Roofing permits in the City of Sioux Falls, SD

Data through September 2026 · updated 19 Oct 2026

1,719 roofing permits were issued in the City of Sioux Falls, October 2024 through September 2026: about 860 a year and 7% of all permits. 945 roofing permits in the last 12 months (Oct 2025–Sep 2026), 22% more than the 774 in the 12 months before. The busiest month is April. The usual one took 68 days from issue to the city's final. 57108 has the most, 394.

1,719permits issued
945last 12 months
Aprbusiest month
68days, usual issue to final
96%finished
$12,000usual declared value
Sep 2026records through

Roofing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 73Oct2024Nov 2024: 34Dec 2024: 14Jan 2025: 12Jan2025Feb 2025: 6Mar 2025: 34Apr 2025: 208May 2025: 72Jun 2025: 65Jul 2025: 69JulAug 2025: 98Sep 2025: 89Oct 2025: 105Nov 2025: 27Dec 2025: 7Jan 2026: 8Jan2026Feb 2026: 15Mar 2026: 46Apr 2026: 83May 2026: 109Jun 2026: 118Jul 2026: 128JulAug 2026: 150Sep 2026: 149
The same numbers as a table
MonthPermits
Oct 202473
Nov 202434
Dec 202414
Jan 202512
Feb 20256
Mar 202534
Apr 2025208
May 202572
Jun 202565
Jul 202569
Aug 202598
Sep 202589
Oct 2025105
Nov 202527
Dec 20257
Jan 20268
Feb 202615
Mar 202646
Apr 202683
May 2026109
Jun 2026118
Jul 2026128
Aug 2026150
Sep 2026149

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (203), January the quietest (14). A busy month at the permit counter usually means a longer wait for a contractor.

January: 14 (100 = an average month)February: 15 (100 = an average month)March: 56 (100 = an average month)April: 203 (100 = an average month)203May: 126 (100 = an average month)June: 128 (100 = an average month)July: 138 (100 = an average month)August: 173 (100 = an average month)September: 166 (100 = an average month)October: 124 (100 = an average month)November: 43 (100 = an average month)December: 15 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January14
February15
March56
April203
May126
June128
July138
August173
September166
October124
November43
December15

Download this table (CSV)

How long a roofing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 743 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025774
Finished96.5%
Expired1.2%
Usual days, issue to final68
Middle half, days18–126

Download this table (CSV)

What a roofing permit is declared at

The value written on the permit at application, from 1,719 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$12,000
Middle half$8,250–$16,571

Download this table (CSV)

ZIP codes with the most roofing permits

Counted at the property's ZIP code. Share is the part of the city's 1,719 roofing permits.

ZIP codePermitsShare
5710839423%
5710336021%
5710630218%
5710528817%
5710419211%
571101167%
57107674%

Download this table (CSV)

How Sioux Falls compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Sioux Falls GIS: Building Permits (Data/Community MapServer layer 3), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential and commercial building permits the City of Sioux Falls issues inside city limits, in both Minnehaha and Lincoln counties: new homes and buildings, additions, remodels and repairs, re-shingling, decks, pools, demolition, and electrical, plumbing and mechanical permits. Brandon, Harrisburg, Tea and the unincorporated parts of both counties run their own permit offices and are not in this file.

  • The city's file has a contractor column, but it is empty on every row, so there are no contractor lists, rankings or firm pages for Sioux Falls.
  • A final date is the city's finalized date; a permit marked finaled counts as finished.
  • The value is the valuation declared on the permit.
  • Homes are the city's residential building permits, which include electrical, plumbing and mechanical permits for homes. Commercial remodels, additions and build-outs count as other.
  • Mechanical permits for fireplaces and refrigeration count as HVAC; re-shingle permits count as roofing; decks count with garages, sheds and shade structures.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in the City of Sioux Falls, SD", https://contractorrecords.com/sioux-falls/roofing-permits, data through September 2026, from City of Sioux Falls Planning & Development Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: days to final · Roofing permits: declared value · Roofing permits by ZIP code.

Common questions

  • How many roofing permits does Sioux Falls issue a year?About 860 a year in the City of Sioux Falls: 1,719 permits issued October 2024 through September 2026, 945 of them in the last 12 months.
  • How long does a roofing permit take in Sioux Falls?The usual one took 68 days from issue to the city's final inspection, and the middle half took 18 to 126 days (743 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Sioux Falls file the most roofing permits?April (203 against an average month of 100); January is the quietest (14). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most roofing permits in Sioux Falls?57108, with 394 of the 1,719 (23%); then 57103 (360).