HVAC permits in Washington, DC

Data through September 2026 · updated 19 Oct 2026

9,905 HVAC permits were issued in Washington, DC, October 2024 through September 2026: about 4,952 a year and 11% of all permits. 5,047 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 4% more than the 4,858 in the 12 months before. The busiest month is July. 20002 has the most, 1,074.

9,905permits issued
5,047last 12 months
Julbusiest month
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 440Oct2024Nov 2024: 313Dec 2024: 324Jan 2025: 370Jan2025Feb 2025: 299Mar 2025: 352Apr 2025: 415May 2025: 460Jun 2025: 441Jul 2025: 526JulAug 2025: 457Sep 2025: 461Oct 2025: 370Nov 2025: 275Dec 2025: 389Jan 2026: 334Jan2026Feb 2026: 348Mar 2026: 436Apr 2026: 422May 2026: 405Jun 2026: 472Jul 2026: 582JulAug 2026: 490Sep 2026: 524
The same numbers as a table
MonthPermits
Oct 2024440
Nov 2024313
Dec 2024324
Jan 2025370
Feb 2025299
Mar 2025352
Apr 2025415
May 2025460
Jun 2025441
Jul 2025526
Aug 2025457
Sep 2025461
Oct 2025370
Nov 2025275
Dec 2025389
Jan 2026334
Feb 2026348
Mar 2026436
Apr 2026422
May 2026405
Jun 2026472
Jul 2026582
Aug 2026490
Sep 2026524

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (134), November the quietest (71). A busy month at the permit counter usually means a longer wait for a contractor.

January: 85 (100 = an average month)February: 78 (100 = an average month)March: 95 (100 = an average month)April: 101 (100 = an average month)May: 105 (100 = an average month)June: 111 (100 = an average month)July: 134 (100 = an average month)134August: 115 (100 = an average month)September: 119 (100 = an average month)October: 98 (100 = an average month)November: 71 (100 = an average month)December: 86 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January85
February78
March95
April101
May105
June111
July134
August115
September119
October98
November71
December86

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 9,905 HVAC permits.

ZIP codePermitsShare
200021,07411%
200118699%
200017688%
200077057%
200166847%
200206537%
200036256%
200096076%
200195796%
200084344%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Mechanical8,87290%
Alteration And Repair7618%
Boiler1682%
Addition Alteration Repair73under 1%
Miscellaneous31under 1%

Download this table (CSV)

Nearby permit data

HVAC permits for other places in Washington, DC. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: DC Department of Buildings, Building Permits in 2009 to 2026 (DC GIS FEEDS/DCRA FeatureServer, Open Data DC), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Building, trade and post-card permits the DC Department of Buildings issues across the whole District of Columbia. Home occupation permits, elevator shop drawings, civil plans, variances and after-hours work permits are left out. Arlington, Alexandria and the Maryland suburbs run their own permit offices and are not in this file.

  • The District's permit file names no contractor (the applicant is usually the person who filed), so there are no contractor lists, rankings or firm pages for Washington.
  • The file has no declared job value, only the fees paid, so we show no costs.
  • The Department of Buildings seldom updates a permit's status once the work is done, and the file has no final dates, so we show no finished share and no time to final.
  • Electrical, plumbing and mechanical work is filed as separate supplemental or post-card permits, so one job can count several times.
  • Homes are permits on land zoned for houses, rowhouses and flats (the R and RF zones). Apartment, downtown and mixed-use zones count as other.
  • Home occupation permits, elevator shop drawings, civil plans, variances, sheeting and shoring, and after-hours, soil-boring, scaffolding and tent permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in Washington, DC", https://contractorrecords.com/washington-dc/hvac-permits, data through September 2026, from the DC Department of Buildings building-permit records.

Link to a table: By month · Season · By ZIP code · Permit types.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits by ZIP code · HVAC permits by permit type.

Common questions

  • How many HVAC permits does Washington, DC issue a year?About 4,952 a year in Washington, DC: 9,905 permits issued October 2024 through September 2026, 5,047 of them in the last 12 months.
  • When do people in Washington, DC file the most HVAC permits?July (134 against an average month of 100); November is the quietest (71). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Washington, DC?20002, with 1,074 of the 9,905 (11%); then 20011 (869).