Data through September 2026 · updated 26 Oct 2026

2,713 fence and wall permits were issued in the City of Dallas, October 2024 through September 2026: about 1,356 a year and 2% of all permits. 1,512 fence and wall permits in the last 12 months (Oct 2025–Sep 2026), 26% more than the 1,201 in the 12 months before. The busiest month is July. 75229 has the most, 224.

2,713permits issued
1,512last 12 months
Julbusiest month
Sep 2026records through

Fence and wall permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 91Oct2024Nov 2024: 94Dec 2024: 76Jan 2025: 79Jan2025Feb 2025: 93Mar 2025: 110Apr 2025: 118May 2025: 86Jun 2025: 111Jul 2025: 134JulAug 2025: 99Sep 2025: 110Oct 2025: 100Nov 2025: 111Dec 2025: 104Jan 2026: 107Jan2026Feb 2026: 102Mar 2026: 168Apr 2026: 153May 2026: 104Jun 2026: 141Jul 2026: 165JulAug 2026: 128Sep 2026: 129
The same numbers as a table
MonthPermits
Oct 202491
Nov 202494
Dec 202476
Jan 202579
Feb 202593
Mar 2025110
Apr 2025118
May 202586
Jun 2025111
Jul 2025134
Aug 202599
Sep 2025110
Oct 2025100
Nov 2025111
Dec 2025104
Jan 2026107
Feb 2026102
Mar 2026168
Apr 2026153
May 2026104
Jun 2026141
Jul 2026165
Aug 2026128
Sep 2026129

Download this table (CSV)

When fence and wall permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (132), December the quietest (80). A busy month at the permit counter usually means a longer wait for a contractor.

January: 82 (100 = an average month)February: 86 (100 = an average month)March: 123 (100 = an average month)April: 120 (100 = an average month)May: 84 (100 = an average month)June: 111 (100 = an average month)July: 132 (100 = an average month)132August: 100 (100 = an average month)September: 106 (100 = an average month)October: 84 (100 = an average month)November: 91 (100 = an average month)December: 80 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January82
February86
March123
April120
May84
June111
July132
August100
September106
October84
November91
December80

Download this table (CSV)

ZIP codes with the most fence and wall permits

Counted at the property's ZIP code. Share is the part of the city's 2,713 fence and wall permits.

ZIP codePermitsShare
752292248%
752142027%
752201656%
752091516%
752301355%
752061084%
75218954%
75238913%
75212652%
75248562%

Download this table (CSV)

Nearby permit data

Fence and wall permits for other places in Dallas–Fort Worth. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Dallas OpenData, Building Permits (Socrata e7gq-4sah, January 2018 to present, updated daily), read 26 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's open permit file has no permit status and no final inspection date, so no finished share is shown.

Building and trade permits the City of Dallas issued inside the city limits: building, plumbing, electrical, mechanical, roofing, solar, pool, accessory-structure, foundation-repair and demolition permits. Suburbs such as Irving, Garland, Mesquite, Richardson and Plano, and unincorporated Dallas County, run their own permit offices and are not in this file. Drive approach and sidewalk permits are left out.

  • The city's file gives a contractor name on only about four permits in ten, so there are no contractor lists, rankings or firm pages for Dallas.
  • The file has no status and no final inspection date, so we can't show which permits were finished or how long they took.
  • The city moved its permits to a new record system in May 2025, and fewer permits were issued that month (about 3,600, against about 5,000 in a usual month). Plumbing, electrical and mechanical permits make up a larger share after the move.
  • The city's file carried a declared job value until April 2025 and almost never after, so we show no job values for Dallas.
  • Homes means permits the city filed as residential; commercial and apartment permits, and the city's phased commercial building permits, count as other.
  • Roofing, solar, pool and demolition permits have their own permit types. Fences and walls come from residential accessory-structure permits, and additions, roofing and solar work filed as residential alteration permits are picked out by their descriptions.
  • Records the city marked as duplicates of permits approved in its old system are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Fence and wall permits in the City of Dallas, TX", https://contractorrecords.com/dallas/fence-permits, data through September 2026, from City of Dallas Development Services building-permit records.

Link to a table: By month · Season · By ZIP code.

Download the tables (CSV): Fences & walls permits by month · Fences & walls permits by calendar month (index) · Fences & walls permits by ZIP code.

Common questions

  • How many fence and wall permits does Dallas issue a year?About 1,356 a year in the City of Dallas: 2,713 permits issued October 2024 through September 2026, 1,512 of them in the last 12 months.
  • When do people in Dallas file the most fence and wall permits?July (132 against an average month of 100); December is the quietest (80). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most fence and wall permits in Dallas?75229, with 224 of the 2,713 (8%); then 75214 (202).