ADU and casita permits in the City of Santa Barbara, CA

Data through August 2025 · updated 19 Oct 2026

236 ADU and casita permits were issued in the City of Santa Barbara, September 2023 through August 2025: about 118 a year and 5% of all permits. 125 ADU and casita permits in the last 12 months on file (Sep 2024–Aug 2025), 13% more than the 111 in the 12 months before. The busiest month is August. The usual one took 296 days from issue to the city's final. 93101 has the most, 71.

236permits issued
125last 12 months on file
Augbusiest month
296days, usual issue to final
56%finished
Aug 2025records through

ADU and casita permits by month

Permits issued each month, September 2023 through August 2025.

Sep 2023: 10Sep2023Oct 2023: 10Nov 2023: 11Dec 2023: 8Jan 2024: 8Jan2024Feb 2024: 5Mar 2024: 1Apr 2024: 10May 2024: 7Jun 2024: 10Jul 2024: 10JulAug 2024: 21Sep 2024: 4Oct 2024: 12Nov 2024: 10Dec 2024: 6Jan 2025: 5Jan2025Feb 2025: 8Mar 2025: 18Apr 2025: 11May 2025: 11Jun 2025: 17Jul 2025: 12JulAug 2025: 11
The same numbers as a table
MonthPermits
Sep 202310
Oct 202310
Nov 202311
Dec 20238
Jan 20248
Feb 20245
Mar 20241
Apr 202410
May 20247
Jun 202410
Jul 202410
Aug 202421
Sep 20244
Oct 202412
Nov 202410
Dec 20246
Jan 20255
Feb 20258
Mar 202518
Apr 202511
May 202511
Jun 202517
Jul 202512
Aug 202511

Download this table (CSV)

When ADU and casita permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (163), January the quietest (66). A busy month at the permit counter usually means a longer wait for a contractor.

January: 66 (100 = an average month)February: 66 (100 = an average month)March: 97 (100 = an average month)April: 107 (100 = an average month)May: 92 (100 = an average month)June: 137 (100 = an average month)July: 112 (100 = an average month)August: 163 (100 = an average month)163September: 71 (100 = an average month)October: 112 (100 = an average month)November: 107 (100 = an average month)December: 71 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January66
February66
March97
April107
May92
June137
July112
August163
September71
October112
November107
December71

Download this table (CSV)

How long an ADU and casita permit takes

Permits issued Sep 2023–Aug 2024, at least 12 months before the file ends. Usual days is the middle permit among the 62 with a final date.

MeasureValue
Permits issued Sep 2023–Aug 2024111
Finished55.9%
Usual days, issue to final296
Middle half, days201–369

Download this table (CSV)

ZIP codes with the most ADU and casita permits

Counted at the property's ZIP code. Share is the part of the city's 236 ADU and casita permits.

ZIP codePermitsShare
931017130%
931035122%
931095122%
931054820%
9311073%
9310863%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential23097%
Residential Alteration31%
Residential Accessory Structure2under 1%
Commercial New1under 1%

Download this table (CSV)

How these numbers are made

Source: City of Santa Barbara GIS, Building Permits layer (Building_Permits FeatureServer, Accela BLD records), read 19 Oct 2026. We count permits issued September 2023 through August 2025; denied and withdrawn permits are left out.

Building and trade permits the City of Santa Barbara issues inside city limits: new homes and ADUs, additions, alterations, re-roofs, solar, electrical, mechanical, plumbing, pool, demolition and sign permits. Revisions to an earlier permit, flood-elevation determinations and other administrative records, and grading and paving sitework are not counted. Goleta, Montecito and the rest of unincorporated Santa Barbara County are permitted by other offices and are not in this file.

  • The city's layer names no contractor, so there are no contractor lists, rankings or firm pages for Santa Barbara.
  • The layer has no declared job value, so we show no costs.
  • The city has not added permits to this layer since early September 2025, so these pages end with August 2025.
  • A permit counts as finished when the city marks it complete; the final date is the layer's completed date.
  • Homes are permits the city codes as one- or two-family dwellings (its R and R-3 codes) and its 1 & 2 family express permits; apartment buildings count as other.
  • Electrical, mechanical and plumbing permits are separate from the building permit for the same job, so one project can count more than once.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "ADU and casita permits in the City of Santa Barbara, CA", https://contractorrecords.com/santa-barbara/adu-permits, data through August 2025, from City of Santa Barbara Community Development, Building & Safety building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): ADUs & casitas permits by month · ADUs & casitas permits by calendar month (index) · ADUs & casitas permits: days to final · ADUs & casitas permits by ZIP code · ADUs & casitas permits by permit type.

Common questions

  • How many ADU and casita permits does Santa Barbara issue a year?About 118 a year in the City of Santa Barbara: 236 permits issued September 2023 through August 2025, 125 of them in the last 12 months on file (to August 2025).
  • How long does an ADU and casita permit take in Santa Barbara?The usual one took 296 days from issue to the city's final inspection, and the middle half took 201 to 369 days (62 permits issued Sep 2023–Aug 2024 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Santa Barbara file the most ADU and casita permits?August (163 against an average month of 100); January is the quietest (66). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most ADU and casita permits in Santa Barbara?93101, with 71 of the 236 (30%); then 93103 (51).