Roofing permits in the City of Santa Barbara, CA

Data through August 2025 · updated 19 Oct 2026

1,397 roofing permits were issued in the City of Santa Barbara, September 2023 through August 2025: about 698 a year and 27% of all permits. 679 roofing permits in the last 12 months on file (Sep 2024–Aug 2025), 5% fewer than the 718 in the 12 months before. The busiest month is April. The usual one took 40 days from issue to the city's final. 93101 has the most, 424.

1,397permits issued
679last 12 months on file
Aprbusiest month
40days, usual issue to final
61%finished
Aug 2025records through

Roofing permits by month

Permits issued each month, September 2023 through August 2025.

Sep 2023: 49Sep2023Oct 2023: 67Nov 2023: 54Dec 2023: 32Jan 2024: 58Jan2024Feb 2024: 54Mar 2024: 64Apr 2024: 70May 2024: 75Jun 2024: 65Jul 2024: 70JulAug 2024: 60Sep 2024: 62Oct 2024: 72Nov 2024: 47Dec 2024: 43Jan 2025: 57Jan2025Feb 2025: 41Mar 2025: 66Apr 2025: 77May 2025: 47Jun 2025: 55Jul 2025: 50JulAug 2025: 62
The same numbers as a table
MonthPermits
Sep 202349
Oct 202367
Nov 202354
Dec 202332
Jan 202458
Feb 202454
Mar 202464
Apr 202470
May 202475
Jun 202465
Jul 202470
Aug 202460
Sep 202462
Oct 202472
Nov 202447
Dec 202443
Jan 202557
Feb 202541
Mar 202566
Apr 202577
May 202547
Jun 202555
Jul 202550
Aug 202562

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (126), December the quietest (64). A busy month at the permit counter usually means a longer wait for a contractor.

January: 99 (100 = an average month)February: 82 (100 = an average month)March: 112 (100 = an average month)April: 126 (100 = an average month)126May: 105 (100 = an average month)June: 103 (100 = an average month)July: 103 (100 = an average month)August: 105 (100 = an average month)September: 95 (100 = an average month)October: 119 (100 = an average month)November: 87 (100 = an average month)December: 64 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January99
February82
March112
April126
May105
June103
July103
August105
September95
October119
November87
December64

Download this table (CSV)

How long a roofing permit takes

Permits issued Sep 2023–Aug 2024, at least 12 months before the file ends. Usual days is the middle permit among the 439 with a final date.

MeasureValue
Permits issued Sep 2023–Aug 2024718
Finished61.1%
Usual days, issue to final40
Middle half, days15–99

Download this table (CSV)

ZIP codes with the most roofing permits

Counted at the property's ZIP code. Share is the part of the city's 1,397 roofing permits.

ZIP codePermitsShare
9310142430%
9310539628%
9310325418%
9310922016%
93108524%
93110463%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Like-for-Like Reroofing83360%
Residential47234%
Commercial New886%
Reroof4under 1%

Download this table (CSV)

How Santa Barbara compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Santa Barbara GIS, Building Permits layer (Building_Permits FeatureServer, Accela BLD records), read 19 Oct 2026. We count permits issued September 2023 through August 2025; denied and withdrawn permits are left out.

Building and trade permits the City of Santa Barbara issues inside city limits: new homes and ADUs, additions, alterations, re-roofs, solar, electrical, mechanical, plumbing, pool, demolition and sign permits. Revisions to an earlier permit, flood-elevation determinations and other administrative records, and grading and paving sitework are not counted. Goleta, Montecito and the rest of unincorporated Santa Barbara County are permitted by other offices and are not in this file.

  • The city's layer names no contractor, so there are no contractor lists, rankings or firm pages for Santa Barbara.
  • The layer has no declared job value, so we show no costs.
  • The city has not added permits to this layer since early September 2025, so these pages end with August 2025.
  • A permit counts as finished when the city marks it complete; the final date is the layer's completed date.
  • Homes are permits the city codes as one- or two-family dwellings (its R and R-3 codes) and its 1 & 2 family express permits; apartment buildings count as other.
  • Electrical, mechanical and plumbing permits are separate from the building permit for the same job, so one project can count more than once.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in the City of Santa Barbara, CA", https://contractorrecords.com/santa-barbara/roofing-permits, data through August 2025, from City of Santa Barbara Community Development, Building & Safety building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: days to final · Roofing permits by ZIP code · Roofing permits by permit type.

Common questions

  • How many roofing permits does Santa Barbara issue a year?About 698 a year in the City of Santa Barbara: 1,397 permits issued September 2023 through August 2025, 679 of them in the last 12 months on file (to August 2025).
  • How long does a roofing permit take in Santa Barbara?The usual one took 40 days from issue to the city's final inspection, and the middle half took 15 to 99 days (439 permits issued Sep 2023–Aug 2024 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Santa Barbara file the most roofing permits?April (126 against an average month of 100); December is the quietest (64). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most roofing permits in Santa Barbara?93101, with 424 of the 1,397 (30%); then 93105 (396).