Contractor Records
Home › Roseville › Plumbing

Plumbing permits in Roseville, CA

Data through September 2026 · updated 19 Oct 2026

1,410 plumbing permits were issued in Roseville, October 2024 through September 2026: about 705 a year and 11% of all permits. 727 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 6% more than the 683 in the 12 months before. The busiest month is January.

1,410permits issued
727last 12 months
Janbusiest month
$900usual declared value
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 62Oct2024Nov 2024: 57Dec 2024: 59Jan 2025: 76Jan2025Feb 2025: 53Mar 2025: 58Apr 2025: 50May 2025: 50Jun 2025: 66Jul 2025: 43JulAug 2025: 63Sep 2025: 46Oct 2025: 74Nov 2025: 53Dec 2025: 52Jan 2026: 70Jan2026Feb 2026: 56Mar 2026: 53Apr 2026: 74May 2026: 58Jun 2026: 57Jul 2026: 60JulAug 2026: 59Sep 2026: 61
The same numbers as a table
MonthPermits
Oct 202462
Nov 202457
Dec 202459
Jan 202576
Feb 202553
Mar 202558
Apr 202550
May 202550
Jun 202566
Jul 202543
Aug 202563
Sep 202546
Oct 202574
Nov 202553
Dec 202552
Jan 202670
Feb 202656
Mar 202653
Apr 202674
May 202658
Jun 202657
Jul 202660
Aug 202659
Sep 202661

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). January is the busiest (124), July the quietest (88). A busy month at the permit counter usually means a longer wait for a contractor.

January: 124 (100 = an average month)124February: 93 (100 = an average month)March: 94 (100 = an average month)April: 106 (100 = an average month)May: 92 (100 = an average month)June: 105 (100 = an average month)July: 88 (100 = an average month)August: 104 (100 = an average month)September: 91 (100 = an average month)October: 116 (100 = an average month)November: 94 (100 = an average month)December: 94 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January124
February93
March94
April106
May92
June105
July88
August104
September91
October116
November94
December94

Download this table (CSV)

What a plumbing permit is declared at

The value written on the permit at application, from 1,410 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$900
Middle half$900–$900

Download this table (CSV)

Nearby permit data

Plumbing permits for other places in Sacramento. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Roseville open data, Building Permits Issued (data.roseville.ca.us), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Building permits the City of Roseville Development Services issues inside the city limits only. Rocklin, Granite Bay, Citrus Heights and unincorporated Placer County are outside the city and are not in this file.

  • The city's open permit file names no contractor, so there are no contractor lists, rankings or firm pages for Roseville.
  • The file lists each permit when it is issued and has no status, no final inspection date and no address or ZIP code, so these pages cannot show which permits finished, how long a permit takes, or where in the city the work was.
  • Homes are permits in the city's Residential group (new single-family homes, remodels, pools, patio covers, solar). Quick over-the-counter trade permits (heating and air, plumbing, electrical, re-roofs, windows) are mostly for homes but the file does not mark them, so they are not counted as homes.
  • The value is the job value on the permit, which sets the fee. It is not a final cost.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in Roseville, CA", https://contractorrecords.com/roseville-ca/plumbing-permits, data through September 2026, from the City of Roseville Development Services building-permit records.

Link to a table: By month · Season · Declared value.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: declared value.

Common questions

  • How many plumbing permits does Roseville issue a year?About 705 a year in Roseville: 1,410 permits issued October 2024 through September 2026, 727 of them in the last 12 months.
  • When do people in Roseville file the most plumbing permits?January (124 against an average month of 100); July is the quietest (88). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.