Contractor Records
Home › Washington, DC › Remodels & repairs

Remodel and repair permits in Washington, DC

Data through September 2026 · updated 19 Oct 2026

9,349 remodel and repair permits were issued in Washington, DC, October 2024 through September 2026: about 4,674 a year and 10% of all permits. 4,895 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 10% more than the 4,454 in the 12 months before. The busiest month is July. 20011 has the most, 1,411.

9,349permits issued
4,895last 12 months
Julbusiest month
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 439Oct2024Nov 2024: 349Dec 2024: 319Jan 2025: 309Jan2025Feb 2025: 324Mar 2025: 386Apr 2025: 395May 2025: 387Jun 2025: 359Jul 2025: 404JulAug 2025: 422Sep 2025: 361Oct 2025: 407Nov 2025: 284Dec 2025: 309Jan 2026: 292Jan2026Feb 2026: 272Mar 2026: 400Apr 2026: 489May 2026: 498Jun 2026: 509Jul 2026: 496JulAug 2026: 441Sep 2026: 498
The same numbers as a table
MonthPermits
Oct 2024439
Nov 2024349
Dec 2024319
Jan 2025309
Feb 2025324
Mar 2025386
Apr 2025395
May 2025387
Jun 2025359
Jul 2025404
Aug 2025422
Sep 2025361
Oct 2025407
Nov 2025284
Dec 2025309
Jan 2026292
Feb 2026272
Mar 2026400
Apr 2026489
May 2026498
Jun 2026509
Jul 2026496
Aug 2026441
Sep 2026498

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (116), January the quietest (77). A busy month at the permit counter usually means a longer wait for a contractor.

January: 77 (100 = an average month)February: 77 (100 = an average month)March: 101 (100 = an average month)April: 113 (100 = an average month)May: 114 (100 = an average month)June: 111 (100 = an average month)July: 116 (100 = an average month)116August: 111 (100 = an average month)September: 110 (100 = an average month)October: 109 (100 = an average month)November: 81 (100 = an average month)December: 81 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January77
February77
March101
April113
May114
June111
July116
August111
September110
October109
November81
December81

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 9,349 remodel and repair permits.

ZIP codePermitsShare
200111,41115%
200021,33614%
200197868%
200166167%
200205606%
200075596%
200035516%
200015296%
200174615%
200104355%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Alteration And Repair5,13255%
Building3,96342%
Addition Alteration Repair1982%
Special Building56under 1%

Download this table (CSV)

Nearby permit data

Remodel and repair permits for other places in Washington, DC. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: DC Department of Buildings, Building Permits in 2009 to 2026 (DC GIS FEEDS/DCRA FeatureServer, Open Data DC), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Building, trade and post-card permits the DC Department of Buildings issues across the whole District of Columbia. Home occupation permits, elevator shop drawings, civil plans, variances and after-hours work permits are left out. Arlington, Alexandria and the Maryland suburbs run their own permit offices and are not in this file.

  • The District's permit file names no contractor (the applicant is usually the person who filed), so there are no contractor lists, rankings or firm pages for Washington.
  • The file has no declared job value, only the fees paid, so we show no costs.
  • The Department of Buildings seldom updates a permit's status once the work is done, and the file has no final dates, so we show no finished share and no time to final.
  • Electrical, plumbing and mechanical work is filed as separate supplemental or post-card permits, so one job can count several times.
  • Homes are permits on land zoned for houses, rowhouses and flats (the R and RF zones). Apartment, downtown and mixed-use zones count as other.
  • Home occupation permits, elevator shop drawings, civil plans, variances, sheeting and shoring, and after-hours, soil-boring, scaffolding and tent permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Washington, DC", https://contractorrecords.com/washington-dc/remodel-permits, data through September 2026, from the DC Department of Buildings building-permit records.

Link to a table: By month · Season · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Washington, DC issue a year?About 4,674 a year in Washington, DC: 9,349 permits issued October 2024 through September 2026, 4,895 of them in the last 12 months.
  • When do people in Washington, DC file the most remodel and repair permits?July (116 against an average month of 100); January is the quietest (77). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Washington, DC?20011, with 1,411 of the 9,349 (15%); then 20002 (1,336).