743 new home permits were issued in Columbia, October 2024 through September 2026: about 372 a year and 12% of all permits. 364 new home permits in the last 12 months (Oct 2025–Sep 2026), 4% fewer than the 379 in the 12 months before. The busiest month is March. The usual one took 260 days from issue to the city's final. 65202 has the most, 268.

743permits issued
364last 12 months
Marbusiest month
260days, usual issue to final
87%finished
$339,003usual declared value
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 48Oct2024Nov 2024: 28Dec 2024: 35Jan 2025: 32Jan2025Feb 2025: 29Mar 2025: 46Apr 2025: 25May 2025: 24Jun 2025: 34Jul 2025: 25JulAug 2025: 17Sep 2025: 36Oct 2025: 34Nov 2025: 17Dec 2025: 23Jan 2026: 10Jan2026Feb 2026: 36Mar 2026: 39Apr 2026: 23May 2026: 38Jun 2026: 36Jul 2026: 35JulAug 2026: 50Sep 2026: 23
The same numbers as a table
MonthPermits
Oct 202448
Nov 202428
Dec 202435
Jan 202532
Feb 202529
Mar 202546
Apr 202525
May 202524
Jun 202534
Jul 202525
Aug 202517
Sep 202536
Oct 202534
Nov 202517
Dec 202523
Jan 202610
Feb 202636
Mar 202639
Apr 202623
May 202638
Jun 202636
Jul 202635
Aug 202650
Sep 202623

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (137), January the quietest (68). A busy month at the permit counter usually means a longer wait for a contractor.

January: 68 (100 = an average month)February: 105 (100 = an average month)March: 137 (100 = an average month)137April: 78 (100 = an average month)May: 100 (100 = an average month)June: 113 (100 = an average month)July: 97 (100 = an average month)August: 108 (100 = an average month)September: 95 (100 = an average month)October: 132 (100 = an average month)November: 73 (100 = an average month)December: 94 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January68
February105
March137
April78
May100
June113
July97
August108
September95
October132
November73
December94

Download this table (CSV)

How long a new home permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 331 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025379
Finished87.3%
Expired8.2%
Usual days, issue to final260
Middle half, days212–343

Download this table (CSV)

What a new home permit is declared at

The value written on the permit at application, from 743 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$339,003
Middle half$270,181–$500,032

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the city's 743 new home permits.

ZIP codePermitsShare
6520226836%
6520126536%
6520321028%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building (Residential New): Single Family Detached62484%
Building (Residential New): Duplex608%
Building (Residential New): Townhouse588%
Building (Residential New): SFD (Waived Fees)1under 1%

Download this table (CSV)

How Columbia compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Columbia GIS, Building Permit Application Status (ArcGIS layer behind the city's Development Permits Viewer), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Columbia issues inside city limits for homes and other non-commercial work: new houses, duplexes and townhouses, home alterations and additions, re-roofs, heating and cooling, electrical, plumbing and gas, residential solar, decks and foundation repair. Commercial building permits, right-of-way and utility permits, fire systems, signs and grading in the same file are not counted, and neither is unincorporated Boone County, which issues its own permits.

  • The city's file names no contractor on permits issued since its 2018 system change, so there are no contractor lists, rankings or firm pages for Columbia.
  • The city doesn't split trade and re-roof permits into homes and businesses; we count one as a home permit when the lot is zoned for one- or two-family homes or manufactured homes, or the permit's description names a house.
  • A new house gets separate electrical, mechanical and plumbing sub-permits, so one project can count several times, once under each kind of work.
  • The value is the valuation on the permit; many trade permits carry none.
  • A final date is the city's finaled date. Trade sub-permits under a building permit add no days, because the file dates most of them on the day they closed; permits that expired carry no final date even where the file shows one.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in Columbia, MO", https://contractorrecords.com/columbia-mo/new-home-permits, data through September 2026, from the City of Columbia Community Development Department building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: days to final · New homes permits: declared value · New homes permits by ZIP code · New homes permits by permit type.

Common questions

  • How many new home permits does Columbia issue a year?About 372 a year in Columbia: 743 permits issued October 2024 through September 2026, 364 of them in the last 12 months.
  • How long does a new home permit take in Columbia?The usual one took 260 days from issue to the city's final inspection, and the middle half took 212 to 343 days (331 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Columbia file the most new home permits?March (137 against an average month of 100); January is the quietest (68). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Columbia?65202, with 268 of the 743 (36%); then 65201 (265).