Contractor Records
Home › Roseville › Garages, sheds & shade structures

Garage, shed and shade structure permits in Roseville, CA

Data through September 2026 · updated 19 Oct 2026

277 garage, shed and shade structure permits were issued in Roseville, October 2024 through September 2026: about 138 a year and 2% of all permits. 146 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 11% more than the 131 in the 12 months before. The busiest month is June.

277permits issued
146last 12 months
Junbusiest month
$3,000usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 10Oct2024Nov 2024: 8Dec 2024: 6Jan 2025: 10Jan2025Feb 2025: 8Mar 2025: 10Apr 2025: 13May 2025: 18Jun 2025: 13Jul 2025: 14JulAug 2025: 12Sep 2025: 9Oct 2025: 17Nov 2025: 12Dec 2025: 5Jan 2026: 6Jan2026Feb 2026: 8Mar 2026: 22Apr 2026: 12May 2026: 15Jun 2026: 21Jul 2026: 10JulAug 2026: 11Sep 2026: 7
The same numbers as a table
MonthPermits
Oct 202410
Nov 20248
Dec 20246
Jan 202510
Feb 20258
Mar 202510
Apr 202513
May 202518
Jun 202513
Jul 202514
Aug 202512
Sep 20259
Oct 202517
Nov 202512
Dec 20255
Jan 20266
Feb 20268
Mar 202622
Apr 202612
May 202615
Jun 202621
Jul 202610
Aug 202611
Sep 20267

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (147), December the quietest (48). A busy month at the permit counter usually means a longer wait for a contractor.

January: 69 (100 = an average month)February: 69 (100 = an average month)March: 139 (100 = an average month)April: 108 (100 = an average month)May: 143 (100 = an average month)June: 147 (100 = an average month)147July: 104 (100 = an average month)August: 100 (100 = an average month)September: 69 (100 = an average month)October: 117 (100 = an average month)November: 87 (100 = an average month)December: 48 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January69
February69
March139
April108
May143
June147
July104
August100
September69
October117
November87
December48

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 277 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$3,000
Middle half$3,000–$3,000

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Sacramento. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Roseville open data, Building Permits Issued (data.roseville.ca.us), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Building permits the City of Roseville Development Services issues inside the city limits only. Rocklin, Granite Bay, Citrus Heights and unincorporated Placer County are outside the city and are not in this file.

  • The city's open permit file names no contractor, so there are no contractor lists, rankings or firm pages for Roseville.
  • The file lists each permit when it is issued and has no status, no final inspection date and no address or ZIP code, so these pages cannot show which permits finished, how long a permit takes, or where in the city the work was.
  • Homes are permits in the city's Residential group (new single-family homes, remodels, pools, patio covers, solar). Quick over-the-counter trade permits (heating and air, plumbing, electrical, re-roofs, windows) are mostly for homes but the file does not mark them, so they are not counted as homes.
  • The value is the job value on the permit, which sets the fee. It is not a final cost.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in Roseville, CA", https://contractorrecords.com/roseville-ca/accessory-permits, data through September 2026, from the City of Roseville Development Services building-permit records.

Link to a table: By month · Season · Declared value.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: declared value.

Common questions

  • How many garage, shed and shade structure permits does Roseville issue a year?About 138 a year in Roseville: 277 permits issued October 2024 through September 2026, 146 of them in the last 12 months.
  • When do people in Roseville file the most garage, shed and shade structure permits?June (147 against an average month of 100); December is the quietest (48). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.