Solar permits in Washington, DC

Data through September 2026 · updated 19 Oct 2026

7,204 solar permits were issued in Washington, DC, October 2024 through September 2026: about 3,602 a year and 8% of all permits. 3,080 solar permits in the last 12 months (Oct 2025–Sep 2026), 25% fewer than the 4,124 in the 12 months before. The busiest month is November. 20011 has the most, 1,238.

7,204permits issued
3,080last 12 months
Novbusiest month
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 461Oct2024Nov 2024: 346Dec 2024: 428Jan 2025: 221Jan2025Feb 2025: 182Mar 2025: 269Apr 2025: 236May 2025: 394Jun 2025: 427Jul 2025: 386JulAug 2025: 365Sep 2025: 409Oct 2025: 498Nov 2025: 775Dec 2025: 599Jan 2026: 352Jan2026Feb 2026: 204Mar 2026: 121Apr 2026: 96May 2026: 93Jun 2026: 102Jul 2026: 85JulAug 2026: 78Sep 2026: 77
The same numbers as a table
MonthPermits
Oct 2024461
Nov 2024346
Dec 2024428
Jan 2025221
Feb 2025182
Mar 2025269
Apr 2025236
May 2025394
Jun 2025427
Jul 2025386
Aug 2025365
Sep 2025409
Oct 2025498
Nov 2025775
Dec 2025599
Jan 2026352
Feb 2026204
Mar 2026121
Apr 202696
May 202693
Jun 2026102
Jul 202685
Aug 202678
Sep 202677

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). November is the busiest (187), April the quietest (55). A busy month at the permit counter usually means a longer wait for a contractor.

January: 95 (100 = an average month)February: 64 (100 = an average month)March: 65 (100 = an average month)April: 55 (100 = an average month)May: 81 (100 = an average month)June: 88 (100 = an average month)July: 78 (100 = an average month)August: 74 (100 = an average month)September: 81 (100 = an average month)October: 160 (100 = an average month)November: 187 (100 = an average month)187December: 171 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January95
February64
March65
April55
May81
June88
July78
August74
September81
October160
November187
December171

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the city's 7,204 solar permits.

ZIP codePermitsShare
200111,23817%
2001995813%
2000279211%
2002075610%
200173945%
200183745%
200123565%
200323465%
200103234%
200013194%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Solar System7,180100%
Alteration And Repair15under 1%
Addition Alteration Repair4under 1%
Miscellaneous3under 1%
Electrical2under 1%

Download this table (CSV)

Nearby permit data

Solar permits for other places in Washington, DC. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: DC Department of Buildings, Building Permits in 2009 to 2026 (DC GIS FEEDS/DCRA FeatureServer, Open Data DC), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Building, trade and post-card permits the DC Department of Buildings issues across the whole District of Columbia. Home occupation permits, elevator shop drawings, civil plans, variances and after-hours work permits are left out. Arlington, Alexandria and the Maryland suburbs run their own permit offices and are not in this file.

  • The District's permit file names no contractor (the applicant is usually the person who filed), so there are no contractor lists, rankings or firm pages for Washington.
  • The file has no declared job value, only the fees paid, so we show no costs.
  • The Department of Buildings seldom updates a permit's status once the work is done, and the file has no final dates, so we show no finished share and no time to final.
  • Electrical, plumbing and mechanical work is filed as separate supplemental or post-card permits, so one job can count several times.
  • Homes are permits on land zoned for houses, rowhouses and flats (the R and RF zones). Apartment, downtown and mixed-use zones count as other.
  • Home occupation permits, elevator shop drawings, civil plans, variances, sheeting and shoring, and after-hours, soil-boring, scaffolding and tent permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in Washington, DC", https://contractorrecords.com/washington-dc/solar-permits, data through September 2026, from the DC Department of Buildings building-permit records.

Link to a table: By month · Season · By ZIP code · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits by ZIP code · Solar permits by permit type.

Common questions

  • How many solar permits does Washington, DC issue a year?About 3,602 a year in Washington, DC: 7,204 permits issued October 2024 through September 2026, 3,080 of them in the last 12 months.
  • When do people in Washington, DC file the most solar permits?November (187 against an average month of 100); April is the quietest (55). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Washington, DC?20011, with 1,238 of the 7,204 (17%); then 20019 (958).