Roofing permits in unincorporated Sonoma County, CA

Data through May 2025 · updated 23 Oct 2026

1,376 roofing permits were issued in unincorporated Sonoma County, June 2023 through May 2025: about 688 a year and 10% of all permits. 468 roofing permits in the last 12 months on file (Jun 2024–May 2025), 48% fewer than the 908 in the 12 months before. The busiest month is July.

1,376permits issued
468last 12 months on file
Julbusiest month
72%finished
May 2025records through

Roofing permits by month

Permits issued each month, June 2023 through May 2025.

Jun 2023: 124Jun2023Jul 2023: 121JulAug 2023: 124Sep 2023: 95Oct 2023: 96Nov 2023: 47Dec 2023: 45Jan 2024: 55Jan2024Feb 2024: 42Mar 2024: 52Apr 2024: 60May 2024: 47Jun 2024: 41Jul 2024: 59JulAug 2024: 49Sep 2024: 50Oct 2024: 43Nov 2024: 34Dec 2024: 25Jan 2025: 26Jan2025Feb 2025: 23Mar 2025: 35Apr 2025: 44May 2025: 39
The same numbers as a table
MonthPermits
Jun 2023124
Jul 2023121
Aug 2023124
Sep 202395
Oct 202396
Nov 202347
Dec 202345
Jan 202455
Feb 202442
Mar 202452
Apr 202460
May 202447
Jun 202441
Jul 202459
Aug 202449
Sep 202450
Oct 202443
Nov 202434
Dec 202425
Jan 202526
Feb 202523
Mar 202535
Apr 202544
May 202539

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (157), February the quietest (57). A busy month at the permit counter usually means a longer wait for a contractor.

January: 71 (100 = an average month)February: 57 (100 = an average month)March: 76 (100 = an average month)April: 91 (100 = an average month)May: 75 (100 = an average month)June: 144 (100 = an average month)July: 157 (100 = an average month)157August: 151 (100 = an average month)September: 126 (100 = an average month)October: 121 (100 = an average month)November: 71 (100 = an average month)December: 61 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January71
February57
March76
April91
May75
June144
July157
August151
September126
October121
November71
December61

Download this table (CSV)

How many roofing permits get finished

Permits issued Jun 2023–May 2024, at least 12 months before the file ends.

MeasureValue
Permits issued Jun 2023–May 2024908
Finished71.7%
Expired0.2%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building Permit No Plan Check99472%
Building Permit With Plan Check38228%

Download this table (CSV)

How Sonoma County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Roofing permits for other places in the Bay Area. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Sonoma County Open Data, Sonoma County Construction Permits (Socrata dataset 88ms-k5e7), read 23 Oct 2026. We count permits issued June 2023 through May 2025; denied and withdrawn permits are left out.

Building, solar and demolition permits Permit Sonoma issues for unincorporated Sonoma County only (Sonoma Valley, Guerneville and the Russian River, Glen Ellen, Larkfield-Wikiup, Bodega Bay, Penngrove and other rural areas). Santa Rosa, Petaluma, Rohnert Park, Windsor, Healdsburg, Sonoma, Cotati, Sebastopol and Cloverdale run their own building departments and are not in this file. Encroachment, septic, well, grading and sewer permits are left out.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Sonoma County.
  • The county's open file holds only permits started from October 23, 2022 to May 30, 2025 and has not added newer permits since, so these pages end with May 2025. The window starts in June 2023 because permits applied for before the file begins and issued later are missing, which undercounts the first months.
  • Finished means the county's status is Finaled. Expired permits lapsed without a final; denied and cancelled permits are not counted. The file has no final date, so we show no time to final.
  • Permit Sonoma files most work under two broad types (with or without plan check), so the kind of work is read from the permit description: solar, reroofs, furnaces and heat pumps, water heaters, panels and so on. Permits with no description count as other.
  • The file can't reliably tell homes from other property, and it has no declared value on most permits and no ZIP code, so there are no homes figures, costs or ZIP pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in unincorporated Sonoma County, CA", https://contractorrecords.com/sonoma-county/roofing-permits, data through May 2025, from Permit Sonoma (Sonoma County Permit and Resource Management Department) building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: finished share · Roofing permits by permit type.

Common questions

  • How many roofing permits does Sonoma County issue a year?About 688 a year in unincorporated Sonoma County: 1,376 permits issued June 2023 through May 2025, 468 of them in the last 12 months on file (to May 2025).
  • When do people in Sonoma County file the most roofing permits?July (157 against an average month of 100); February is the quietest (57). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.