Garage, shed and shade structure permits in the City of Arlington, TX

Data through September 2026 · updated 19 Oct 2026

371 garage, shed and shade structure permits were issued in the City of Arlington, October 2024 through September 2026: about 186 a year and 4% of all permits. 188 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 3% more than the 183 in the 12 months before. The busiest month is July. The usual one took 41 days from issue to the city's final.

What this file covers: The city's public file holds building, fence, pool and sign permits only; electrical, plumbing, mechanical and roofing permits are not in it.

371permits issued
188last 12 months
Julbusiest month
41days, usual issue to final
75%finished
$10,000usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 17Oct2024Nov 2024: 10Dec 2024: 15Jan 2025: 10Jan2025Feb 2025: 14Mar 2025: 14Apr 2025: 18May 2025: 15Jun 2025: 10Jul 2025: 20JulAug 2025: 23Sep 2025: 17Oct 2025: 17Nov 2025: 9Dec 2025: 12Jan 2026: 12Jan2026Feb 2026: 18Mar 2026: 15Apr 2026: 17May 2026: 15Jun 2026: 18Jul 2026: 23JulAug 2026: 18Sep 2026: 14
The same numbers as a table
MonthPermits
Oct 202417
Nov 202410
Dec 202415
Jan 202510
Feb 202514
Mar 202514
Apr 202518
May 202515
Jun 202510
Jul 202520
Aug 202523
Sep 202517
Oct 202517
Nov 20259
Dec 202512
Jan 202612
Feb 202618
Mar 202615
Apr 202617
May 202615
Jun 202618
Jul 202623
Aug 202618
Sep 202614

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (139), November the quietest (61). A busy month at the permit counter usually means a longer wait for a contractor.

January: 71 (100 = an average month)February: 104 (100 = an average month)March: 94 (100 = an average month)April: 113 (100 = an average month)May: 97 (100 = an average month)June: 91 (100 = an average month)July: 139 (100 = an average month)139August: 133 (100 = an average month)September: 100 (100 = an average month)October: 110 (100 = an average month)November: 61 (100 = an average month)December: 87 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January71
February104
March94
April113
May97
June91
July139
August133
September100
October110
November61
December87

Download this table (CSV)

How long a garage, shed and shade structure permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 138 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025183
Finished75.4%
Expired24.6%
Usual days, issue to final41
Middle half, days16–82

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 368 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$10,000
Middle half$6,000–$25,000

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Patio Cover/Gazebo: New Construction18349%
Portable Storage/Accy Building (320 sq ft and under): New Construction12734%
Permanent Storage/Accy Building (over 320 sq ft): New Construction195%
Detached Garage: New Construction185%
Carport: New Construction103%
Decks: New Construction72%
Detached Garage: Remodel/Alterations/Repairs2under 1%
Permanent Storage/Accy Building (over 320 sq ft): Remodel/Alterations/Repairs2under 1%
Permanent Storage/Accy Building (over 320 sq ft): Addition1under 1%
Detached Garage: Addition1under 1%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Dallas–Fort Worth. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Arlington GIS, OpenData/OD_Property: Issued Permits (3-year view), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, fence, pool and sign permits the City of Arlington, Texas issues inside city limits. Not to be confused with Arlington, Virginia, which has its own pages on this site. Electrical, plumbing, mechanical and roofing permits are not in the city's public file, and neither are certificates of occupancy.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Arlington.
  • The city publishes only building, fence, pool and sign permits. Electrical, plumbing, HVAC and roofing permits are not in the file, so those kinds of work do not appear here.
  • The city keeps a rolling three-year view: older permits drop out of the file, so there is no history before late 2023.
  • The value is the construction valuation declared on the permit; sign permits carry none.
  • The file has no ZIP code, so there are no ZIP code pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in the City of Arlington, TX", https://contractorrecords.com/arlington-tx/accessory-permits, data through September 2026, from the City of Arlington Planning and Development Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: days to final · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Arlington issue a year?About 186 a year in the City of Arlington: 371 permits issued October 2024 through September 2026, 188 of them in the last 12 months.
  • How long does a garage, shed and shade structure permit take in Arlington?The usual one took 41 days from issue to the city's final inspection, and the middle half took 16 to 82 days (138 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Arlington file the most garage, shed and shade structure permits?July (139 against an average month of 100); November is the quietest (61). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.