Middle half, days29–152

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 1,226 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$17,024
Middle half$8,450–$32,794

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Construction Residential - Remodel - House/plex1,10189%
Construction Residential - Remodel - Deck/Dock/Shed373%
Construction Residential - Remodel - Garage363%
Construction Residential - Replacement Permit - House/plex313%
Construction Residential - Replacement Permit - Garage11under 1%
Construction Residential - House/plex6under 1%
Construction Residential - Remodel - Other Structure5under 1%
Construction Residential - Replacement Permit - Deck/Dock/Sh2under 1%
Construction Residential - Remodel - Agriculture1under 1%
Construction Residential - Renewal - Garage1under 1%

Download this table (CSV)

How Pierce County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in Seattle and Puget Sound. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Pierce County Open Data, Permits - Pierce County (Permits_Pierce_County, from PALS Plus), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, mechanical, plumbing, manufactured-home, demolition, pool and sign permits Pierce County Planning & Public Works issues for unincorporated land only: Spanaway, Graham, Frederickson, Parkland, South Hill, Lake Tapps, the Key Peninsula, Gig Harbor peninsula and similar places. Tacoma, Lakewood, Puyallup, University Place, Gig Harbor city, Bonney Lake and the other cities run their own permit offices and are not in this file. Engineering, sewer and fire-prevention permits are left out.

  • The county's open permit file names no contractor, so there are no contractor lists, rankings or firm pages for Pierce County.
  • The value is the building valuation the county works out to set the permit fee (largely from floor area and type of construction); mechanical and plumbing permits carry none. It is not a final cost.
  • The file has no property ZIP code, so there are no ZIP code pages for Pierce County.
  • Electrical permits in Washington are issued by the state Department of Labor & Industries, not the county, so electrical work does not appear here; rooftop solar appears only when it needed a county building permit.
  • Mechanical permits cover furnaces, heat pumps and air conditioning, and also gas piping, gas fireplaces and water heaters; those last are counted as plumbing when the description says so.
  • A final date is the county's final date; permits the county cancelled are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in unincorporated Pierce County, WA", https://contractorrecords.com/pierce-county/remodel-permits, data through September 2026, from Pierce County Planning & Public Works building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits: declared value · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Pierce County issue a year?About 616 a year in unincorporated Pierce County: 1,233 permits issued October 2024 through September 2026, 651 of them in the last 12 months.
  • How long does a remodel and repair permit take in Pierce County?The usual one took 65 days from issue to the county's final inspection, and the middle half took 29 to 152 days (386 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Pierce County file the most remodel and repair permits?October (135 against an average month of 100); March is the quietest (82). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.