Contractor Records
Home › Arlington › Fences & walls

Fence and wall permits in the City of Arlington, TX

Data through September 2026 · updated 19 Oct 2026

1,264 fence and wall permits were issued in the City of Arlington, October 2024 through September 2026: about 632 a year and 14% of all permits. 624 fence and wall permits in the last 12 months (Oct 2025–Sep 2026), 2% fewer than the 640 in the 12 months before. The busiest month is October. The usual one took 11 days from issue to the city's final.

What this file covers: The city's public file holds building, fence, pool and sign permits only; electrical, plumbing, mechanical and roofing permits are not in it.

1,264permits issued
624last 12 months
Octbusiest month
11days, usual issue to final
65%finished
$3,380usual declared value
Sep 2026records through

Fence and wall permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 89Oct2024Nov 2024: 36Dec 2024: 38Jan 2025: 47Jan2025Feb 2025: 46Mar 2025: 43Apr 2025: 61May 2025: 76Jun 2025: 52Jul 2025: 47JulAug 2025: 55Sep 2025: 50Oct 2025: 53Nov 2025: 55Dec 2025: 43Jan 2026: 34Jan2026Feb 2026: 59Mar 2026: 66Apr 2026: 53May 2026: 52Jun 2026: 56Jul 2026: 59JulAug 2026: 49Sep 2026: 45
The same numbers as a table
MonthPermits
Oct 202489
Nov 202436
Dec 202438
Jan 202547
Feb 202546
Mar 202543
Apr 202561
May 202576
Jun 202552
Jul 202547
Aug 202555
Sep 202550
Oct 202553
Nov 202555
Dec 202543
Jan 202634
Feb 202659
Mar 202666
Apr 202653
May 202652
Jun 202656
Jul 202659
Aug 202649
Sep 202645

Download this table (CSV)

When fence and wall permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (135), January the quietest (77). A busy month at the permit counter usually means a longer wait for a contractor.

January: 77 (100 = an average month)February: 100 (100 = an average month)March: 103 (100 = an average month)April: 108 (100 = an average month)May: 122 (100 = an average month)June: 103 (100 = an average month)July: 101 (100 = an average month)August: 99 (100 = an average month)September: 90 (100 = an average month)October: 135 (100 = an average month)135November: 86 (100 = an average month)December: 77 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January77
February100
March103
April108
May122
June103
July101
August99
September90
October135
November86
December77

Download this table (CSV)

How long a fence and wall permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 414 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025640
Finished64.8%
Expired35.0%
Usual days, issue to final11
Middle half, days4–28

Download this table (CSV)

What a fence and wall permit is declared at

The value written on the permit at application, from 1,263 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$3,380
Middle half$1,500–$7,956

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Privacy: New61048%
Residential Privacy: Repair / Replacement30624%
Retaining Wall: New Construction1048%
Commercial Privacy: New514%
Commercial Screening: New433%
Residential Pool Barrier: Repair / Replacement423%
Perimeter Screening Fence: New252%
Residential Pool Barrier: New202%
Pub/Semi-pub Pool Barrier: New161%
Commercial Privacy: Repair / Replacement151%

Download this table (CSV)

Nearby permit data

Fence and wall permits for other places in Dallas–Fort Worth. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Arlington GIS, OpenData/OD_Property: Issued Permits (3-year view), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, fence, pool and sign permits the City of Arlington, Texas issues inside city limits. Not to be confused with Arlington, Virginia, which has its own pages on this site. Electrical, plumbing, mechanical and roofing permits are not in the city's public file, and neither are certificates of occupancy.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Arlington.
  • The city publishes only building, fence, pool and sign permits. Electrical, plumbing, HVAC and roofing permits are not in the file, so those kinds of work do not appear here.
  • The city keeps a rolling three-year view: older permits drop out of the file, so there is no history before late 2023.
  • The value is the construction valuation declared on the permit; sign permits carry none.
  • The file has no ZIP code, so there are no ZIP code pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Fence and wall permits in the City of Arlington, TX", https://contractorrecords.com/arlington-tx/fence-permits, data through September 2026, from the City of Arlington Planning and Development Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Fences & walls permits by month · Fences & walls permits by calendar month (index) · Fences & walls permits: days to final · Fences & walls permits: declared value · Fences & walls permits by permit type.

Common questions

  • How many fence and wall permits does Arlington issue a year?About 632 a year in the City of Arlington: 1,264 permits issued October 2024 through September 2026, 624 of them in the last 12 months.
  • How long does a fence and wall permit take in Arlington?The usual one took 11 days from issue to the city's final inspection, and the middle half took 4 to 28 days (414 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Arlington file the most fence and wall permits?October (135 against an average month of 100); January is the quietest (77). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.