Contractor Records
Home › Dallas › Solar

Solar permits in the City of Dallas, TX

Data through September 2026 · updated 26 Oct 2026

2,861 solar permits were issued in the City of Dallas, October 2024 through September 2026: about 1,430 a year and 2% of all permits. 1,304 solar permits in the last 12 months (Oct 2025–Sep 2026), 16% fewer than the 1,557 in the 12 months before. The busiest month is October. 75241 has the most, 181.

2,861permits issued
1,304last 12 months
Octbusiest month
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 200Oct2024Nov 2024: 138Dec 2024: 138Jan 2025: 126Jan2025Feb 2025: 145Mar 2025: 147Apr 2025: 103May 2025: 42Jun 2025: 95Jul 2025: 135JulAug 2025: 141Sep 2025: 147Oct 2025: 180Nov 2025: 133Dec 2025: 153Jan 2026: 112Jan2026Feb 2026: 86Mar 2026: 74Apr 2026: 85May 2026: 77Jun 2026: 97Jul 2026: 101JulAug 2026: 86Sep 2026: 120
The same numbers as a table
MonthPermits
Oct 2024200
Nov 2024138
Dec 2024138
Jan 2025126
Feb 2025145
Mar 2025147
Apr 2025103
May 202542
Jun 202595
Jul 2025135
Aug 2025141
Sep 2025147
Oct 2025180
Nov 2025133
Dec 2025153
Jan 2026112
Feb 202686
Mar 202674
Apr 202685
May 202677
Jun 202697
Jul 2026101
Aug 202686
Sep 2026120

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (159), May the quietest (50). A busy month at the permit counter usually means a longer wait for a contractor.

January: 100 (100 = an average month)February: 97 (100 = an average month)March: 93 (100 = an average month)April: 79 (100 = an average month)May: 50 (100 = an average month)June: 81 (100 = an average month)July: 99 (100 = an average month)August: 95 (100 = an average month)September: 112 (100 = an average month)October: 159 (100 = an average month)159November: 114 (100 = an average month)December: 122 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January100
February97
March93
April79
May50
June81
July99
August95
September112
October159
November114
December122

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the city's 2,861 solar permits.

ZIP codePermitsShare
752411816%
752271164%
752171134%
75232963%
75216873%
75229843%
75248843%
75228813%
75211803%
75253622%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Solar/PV Permit1,63557%
Residential Electrical Permit74426%
Residential Alteration Addition Permit38513%
Commercial Solar/PV Permit642%
Commercial Electrical Permit331%

Download this table (CSV)

Nearby permit data

Solar permits for other places in Dallas–Fort Worth. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Dallas OpenData, Building Permits (Socrata e7gq-4sah, January 2018 to present, updated daily), read 26 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's open permit file has no permit status and no final inspection date, so no finished share is shown.

Building and trade permits the City of Dallas issued inside the city limits: building, plumbing, electrical, mechanical, roofing, solar, pool, accessory-structure, foundation-repair and demolition permits. Suburbs such as Irving, Garland, Mesquite, Richardson and Plano, and unincorporated Dallas County, run their own permit offices and are not in this file. Drive approach and sidewalk permits are left out.

  • The city's file gives a contractor name on only about four permits in ten, so there are no contractor lists, rankings or firm pages for Dallas.
  • The file has no status and no final inspection date, so we can't show which permits were finished or how long they took.
  • The city moved its permits to a new record system in May 2025, and fewer permits were issued that month (about 3,600, against about 5,000 in a usual month). Plumbing, electrical and mechanical permits make up a larger share after the move.
  • The city's file carried a declared job value until April 2025 and almost never after, so we show no job values for Dallas.
  • Homes means permits the city filed as residential; commercial and apartment permits, and the city's phased commercial building permits, count as other.
  • Roofing, solar, pool and demolition permits have their own permit types. Fences and walls come from residential accessory-structure permits, and additions, roofing and solar work filed as residential alteration permits are picked out by their descriptions.
  • Records the city marked as duplicates of permits approved in its old system are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in the City of Dallas, TX", https://contractorrecords.com/dallas/solar-permits, data through September 2026, from City of Dallas Development Services building-permit records.

Link to a table: By month · Season · By ZIP code · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits by ZIP code · Solar permits by permit type.

Common questions

  • How many solar permits does Dallas issue a year?About 1,430 a year in the City of Dallas: 2,861 permits issued October 2024 through September 2026, 1,304 of them in the last 12 months.
  • When do people in Dallas file the most solar permits?October (159 against an average month of 100); May is the quietest (50). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Dallas?75241, with 181 of the 2,861 (6%); then 75227 (116).