Contractor Records
Home › Roseville › Electrical

Electrical permits in Roseville, CA

Data through September 2026 · updated 19 Oct 2026

1,188 electrical permits were issued in Roseville, October 2024 through September 2026: about 594 a year and 10% of all permits. 587 electrical permits in the last 12 months (Oct 2025–Sep 2026), 2% fewer than the 601 in the 12 months before. The busiest month is November.

1,188permits issued
587last 12 months
Novbusiest month
$2,400usual declared value
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 30Oct2024Nov 2024: 155Dec 2024: 21Jan 2025: 26Jan2025Feb 2025: 52Mar 2025: 35Apr 2025: 42May 2025: 41Jun 2025: 39Jul 2025: 52JulAug 2025: 63Sep 2025: 45Oct 2025: 71Nov 2025: 42Dec 2025: 25Jan 2026: 39Jan2026Feb 2026: 44Mar 2026: 48Apr 2026: 65May 2026: 51Jun 2026: 56Jul 2026: 44JulAug 2026: 48Sep 2026: 54
The same numbers as a table
MonthPermits
Oct 202430
Nov 2024155
Dec 202421
Jan 202526
Feb 202552
Mar 202535
Apr 202542
May 202541
Jun 202539
Jul 202552
Aug 202563
Sep 202545
Oct 202571
Nov 202542
Dec 202525
Jan 202639
Feb 202644
Mar 202648
Apr 202665
May 202651
Jun 202656
Jul 202644
Aug 202648
Sep 202654

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). November is the busiest (199), December the quietest (46). A busy month at the permit counter usually means a longer wait for a contractor.

January: 66 (100 = an average month)February: 97 (100 = an average month)March: 84 (100 = an average month)April: 108 (100 = an average month)May: 93 (100 = an average month)June: 96 (100 = an average month)July: 97 (100 = an average month)August: 112 (100 = an average month)September: 100 (100 = an average month)October: 102 (100 = an average month)November: 199 (100 = an average month)199December: 46 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January66
February97
March84
April108
May93
June96
July97
August112
September100
October102
November199
December46

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 1,188 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$2,400
Middle half$2,400–$2,400

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical79667%
Electric Car Charger37832%
Commercial Car Charger141%

Download this table (CSV)

Nearby permit data

Electrical permits for other places in Sacramento. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Roseville open data, Building Permits Issued (data.roseville.ca.us), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Building permits the City of Roseville Development Services issues inside the city limits only. Rocklin, Granite Bay, Citrus Heights and unincorporated Placer County are outside the city and are not in this file.

  • The city's open permit file names no contractor, so there are no contractor lists, rankings or firm pages for Roseville.
  • The file lists each permit when it is issued and has no status, no final inspection date and no address or ZIP code, so these pages cannot show which permits finished, how long a permit takes, or where in the city the work was.
  • Homes are permits in the city's Residential group (new single-family homes, remodels, pools, patio covers, solar). Quick over-the-counter trade permits (heating and air, plumbing, electrical, re-roofs, windows) are mostly for homes but the file does not mark them, so they are not counted as homes.
  • The value is the job value on the permit, which sets the fee. It is not a final cost.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Roseville, CA", https://contractorrecords.com/roseville-ca/electrical-permits, data through September 2026, from the City of Roseville Development Services building-permit records.

Link to a table: By month · Season · Declared value · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: declared value · Electrical permits by permit type.

Common questions

  • How many electrical permits does Roseville issue a year?About 594 a year in Roseville: 1,188 permits issued October 2024 through September 2026, 587 of them in the last 12 months.
  • When do people in Roseville file the most electrical permits?November (199 against an average month of 100); December is the quietest (46). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.