Contractor Records
Home › Washington, DC › ZIP 20018

Building permits in 20018, Washington, DC

Data through September 2026 · updated 19 Oct 2026

3,203 building permits were issued in ZIP code 20018 by the DC Department of Buildings, October 2024 through September 2026: 3% of the 92,275 in Washington, DC, the 13th busiest ZIP code. Electrical permits lead with 926. 1,601 permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 1,602 in the 12 months before. Permits from a city that runs its own permit office are not counted.

3,203permits in 20018
1,601last 12 months
75%for homes
Sep 2026records through

Permits in 20018 by kind of work

Share here is the part of the 3,203 permits in 20018; citywide is the same for all of Washington, DC.

Kind of workPermitsShare hereCitywide
Electrical92629%27%
Plumbing72323%29%
Remodels & repairs40313%10%
Solar37412%8%
HVAC31810%11%
Fences & walls632%1%
Roofing512%2%
Additions28under 1%under 1%
Garages, sheds & shade structures27under 1%under 1%
Demolition26under 1%under 1%
New homes3under 1%under 1%
ADUs & casitas2under 1%under 1%
Pools & spas2under 1%under 1%
Other2578%9%

Download this table (CSV)

Permits in 20018 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)34361,744
2025121,6321,632
2026 (through September)91,1351,513

Download this table (CSV)

How these numbers are made

Source: DC Department of Buildings, Building Permits in 2009 to 2026 (DC GIS FEEDS/DCRA FeatureServer, Open Data DC), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Building, trade and post-card permits the DC Department of Buildings issues across the whole District of Columbia. Home occupation permits, elevator shop drawings, civil plans, variances and after-hours work permits are left out. Arlington, Alexandria and the Maryland suburbs run their own permit offices and are not in this file.

  • The District's permit file names no contractor (the applicant is usually the person who filed), so there are no contractor lists, rankings or firm pages for Washington.
  • The file has no declared job value, only the fees paid, so we show no costs.
  • The Department of Buildings seldom updates a permit's status once the work is done, and the file has no final dates, so we show no finished share and no time to final.
  • Electrical, plumbing and mechanical work is filed as separate supplemental or post-card permits, so one job can count several times.
  • Homes are permits on land zoned for houses, rowhouses and flats (the R and RF zones). Apartment, downtown and mixed-use zones count as other.
  • Home occupation permits, elevator shop drawings, civil plans, variances, sheeting and shoring, and after-hours, soil-boring, scaffolding and tent permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 20018, Washington, DC", https://contractorrecords.com/washington-dc/zip/20018, data through September 2026, from the DC Department of Buildings building-permit records.

Link to a table: By kind of work · By year.

Download the tables (CSV): Permits in 20018 by kind of work · Permits in 20018 by year.

Common questions

  • How many building permits were issued in 20018?3,203 permits issued by the city in ZIP code 20018, October 2024 through September 2026: 926 electrical, 723 plumbing, 403 remodels & repairs. 1,601 were in the last 12 months.
  • What is built most in 20018?Electrical: 926 of the 3,203 permits (29%), against 27% citywide.
  • Who did the work in 20018?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.