Remodel and repair permits in the City of Santa Barbara, CA

Data through August 2025 · updated 19 Oct 2026

651 remodel and repair permits were issued in the City of Santa Barbara, September 2023 through August 2025: about 326 a year and 12% of all permits. 353 remodel and repair permits in the last 12 months on file (Sep 2024–Aug 2025), 18% more than the 298 in the 12 months before. The busiest month is October. The usual one took 126 days from issue to the city's final. 93105 has the most, 187.

651permits issued
353last 12 months on file
Octbusiest month
126days, usual issue to final
61%finished
Aug 2025records through

Remodel and repair permits by month

Permits issued each month, September 2023 through August 2025.

Sep 2023: 25Sep2023Oct 2023: 26Nov 2023: 23Dec 2023: 19Jan 2024: 29Jan2024Feb 2024: 20Mar 2024: 29Apr 2024: 28May 2024: 31Jun 2024: 23Jul 2024: 20JulAug 2024: 25Sep 2024: 22Oct 2024: 38Nov 2024: 26Dec 2024: 31Jan 2025: 26Jan2025Feb 2025: 24Mar 2025: 27Apr 2025: 33May 2025: 29Jun 2025: 32Jul 2025: 33JulAug 2025: 32
The same numbers as a table
MonthPermits
Sep 202325
Oct 202326
Nov 202323
Dec 202319
Jan 202429
Feb 202420
Mar 202429
Apr 202428
May 202431
Jun 202423
Jul 202420
Aug 202425
Sep 202422
Oct 202438
Nov 202426
Dec 202431
Jan 202526
Feb 202524
Mar 202527
Apr 202533
May 202529
Jun 202532
Jul 202533
Aug 202532

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (118), February the quietest (81). A busy month at the permit counter usually means a longer wait for a contractor.

January: 101 (100 = an average month)February: 81 (100 = an average month)March: 103 (100 = an average month)April: 112 (100 = an average month)May: 111 (100 = an average month)June: 101 (100 = an average month)July: 98 (100 = an average month)August: 105 (100 = an average month)September: 87 (100 = an average month)October: 118 (100 = an average month)118November: 90 (100 = an average month)December: 92 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January101
February81
March103
April112
May111
June101
July98
August105
September87
October118
November90
December92

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Sep 2023–Aug 2024, at least 12 months before the file ends. Usual days is the middle permit among the 183 with a final date.

MeasureValue
Permits issued Sep 2023–Aug 2024298
Finished61.4%
Usual days, issue to final126
Middle half, days55–229

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 651 remodel and repair permits.

ZIP codePermitsShare
9310518729%
9310914923%
9310314422%
9310112720%
93108315%
93110132%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential64499%
Residential Alteration4under 1%
Commercial New2under 1%
Residential Miscellaneous1under 1%

Download this table (CSV)

How Santa Barbara compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Santa Barbara GIS, Building Permits layer (Building_Permits FeatureServer, Accela BLD records), read 19 Oct 2026. We count permits issued September 2023 through August 2025; denied and withdrawn permits are left out.

Building and trade permits the City of Santa Barbara issues inside city limits: new homes and ADUs, additions, alterations, re-roofs, solar, electrical, mechanical, plumbing, pool, demolition and sign permits. Revisions to an earlier permit, flood-elevation determinations and other administrative records, and grading and paving sitework are not counted. Goleta, Montecito and the rest of unincorporated Santa Barbara County are permitted by other offices and are not in this file.

  • The city's layer names no contractor, so there are no contractor lists, rankings or firm pages for Santa Barbara.
  • The layer has no declared job value, so we show no costs.
  • The city has not added permits to this layer since early September 2025, so these pages end with August 2025.
  • A permit counts as finished when the city marks it complete; the final date is the layer's completed date.
  • Homes are permits the city codes as one- or two-family dwellings (its R and R-3 codes) and its 1 & 2 family express permits; apartment buildings count as other.
  • Electrical, mechanical and plumbing permits are separate from the building permit for the same job, so one project can count more than once.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in the City of Santa Barbara, CA", https://contractorrecords.com/santa-barbara/remodel-permits, data through August 2025, from City of Santa Barbara Community Development, Building & Safety building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Santa Barbara issue a year?About 326 a year in the City of Santa Barbara: 651 permits issued September 2023 through August 2025, 353 of them in the last 12 months on file (to August 2025).
  • How long does a remodel and repair permit take in Santa Barbara?The usual one took 126 days from issue to the city's final inspection, and the middle half took 55 to 229 days (183 permits issued Sep 2023–Aug 2024 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Santa Barbara file the most remodel and repair permits?October (118 against an average month of 100); February is the quietest (81). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Santa Barbara?93105, with 187 of the 651 (29%); then 93109 (149).