Electrical permits in Columbia, MO

Data through September 2026 · updated 19 Oct 2026

1,016 electrical permits were issued in Columbia, October 2024 through September 2026: about 508 a year and 16% of all permits. 516 electrical permits in the last 12 months (Oct 2025–Sep 2026), 3% more than the 500 in the 12 months before. The busiest month is March. 65203 has the most, 431.

1,016permits issued
516last 12 months
Marbusiest month
32%finished
$8,500usual declared value
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 35Oct2024Nov 2024: 32Dec 2024: 29Jan 2025: 35Jan2025Feb 2025: 30Mar 2025: 62Apr 2025: 56May 2025: 32Jun 2025: 47Jul 2025: 68JulAug 2025: 42Sep 2025: 32Oct 2025: 41Nov 2025: 33Dec 2025: 19Jan 2026: 32Jan2026Feb 2026: 44Mar 2026: 64Apr 2026: 47May 2026: 35Jun 2026: 49Jul 2026: 58JulAug 2026: 51Sep 2026: 43
The same numbers as a table
MonthPermits
Oct 202435
Nov 202432
Dec 202429
Jan 202535
Feb 202530
Mar 202562
Apr 202556
May 202532
Jun 202547
Jul 202568
Aug 202542
Sep 202532
Oct 202541
Nov 202533
Dec 202519
Jan 202632
Feb 202644
Mar 202664
Apr 202647
May 202635
Jun 202649
Jul 202658
Aug 202651
Sep 202643

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (149), December the quietest (57). A busy month at the permit counter usually means a longer wait for a contractor.

January: 79 (100 = an average month)February: 87 (100 = an average month)March: 149 (100 = an average month)149April: 122 (100 = an average month)May: 79 (100 = an average month)June: 113 (100 = an average month)July: 149 (100 = an average month)August: 110 (100 = an average month)September: 89 (100 = an average month)October: 90 (100 = an average month)November: 77 (100 = an average month)December: 57 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January79
February87
March149
April122
May79
June113
July149
August110
September89
October90
November77
December57

Download this table (CSV)

How many electrical permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025500
Finished32.4%
Expired60.4%

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 632 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$8,500
Middle half$2,000–$162,500

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 1,016 electrical permits.

ZIP codePermitsShare
6520343142%
6520133433%
6520225025%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical: Electrical Stand Alone70669%
Electrical: Electrical Sub Permit30930%
Generator (Residential): BSD-Generator (Residential)1under 1%

Download this table (CSV)

How Columbia compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Columbia GIS, Building Permit Application Status (ArcGIS layer behind the city's Development Permits Viewer), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Columbia issues inside city limits for homes and other non-commercial work: new houses, duplexes and townhouses, home alterations and additions, re-roofs, heating and cooling, electrical, plumbing and gas, residential solar, decks and foundation repair. Commercial building permits, right-of-way and utility permits, fire systems, signs and grading in the same file are not counted, and neither is unincorporated Boone County, which issues its own permits.

  • The city's file names no contractor on permits issued since its 2018 system change, so there are no contractor lists, rankings or firm pages for Columbia.
  • The city doesn't split trade and re-roof permits into homes and businesses; we count one as a home permit when the lot is zoned for one- or two-family homes or manufactured homes, or the permit's description names a house.
  • A new house gets separate electrical, mechanical and plumbing sub-permits, so one project can count several times, once under each kind of work.
  • The value is the valuation on the permit; many trade permits carry none.
  • A final date is the city's finaled date. Trade sub-permits under a building permit add no days, because the file dates most of them on the day they closed; permits that expired carry no final date even where the file shows one.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Columbia, MO", https://contractorrecords.com/columbia-mo/electrical-permits, data through September 2026, from the City of Columbia Community Development Department building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: finished share · Electrical permits: declared value · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Columbia issue a year?About 508 a year in Columbia: 1,016 permits issued October 2024 through September 2026, 516 of them in the last 12 months.
  • When do people in Columbia file the most electrical permits?March (149 against an average month of 100); December is the quietest (57). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Columbia?65203, with 431 of the 1,016 (42%); then 65201 (334).