Contractor Records
Home › Dallas › Demolition

Demolition permits in the City of Dallas, TX

Data through September 2026 · updated 26 Oct 2026

2,643 demolition permits were issued in the City of Dallas, October 2024 through September 2026: about 1,322 a year and 2% of all permits. 1,396 demolition permits in the last 12 months (Oct 2025–Sep 2026), 12% more than the 1,247 in the 12 months before. The busiest month is July. 75214 has the most, 198.

2,643permits issued
1,396last 12 months
Julbusiest month
Sep 2026records through

Demolition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 92Oct2024Nov 2024: 101Dec 2024: 95Jan 2025: 92Jan2025Feb 2025: 86Mar 2025: 104Apr 2025: 91May 2025: 81Jun 2025: 112Jul 2025: 158JulAug 2025: 114Sep 2025: 121Oct 2025: 102Nov 2025: 113Dec 2025: 114Jan 2026: 79Jan2026Feb 2026: 107Mar 2026: 123Apr 2026: 106May 2026: 115Jun 2026: 122Jul 2026: 157JulAug 2026: 133Sep 2026: 125
The same numbers as a table
MonthPermits
Oct 202492
Nov 2024101
Dec 202495
Jan 202592
Feb 202586
Mar 2025104
Apr 202591
May 202581
Jun 2025112
Jul 2025158
Aug 2025114
Sep 2025121
Oct 2025102
Nov 2025113
Dec 2025114
Jan 202679
Feb 2026107
Mar 2026123
Apr 2026106
May 2026115
Jun 2026122
Jul 2026157
Aug 2026133
Sep 2026125

Download this table (CSV)

When demolition permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (143), January the quietest (78). A busy month at the permit counter usually means a longer wait for a contractor.

January: 78 (100 = an average month)February: 88 (100 = an average month)March: 103 (100 = an average month)April: 89 (100 = an average month)May: 89 (100 = an average month)June: 106 (100 = an average month)July: 143 (100 = an average month)143August: 112 (100 = an average month)September: 112 (100 = an average month)October: 88 (100 = an average month)November: 97 (100 = an average month)December: 95 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January78
February88
March103
April89
May89
June106
July143
August112
September112
October88
November97
December95

Download this table (CSV)

ZIP codes with the most demolition permits

Counted at the property's ZIP code. Share is the part of the city's 2,643 demolition permits.

ZIP codePermitsShare
752141987%
752291827%
752201476%
752091315%
752301184%
752181184%
75206843%
75216823%
75208783%
75212773%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Demolition Permit2,29487%
Commercial Demolition Permit34913%

Download this table (CSV)

Nearby permit data

Demolition permits for other places in Dallas–Fort Worth. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Dallas OpenData, Building Permits (Socrata e7gq-4sah, January 2018 to present, updated daily), read 26 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's open permit file has no permit status and no final inspection date, so no finished share is shown.

Building and trade permits the City of Dallas issued inside the city limits: building, plumbing, electrical, mechanical, roofing, solar, pool, accessory-structure, foundation-repair and demolition permits. Suburbs such as Irving, Garland, Mesquite, Richardson and Plano, and unincorporated Dallas County, run their own permit offices and are not in this file. Drive approach and sidewalk permits are left out.

  • The city's file gives a contractor name on only about four permits in ten, so there are no contractor lists, rankings or firm pages for Dallas.
  • The file has no status and no final inspection date, so we can't show which permits were finished or how long they took.
  • The city moved its permits to a new record system in May 2025, and fewer permits were issued that month (about 3,600, against about 5,000 in a usual month). Plumbing, electrical and mechanical permits make up a larger share after the move.
  • The city's file carried a declared job value until April 2025 and almost never after, so we show no job values for Dallas.
  • Homes means permits the city filed as residential; commercial and apartment permits, and the city's phased commercial building permits, count as other.
  • Roofing, solar, pool and demolition permits have their own permit types. Fences and walls come from residential accessory-structure permits, and additions, roofing and solar work filed as residential alteration permits are picked out by their descriptions.
  • Records the city marked as duplicates of permits approved in its old system are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Demolition permits in the City of Dallas, TX", https://contractorrecords.com/dallas/demolition-permits, data through September 2026, from City of Dallas Development Services building-permit records.

Link to a table: By month · Season · By ZIP code · Permit types.

Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits by ZIP code · Demolition permits by permit type.

Common questions

  • How many demolition permits does Dallas issue a year?About 1,322 a year in the City of Dallas: 2,643 permits issued October 2024 through September 2026, 1,396 of them in the last 12 months.
  • When do people in Dallas file the most demolition permits?July (143 against an average month of 100); January is the quietest (78). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most demolition permits in Dallas?75214, with 198 of the 2,643 (7%); then 75229 (182).