HVAC permits in the City of Sioux Falls, SD

Data through September 2026 · updated 19 Oct 2026

4,247 HVAC permits were issued in the City of Sioux Falls, October 2024 through September 2026: about 2,124 a year and 17% of all permits. 2,052 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 7% fewer than the 2,195 in the 12 months before. The busiest month is November. The usual one took 175 days from issue to the city's final. 57110 has the most, 1,326.

4,247permits issued
2,052last 12 months
Novbusiest month
175days, usual issue to final
93%finished
$200,201usual declared value
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 195Oct2024Nov 2024: 280Dec 2024: 132Jan 2025: 162Jan2025Feb 2025: 128Mar 2025: 152Apr 2025: 172May 2025: 221Jun 2025: 190Jul 2025: 177JulAug 2025: 154Sep 2025: 232Oct 2025: 217Nov 2025: 144Dec 2025: 135Jan 2026: 176Jan2026Feb 2026: 128Mar 2026: 172Apr 2026: 185May 2026: 156Jun 2026: 204Jul 2026: 164JulAug 2026: 198Sep 2026: 173
The same numbers as a table
MonthPermits
Oct 2024195
Nov 2024280
Dec 2024132
Jan 2025162
Feb 2025128
Mar 2025152
Apr 2025172
May 2025221
Jun 2025190
Jul 2025177
Aug 2025154
Sep 2025232
Oct 2025217
Nov 2025144
Dec 2025135
Jan 2026176
Feb 2026128
Mar 2026172
Apr 2026185
May 2026156
Jun 2026204
Jul 2026164
Aug 2026198
Sep 2026173

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). November is the busiest (120), February the quietest (72). A busy month at the permit counter usually means a longer wait for a contractor.

January: 96 (100 = an average month)February: 72 (100 = an average month)March: 92 (100 = an average month)April: 101 (100 = an average month)May: 107 (100 = an average month)June: 111 (100 = an average month)July: 96 (100 = an average month)August: 99 (100 = an average month)September: 114 (100 = an average month)October: 116 (100 = an average month)November: 120 (100 = an average month)120December: 75 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January96
February72
March92
April101
May107
June111
July96
August99
September114
October116
November120
December75

Download this table (CSV)

How long an HVAC permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 2,020 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20252,195
Finished92.9%
Expired0.1%
Usual days, issue to final175
Middle half, days79–274

Download this table (CSV)

What an HVAC permit is declared at

The value written on the permit at application, from 4,237 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$200,201
Middle half$44,000–$325,000

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 4,247 HVAC permits.

ZIP codePermitsShare
571101,32631%
5710891822%
5710660314%
5710740810%
571043809%
571053558%
571032526%
571973under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Mechanical3,72788%
Mechanical Fireplace46011%
Mechanical Refrigeration601%

Download this table (CSV)

How Sioux Falls compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Sioux Falls GIS: Building Permits (Data/Community MapServer layer 3), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential and commercial building permits the City of Sioux Falls issues inside city limits, in both Minnehaha and Lincoln counties: new homes and buildings, additions, remodels and repairs, re-shingling, decks, pools, demolition, and electrical, plumbing and mechanical permits. Brandon, Harrisburg, Tea and the unincorporated parts of both counties run their own permit offices and are not in this file.

  • The city's file has a contractor column, but it is empty on every row, so there are no contractor lists, rankings or firm pages for Sioux Falls.
  • A final date is the city's finalized date; a permit marked finaled counts as finished.
  • The value is the valuation declared on the permit.
  • Homes are the city's residential building permits, which include electrical, plumbing and mechanical permits for homes. Commercial remodels, additions and build-outs count as other.
  • Mechanical permits for fireplaces and refrigeration count as HVAC; re-shingle permits count as roofing; decks count with garages, sheds and shade structures.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in the City of Sioux Falls, SD", https://contractorrecords.com/sioux-falls/hvac-permits, data through September 2026, from City of Sioux Falls Planning & Development Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: days to final · HVAC permits: declared value · HVAC permits by ZIP code · HVAC permits by permit type.

Common questions

  • How many HVAC permits does Sioux Falls issue a year?About 2,124 a year in the City of Sioux Falls: 4,247 permits issued October 2024 through September 2026, 2,052 of them in the last 12 months.
  • How long does an HVAC permit take in Sioux Falls?The usual one took 175 days from issue to the city's final inspection, and the middle half took 79 to 274 days (2,020 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Sioux Falls file the most HVAC permits?November (120 against an average month of 100); February is the quietest (72). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Sioux Falls?57110, with 1,326 of the 4,247 (31%); then 57108 (918).