Electrical permits in unincorporated Sonoma County, CA

Data through May 2025 · updated 23 Oct 2026

2,055 electrical permits were issued in unincorporated Sonoma County, June 2023 through May 2025: about 1,028 a year and 14% of all permits. 793 electrical permits in the last 12 months on file (Jun 2024–May 2025), 37% fewer than the 1,262 in the 12 months before. The busiest month is July.

2,055permits issued
793last 12 months on file
Julbusiest month
68%finished
May 2025records through

Electrical permits by month

Permits issued each month, June 2023 through May 2025.

Jun 2023: 101Jun2023Jul 2023: 125JulAug 2023: 109Sep 2023: 88Oct 2023: 97Nov 2023: 91Dec 2023: 80Jan 2024: 107Jan2024Feb 2024: 103Mar 2024: 130Apr 2024: 123May 2024: 108Jun 2024: 110Jul 2024: 108JulAug 2024: 84Sep 2024: 80Oct 2024: 65Nov 2024: 45Dec 2024: 59Jan 2025: 48Jan2025Feb 2025: 44Mar 2025: 49Apr 2025: 50May 2025: 51
The same numbers as a table
MonthPermits
Jun 2023101
Jul 2023125
Aug 2023109
Sep 202388
Oct 202397
Nov 202391
Dec 202380
Jan 2024107
Feb 2024103
Mar 2024130
Apr 2024123
May 2024108
Jun 2024110
Jul 2024108
Aug 202484
Sep 202480
Oct 202465
Nov 202445
Dec 202459
Jan 202548
Feb 202544
Mar 202549
Apr 202550
May 202551

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (136), November the quietest (79). A busy month at the permit counter usually means a longer wait for a contractor.

January: 91 (100 = an average month)February: 86 (100 = an average month)March: 105 (100 = an average month)April: 101 (100 = an average month)May: 93 (100 = an average month)June: 123 (100 = an average month)July: 136 (100 = an average month)136August: 113 (100 = an average month)September: 98 (100 = an average month)October: 95 (100 = an average month)November: 79 (100 = an average month)December: 81 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January91
February86
March105
April101
May93
June123
July136
August113
September98
October95
November79
December81

Download this table (CSV)

How many electrical permits get finished

Permits issued Jun 2023–May 2024, at least 12 months before the file ends.

MeasureValue
Permits issued Jun 2023–May 20241,262
Finished67.6%
Expired0.0%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building Permit No Plan Check1,46271%
Building Permit With Plan Check59329%

Download this table (CSV)

How Sonoma County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in the Bay Area. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Sonoma County Open Data, Sonoma County Construction Permits (Socrata dataset 88ms-k5e7), read 23 Oct 2026. We count permits issued June 2023 through May 2025; denied and withdrawn permits are left out.

Building, solar and demolition permits Permit Sonoma issues for unincorporated Sonoma County only (Sonoma Valley, Guerneville and the Russian River, Glen Ellen, Larkfield-Wikiup, Bodega Bay, Penngrove and other rural areas). Santa Rosa, Petaluma, Rohnert Park, Windsor, Healdsburg, Sonoma, Cotati, Sebastopol and Cloverdale run their own building departments and are not in this file. Encroachment, septic, well, grading and sewer permits are left out.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Sonoma County.
  • The county's open file holds only permits started from October 23, 2022 to May 30, 2025 and has not added newer permits since, so these pages end with May 2025. The window starts in June 2023 because permits applied for before the file begins and issued later are missing, which undercounts the first months.
  • Finished means the county's status is Finaled. Expired permits lapsed without a final; denied and cancelled permits are not counted. The file has no final date, so we show no time to final.
  • Permit Sonoma files most work under two broad types (with or without plan check), so the kind of work is read from the permit description: solar, reroofs, furnaces and heat pumps, water heaters, panels and so on. Permits with no description count as other.
  • The file can't reliably tell homes from other property, and it has no declared value on most permits and no ZIP code, so there are no homes figures, costs or ZIP pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in unincorporated Sonoma County, CA", https://contractorrecords.com/sonoma-county/electrical-permits, data through May 2025, from Permit Sonoma (Sonoma County Permit and Resource Management Department) building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: finished share · Electrical permits by permit type.

Common questions

  • How many electrical permits does Sonoma County issue a year?About 1,028 a year in unincorporated Sonoma County: 2,055 permits issued June 2023 through May 2025, 793 of them in the last 12 months on file (to May 2025).
  • When do people in Sonoma County file the most electrical permits?July (136 against an average month of 100); November is the quietest (79). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.