Solar permits in unincorporated Pierce County, WA

Data through September 2026 · updated 20 Oct 2026

259 solar permits were issued in unincorporated Pierce County, October 2024 through September 2026: about 130 a year and 2% of all permits. 68 solar permits in the last 12 months (Oct 2025–Sep 2026), 64% fewer than the 191 in the 12 months before. The busiest month is December. The usual one took 40 days from issue to the county's final.

259permits issued
68last 12 months
Decbusiest month
40days, usual issue to final
84%finished
$25,000usual declared value
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 17Oct2024Nov 2024: 16Dec 2024: 28Jan 2025: 11Jan2025Feb 2025: 8Mar 2025: 10Apr 2025: 13May 2025: 11Jun 2025: 26Jul 2025: 19JulAug 2025: 18Sep 2025: 14Oct 2025: 19Nov 2025: 12Dec 2025: 10Jan 2026: 5Jan2026Feb 2026: 0Mar 2026: 1Apr 2026: 6May 2026: 1Jun 2026: 5Jul 2026: 3JulAug 2026: 3Sep 2026: 3
The same numbers as a table
MonthPermits
Oct 202417
Nov 202416
Dec 202428
Jan 202511
Feb 20258
Mar 202510
Apr 202513
May 202511
Jun 202526
Jul 202519
Aug 202518
Sep 202514
Oct 202519
Nov 202512
Dec 202510
Jan 20265
Feb 20260
Mar 20261
Apr 20266
May 20261
Jun 20265
Jul 20263
Aug 20263
Sep 20263

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). December is the busiest (176), February the quietest (37). A busy month at the permit counter usually means a longer wait for a contractor.

January: 74 (100 = an average month)February: 37 (100 = an average month)March: 51 (100 = an average month)April: 88 (100 = an average month)May: 56 (100 = an average month)June: 144 (100 = an average month)July: 102 (100 = an average month)August: 97 (100 = an average month)September: 79 (100 = an average month)October: 167 (100 = an average month)November: 130 (100 = an average month)December: 176 (100 = an average month)176JFMAMJJASOND
The same numbers as a table
MonthIndex
January74
February37
March51
April88
May56
June144
July102
August97
September79
October167
November130
December176

Download this table (CSV)

How long a solar permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 161 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025191
Finished84.3%
Expired15.2%
Usual days, issue to final40
Middle half, days26–56

Download this table (CSV)

What a solar permit is declared at

The value written on the permit at application, from 254 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$25,000
Middle half$12,000–$39,028

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Construction Residential - Remodel - House/plex25097%
Construction Residential - Addition - House/plex83%
Construction Residential - House/plex1under 1%

Download this table (CSV)

How Pierce County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Solar permits for other places in Seattle and Puget Sound. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Pierce County Open Data, Permits - Pierce County (Permits_Pierce_County, from PALS Plus), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, mechanical, plumbing, manufactured-home, demolition, pool and sign permits Pierce County Planning & Public Works issues for unincorporated land only: Spanaway, Graham, Frederickson, Parkland, South Hill, Lake Tapps, the Key Peninsula, Gig Harbor peninsula and similar places. Tacoma, Lakewood, Puyallup, University Place, Gig Harbor city, Bonney Lake and the other cities run their own permit offices and are not in this file. Engineering, sewer and fire-prevention permits are left out.

  • The county's open permit file names no contractor, so there are no contractor lists, rankings or firm pages for Pierce County.
  • The value is the building valuation the county works out to set the permit fee (largely from floor area and type of construction); mechanical and plumbing permits carry none. It is not a final cost.
  • The file has no property ZIP code, so there are no ZIP code pages for Pierce County.
  • Electrical permits in Washington are issued by the state Department of Labor & Industries, not the county, so electrical work does not appear here; rooftop solar appears only when it needed a county building permit.
  • Mechanical permits cover furnaces, heat pumps and air conditioning, and also gas piping, gas fireplaces and water heaters; those last are counted as plumbing when the description says so.
  • A final date is the county's final date; permits the county cancelled are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in unincorporated Pierce County, WA", https://contractorrecords.com/pierce-county/solar-permits, data through September 2026, from Pierce County Planning & Public Works building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: days to final · Solar permits: declared value · Solar permits by permit type.

Common questions

  • How many solar permits does Pierce County issue a year?About 130 a year in unincorporated Pierce County: 259 permits issued October 2024 through September 2026, 68 of them in the last 12 months.
  • How long does a solar permit take in Pierce County?The usual one took 40 days from issue to the county's final inspection, and the middle half took 26 to 56 days (161 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Pierce County file the most solar permits?December (176 against an average month of 100); February is the quietest (37). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.