Garage, shed and shade structure permits in unincorporated Sonoma County, CA

Data through May 2025 · updated 23 Oct 2026

455 garage, shed and shade structure permits were issued in unincorporated Sonoma County, June 2023 through May 2025: about 228 a year and 3% of all permits. 230 garage, shed and shade structure permits in the last 12 months on file (Jun 2024–May 2025), 2% more than the 225 in the 12 months before. The busiest month is July.

455permits issued
230last 12 months on file
Julbusiest month
52%finished
May 2025records through

Garage, shed and shade structure permits by month

Permits issued each month, June 2023 through May 2025.

Jun 2023: 17Jun2023Jul 2023: 23JulAug 2023: 20Sep 2023: 20Oct 2023: 20Nov 2023: 16Dec 2023: 20Jan 2024: 23Jan2024Feb 2024: 13Mar 2024: 18Apr 2024: 15May 2024: 20Jun 2024: 21Jul 2024: 22JulAug 2024: 25Sep 2024: 24Oct 2024: 22Nov 2024: 19Dec 2024: 13Jan 2025: 15Jan2025Feb 2025: 9Mar 2025: 13Apr 2025: 25May 2025: 22
The same numbers as a table
MonthPermits
Jun 202317
Jul 202323
Aug 202320
Sep 202320
Oct 202320
Nov 202316
Dec 202320
Jan 202423
Feb 202413
Mar 202418
Apr 202415
May 202420
Jun 202421
Jul 202422
Aug 202425
Sep 202424
Oct 202422
Nov 202419
Dec 202413
Jan 202515
Feb 20259
Mar 202513
Apr 202525
May 202522

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (119), February the quietest (58). A busy month at the permit counter usually means a longer wait for a contractor.

January: 100 (100 = an average month)February: 58 (100 = an average month)March: 82 (100 = an average month)April: 105 (100 = an average month)May: 111 (100 = an average month)June: 100 (100 = an average month)July: 119 (100 = an average month)119August: 119 (100 = an average month)September: 116 (100 = an average month)October: 111 (100 = an average month)November: 92 (100 = an average month)December: 87 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January100
February58
March82
April105
May111
June100
July119
August119
September116
October111
November92
December87

Download this table (CSV)

How many garage, shed and shade structure permits get finished

Permits issued Jun 2023–May 2024, at least 12 months before the file ends.

MeasureValue
Permits issued Jun 2023–May 2024225
Finished52.0%
Expired0.0%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building Permit With Plan Check41591%
Building Permit No Plan Check409%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in the Bay Area. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Sonoma County Open Data, Sonoma County Construction Permits (Socrata dataset 88ms-k5e7), read 23 Oct 2026. We count permits issued June 2023 through May 2025; denied and withdrawn permits are left out.

Building, solar and demolition permits Permit Sonoma issues for unincorporated Sonoma County only (Sonoma Valley, Guerneville and the Russian River, Glen Ellen, Larkfield-Wikiup, Bodega Bay, Penngrove and other rural areas). Santa Rosa, Petaluma, Rohnert Park, Windsor, Healdsburg, Sonoma, Cotati, Sebastopol and Cloverdale run their own building departments and are not in this file. Encroachment, septic, well, grading and sewer permits are left out.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Sonoma County.
  • The county's open file holds only permits started from October 23, 2022 to May 30, 2025 and has not added newer permits since, so these pages end with May 2025. The window starts in June 2023 because permits applied for before the file begins and issued later are missing, which undercounts the first months.
  • Finished means the county's status is Finaled. Expired permits lapsed without a final; denied and cancelled permits are not counted. The file has no final date, so we show no time to final.
  • Permit Sonoma files most work under two broad types (with or without plan check), so the kind of work is read from the permit description: solar, reroofs, furnaces and heat pumps, water heaters, panels and so on. Permits with no description count as other.
  • The file can't reliably tell homes from other property, and it has no declared value on most permits and no ZIP code, so there are no homes figures, costs or ZIP pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in unincorporated Sonoma County, CA", https://contractorrecords.com/sonoma-county/accessory-permits, data through May 2025, from Permit Sonoma (Sonoma County Permit and Resource Management Department) building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: finished share · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Sonoma County issue a year?About 228 a year in unincorporated Sonoma County: 455 permits issued June 2023 through May 2025, 230 of them in the last 12 months on file (to May 2025).
  • When do people in Sonoma County file the most garage, shed and shade structure permits?July (119 against an average month of 100); February is the quietest (58). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.