Plumbing permits in the City of Santa Barbara, CA

Data through August 2025 · updated 19 Oct 2026

408 plumbing permits were issued in the City of Santa Barbara, September 2023 through August 2025: about 204 a year and 8% of all permits. 208 plumbing permits in the last 12 months on file (Sep 2024–Aug 2025), 4% more than the 200 in the 12 months before. The busiest month is April. The usual one took 18 days from issue to the city's final. 93101 has the most, 121.

408permits issued
208last 12 months on file
Aprbusiest month
18days, usual issue to final
46%finished
Aug 2025records through

Plumbing permits by month

Permits issued each month, September 2023 through August 2025.

Sep 2023: 18Sep2023Oct 2023: 11Nov 2023: 11Dec 2023: 8Jan 2024: 14Jan2024Feb 2024: 17Mar 2024: 32Apr 2024: 21May 2024: 19Jun 2024: 18Jul 2024: 16JulAug 2024: 15Sep 2024: 11Oct 2024: 22Nov 2024: 9Dec 2024: 15Jan 2025: 19Jan2025Feb 2025: 16Mar 2025: 15Apr 2025: 27May 2025: 21Jun 2025: 16Jul 2025: 16JulAug 2025: 21
The same numbers as a table
MonthPermits
Sep 202318
Oct 202311
Nov 202311
Dec 20238
Jan 202414
Feb 202417
Mar 202432
Apr 202421
May 202419
Jun 202418
Jul 202416
Aug 202415
Sep 202411
Oct 202422
Nov 20249
Dec 202415
Jan 202519
Feb 202516
Mar 202515
Apr 202527
May 202521
Jun 202516
Jul 202516
Aug 202521

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (141), November the quietest (59). A busy month at the permit counter usually means a longer wait for a contractor.

January: 97 (100 = an average month)February: 97 (100 = an average month)March: 138 (100 = an average month)April: 141 (100 = an average month)141May: 118 (100 = an average month)June: 100 (100 = an average month)July: 94 (100 = an average month)August: 106 (100 = an average month)September: 85 (100 = an average month)October: 97 (100 = an average month)November: 59 (100 = an average month)December: 68 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January97
February97
March138
April141
May118
June100
July94
August106
September85
October97
November59
December68

Download this table (CSV)

How long a plumbing permit takes

Permits issued Sep 2023–Aug 2024, at least 12 months before the file ends. Usual days is the middle permit among the 91 with a final date.

MeasureValue
Permits issued Sep 2023–Aug 2024200
Finished45.5%
Usual days, issue to final18
Middle half, days4–61

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the city's 408 plumbing permits.

ZIP codePermitsShare
9310112130%
9310510526%
931099223%
931037017%
93110113%
9310892%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential17543%
Plumbing16039%
Commercial New266%
1 & 2 Family Home Water Heater Replacement266%
1 & 2 Family Home Like-for-Like Water Heater Replacement113%
Underground Gas Service4under 1%
Underground Water Service3under 1%
Mechanical3under 1%

Download this table (CSV)

How Santa Barbara compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Santa Barbara GIS, Building Permits layer (Building_Permits FeatureServer, Accela BLD records), read 19 Oct 2026. We count permits issued September 2023 through August 2025; denied and withdrawn permits are left out.

Building and trade permits the City of Santa Barbara issues inside city limits: new homes and ADUs, additions, alterations, re-roofs, solar, electrical, mechanical, plumbing, pool, demolition and sign permits. Revisions to an earlier permit, flood-elevation determinations and other administrative records, and grading and paving sitework are not counted. Goleta, Montecito and the rest of unincorporated Santa Barbara County are permitted by other offices and are not in this file.

  • The city's layer names no contractor, so there are no contractor lists, rankings or firm pages for Santa Barbara.
  • The layer has no declared job value, so we show no costs.
  • The city has not added permits to this layer since early September 2025, so these pages end with August 2025.
  • A permit counts as finished when the city marks it complete; the final date is the layer's completed date.
  • Homes are permits the city codes as one- or two-family dwellings (its R and R-3 codes) and its 1 & 2 family express permits; apartment buildings count as other.
  • Electrical, mechanical and plumbing permits are separate from the building permit for the same job, so one project can count more than once.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in the City of Santa Barbara, CA", https://contractorrecords.com/santa-barbara/plumbing-permits, data through August 2025, from City of Santa Barbara Community Development, Building & Safety building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits by ZIP code · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Santa Barbara issue a year?About 204 a year in the City of Santa Barbara: 408 permits issued September 2023 through August 2025, 208 of them in the last 12 months on file (to August 2025).
  • How long does a plumbing permit take in Santa Barbara?The usual one took 18 days from issue to the city's final inspection, and the middle half took 4 to 61 days (91 permits issued Sep 2023–Aug 2024 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Santa Barbara file the most plumbing permits?April (141 against an average month of 100); November is the quietest (59). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in Santa Barbara?93101, with 121 of the 408 (30%); then 93105 (105).