Data through September 2026 · updated 19 Oct 2026
9,905 HVAC permits were issued in Washington, DC, October 2024 through September 2026: about 4,952 a year and 11% of all permits. 5,047 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 4% more than the 4,858 in the 12 months before. The busiest month is July. 20002 has the most, 1,074.
Permits issued each month, October 2024 through September 2026.
| Month | Permits |
|---|---|
| Oct 2024 | 440 |
| Nov 2024 | 313 |
| Dec 2024 | 324 |
| Jan 2025 | 370 |
| Feb 2025 | 299 |
| Mar 2025 | 352 |
| Apr 2025 | 415 |
| May 2025 | 460 |
| Jun 2025 | 441 |
| Jul 2025 | 526 |
| Aug 2025 | 457 |
| Sep 2025 | 461 |
| Oct 2025 | 370 |
| Nov 2025 | 275 |
| Dec 2025 | 389 |
| Jan 2026 | 334 |
| Feb 2026 | 348 |
| Mar 2026 | 436 |
| Apr 2026 | 422 |
| May 2026 | 405 |
| Jun 2026 | 472 |
| Jul 2026 | 582 |
| Aug 2026 | 490 |
| Sep 2026 | 524 |
By calendar month, 100 = an average month (the thin line). July is the busiest (134), November the quietest (71). A busy month at the permit counter usually means a longer wait for a contractor.
| Month | Index |
|---|---|
| January | 85 |
| February | 78 |
| March | 95 |
| April | 101 |
| May | 105 |
| June | 111 |
| July | 134 |
| August | 115 |
| September | 119 |
| October | 98 |
| November | 71 |
| December | 86 |
Counted at the property's ZIP code. Share is the part of the city's 9,905 HVAC permits.
How the city filed these permits. We group its types into kinds of work; this is the split.
| Permit type | Permits | Share |
|---|---|---|
| Mechanical | 8,872 | 90% |
| Alteration And Repair | 761 | 8% |
| Boiler | 168 | 2% |
| Addition Alteration Repair | 73 | under 1% |
| Miscellaneous | 31 | under 1% |
Plumbing (26,820)Electrical (25,131)Remodels & repairs (9,349)Solar (7,204)Roofing (1,826)Fences & walls (1,262)Demolition (814)Additions (629)Garages, sheds & shade structures (520)
HVAC permits for other places in Washington, DC. Each permit office keeps its own file, so the numbers are not added together.
Arlington, VAFairfax County, VAMontgomery County, MDRockville, MDPrince George's County, MDHoward County, MD
Source: DC Department of Buildings, Building Permits in 2009 to 2026 (DC GIS FEEDS/DCRA FeatureServer, Open Data DC), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.
Building, trade and post-card permits the DC Department of Buildings issues across the whole District of Columbia. Home occupation permits, elevator shop drawings, civil plans, variances and after-hours work permits are left out. Arlington, Alexandria and the Maryland suburbs run their own permit offices and are not in this file.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "HVAC permits in Washington, DC", https://contractorrecords.com/washington-dc/hvac-permits, data through September 2026, from the DC Department of Buildings building-permit records.Link to a table: By month · Season · By ZIP code · Permit types.
Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits by ZIP code · HVAC permits by permit type.