Contractor Records
Home › Sonoma County › Plumbing

Plumbing permits in unincorporated Sonoma County, CA

Data through May 2025 · updated 23 Oct 2026

428 plumbing permits were issued in unincorporated Sonoma County, June 2023 through May 2025: about 214 a year and 3% of all permits. 183 plumbing permits in the last 12 months on file (Jun 2024–May 2025), 25% fewer than the 245 in the 12 months before. The busiest month is June.

428permits issued
183last 12 months on file
Junbusiest month
62%finished
May 2025records through

Plumbing permits by month

Permits issued each month, June 2023 through May 2025.

Jun 2023: 30Jun2023Jul 2023: 24JulAug 2023: 19Sep 2023: 19Oct 2023: 17Nov 2023: 19Dec 2023: 20Jan 2024: 25Jan2024Feb 2024: 21Mar 2024: 20Apr 2024: 20May 2024: 11Jun 2024: 14Jul 2024: 20JulAug 2024: 16Sep 2024: 17Oct 2024: 19Nov 2024: 12Dec 2024: 12Jan 2025: 18Jan2025Feb 2025: 8Mar 2025: 23Apr 2025: 11May 2025: 13
The same numbers as a table
MonthPermits
Jun 202330
Jul 202324
Aug 202319
Sep 202319
Oct 202317
Nov 202319
Dec 202320
Jan 202425
Feb 202421
Mar 202420
Apr 202420
May 202411
Jun 202414
Jul 202420
Aug 202416
Sep 202417
Oct 202419
Nov 202412
Dec 202412
Jan 202518
Feb 20258
Mar 202523
Apr 202511
May 202513

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (123), May the quietest (67). A busy month at the permit counter usually means a longer wait for a contractor.

January: 121 (100 = an average month)February: 81 (100 = an average month)March: 121 (100 = an average month)April: 87 (100 = an average month)May: 67 (100 = an average month)June: 123 (100 = an average month)123July: 123 (100 = an average month)August: 98 (100 = an average month)September: 101 (100 = an average month)October: 101 (100 = an average month)November: 87 (100 = an average month)December: 90 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January121
February81
March121
April87
May67
June123
July123
August98
September101
October101
November87
December90

Download this table (CSV)

How many plumbing permits get finished

Permits issued Jun 2023–May 2024, at least 12 months before the file ends.

MeasureValue
Permits issued Jun 2023–May 2024245
Finished62.4%
Expired0.4%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building Permit No Plan Check33979%
Building Permit With Plan Check8921%

Download this table (CSV)

How Sonoma County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in the Bay Area. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Sonoma County Open Data, Sonoma County Construction Permits (Socrata dataset 88ms-k5e7), read 23 Oct 2026. We count permits issued June 2023 through May 2025; denied and withdrawn permits are left out.

Building, solar and demolition permits Permit Sonoma issues for unincorporated Sonoma County only (Sonoma Valley, Guerneville and the Russian River, Glen Ellen, Larkfield-Wikiup, Bodega Bay, Penngrove and other rural areas). Santa Rosa, Petaluma, Rohnert Park, Windsor, Healdsburg, Sonoma, Cotati, Sebastopol and Cloverdale run their own building departments and are not in this file. Encroachment, septic, well, grading and sewer permits are left out.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Sonoma County.
  • The county's open file holds only permits started from October 23, 2022 to May 30, 2025 and has not added newer permits since, so these pages end with May 2025. The window starts in June 2023 because permits applied for before the file begins and issued later are missing, which undercounts the first months.
  • Finished means the county's status is Finaled. Expired permits lapsed without a final; denied and cancelled permits are not counted. The file has no final date, so we show no time to final.
  • Permit Sonoma files most work under two broad types (with or without plan check), so the kind of work is read from the permit description: solar, reroofs, furnaces and heat pumps, water heaters, panels and so on. Permits with no description count as other.
  • The file can't reliably tell homes from other property, and it has no declared value on most permits and no ZIP code, so there are no homes figures, costs or ZIP pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in unincorporated Sonoma County, CA", https://contractorrecords.com/sonoma-county/plumbing-permits, data through May 2025, from Permit Sonoma (Sonoma County Permit and Resource Management Department) building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: finished share · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Sonoma County issue a year?About 214 a year in unincorporated Sonoma County: 428 permits issued June 2023 through May 2025, 183 of them in the last 12 months on file (to May 2025).
  • When do people in Sonoma County file the most plumbing permits?June (123 against an average month of 100); May is the quietest (67). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.