Contractor Records
Home › Washington, DC › Plumbing

Plumbing permits in Washington, DC

Data through September 2026 · updated 19 Oct 2026

26,820 plumbing permits were issued in Washington, DC, October 2024 through September 2026: about 13,410 a year and 29% of all permits. 13,850 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 7% more than the 12,970 in the 12 months before. The busiest month is April. 20002 has the most, 3,597.

26,820permits issued
13,850last 12 months
Aprbusiest month
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 1,096Oct2024Nov 2024: 919Dec 2024: 989Jan 2025: 967Jan2025Feb 2025: 1,005Mar 2025: 1,245Apr 2025: 1,315May 2025: 1,135Jun 2025: 1,052Jul 2025: 1,008JulAug 2025: 1,049Sep 2025: 1,190Oct 2025: 1,164Nov 2025: 1,260Dec 2025: 1,037Jan 2026: 1,186Jan2026Feb 2026: 1,063Mar 2026: 1,169Apr 2026: 1,126May 2026: 1,067Jun 2026: 1,273Jul 2026: 1,300JulAug 2026: 1,115Sep 2026: 1,090
The same numbers as a table
MonthPermits
Oct 20241,096
Nov 2024919
Dec 2024989
Jan 2025967
Feb 20251,005
Mar 20251,245
Apr 20251,315
May 20251,135
Jun 20251,052
Jul 20251,008
Aug 20251,049
Sep 20251,190
Oct 20251,164
Nov 20251,260
Dec 20251,037
Jan 20261,186
Feb 20261,063
Mar 20261,169
Apr 20261,126
May 20261,067
Jun 20261,273
Jul 20261,300
Aug 20261,115
Sep 20261,090

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (109), December the quietest (91). A busy month at the permit counter usually means a longer wait for a contractor.

January: 96 (100 = an average month)February: 93 (100 = an average month)March: 108 (100 = an average month)April: 109 (100 = an average month)109May: 99 (100 = an average month)June: 104 (100 = an average month)July: 103 (100 = an average month)August: 97 (100 = an average month)September: 102 (100 = an average month)October: 101 (100 = an average month)November: 97 (100 = an average month)December: 91 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January96
February93
March108
April109
May99
June104
July103
August97
September102
October101
November97
December91

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the city's 26,820 plumbing permits.

ZIP codePermitsShare
200023,59713%
200113,21312%
200011,9567%
200031,7106%
200071,5216%
200161,5016%
200201,4866%
200101,4385%
200191,2385%
200091,1874%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Plumbing And Gas20,46876%
Plumbing3,95515%
Alteration And Repair1,4375%
Gas Fitting5422%
Miscellaneous218under 1%
Addition Alteration Repair200under 1%

Download this table (CSV)

Nearby permit data

Plumbing permits for other places in Washington, DC. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: DC Department of Buildings, Building Permits in 2009 to 2026 (DC GIS FEEDS/DCRA FeatureServer, Open Data DC), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Building, trade and post-card permits the DC Department of Buildings issues across the whole District of Columbia. Home occupation permits, elevator shop drawings, civil plans, variances and after-hours work permits are left out. Arlington, Alexandria and the Maryland suburbs run their own permit offices and are not in this file.

  • The District's permit file names no contractor (the applicant is usually the person who filed), so there are no contractor lists, rankings or firm pages for Washington.
  • The file has no declared job value, only the fees paid, so we show no costs.
  • The Department of Buildings seldom updates a permit's status once the work is done, and the file has no final dates, so we show no finished share and no time to final.
  • Electrical, plumbing and mechanical work is filed as separate supplemental or post-card permits, so one job can count several times.
  • Homes are permits on land zoned for houses, rowhouses and flats (the R and RF zones). Apartment, downtown and mixed-use zones count as other.
  • Home occupation permits, elevator shop drawings, civil plans, variances, sheeting and shoring, and after-hours, soil-boring, scaffolding and tent permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in Washington, DC", https://contractorrecords.com/washington-dc/plumbing-permits, data through September 2026, from the DC Department of Buildings building-permit records.

Link to a table: By month · Season · By ZIP code · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits by ZIP code · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Washington, DC issue a year?About 13,410 a year in Washington, DC: 26,820 permits issued October 2024 through September 2026, 13,850 of them in the last 12 months.
  • When do people in Washington, DC file the most plumbing permits?April (109 against an average month of 100); December is the quietest (91). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in Washington, DC?20002, with 3,597 of the 26,820 (13%); then 20011 (3,213).