Data through September 2026 · updated 26 Oct 2026
2,861 solar permits were issued in the City of Dallas, October 2024 through September 2026: about 1,430 a year and 2% of all permits. 1,304 solar permits in the last 12 months (Oct 2025–Sep 2026), 16% fewer than the 1,557 in the 12 months before. The busiest month is October. 75241 has the most, 181.
Permits issued each month, October 2024 through September 2026.
| Month | Permits |
|---|---|
| Oct 2024 | 200 |
| Nov 2024 | 138 |
| Dec 2024 | 138 |
| Jan 2025 | 126 |
| Feb 2025 | 145 |
| Mar 2025 | 147 |
| Apr 2025 | 103 |
| May 2025 | 42 |
| Jun 2025 | 95 |
| Jul 2025 | 135 |
| Aug 2025 | 141 |
| Sep 2025 | 147 |
| Oct 2025 | 180 |
| Nov 2025 | 133 |
| Dec 2025 | 153 |
| Jan 2026 | 112 |
| Feb 2026 | 86 |
| Mar 2026 | 74 |
| Apr 2026 | 85 |
| May 2026 | 77 |
| Jun 2026 | 97 |
| Jul 2026 | 101 |
| Aug 2026 | 86 |
| Sep 2026 | 120 |
By calendar month, 100 = an average month (the thin line). October is the busiest (159), May the quietest (50). A busy month at the permit counter usually means a longer wait for a contractor.
| Month | Index |
|---|---|
| January | 100 |
| February | 97 |
| March | 93 |
| April | 79 |
| May | 50 |
| June | 81 |
| July | 99 |
| August | 95 |
| September | 112 |
| October | 159 |
| November | 114 |
| December | 122 |
Counted at the property's ZIP code. Share is the part of the city's 2,861 solar permits.
How the city filed these permits. We group its types into kinds of work; this is the split.
| Permit type | Permits | Share |
|---|---|---|
| Residential Solar/PV Permit | 1,635 | 57% |
| Residential Electrical Permit | 744 | 26% |
| Residential Alteration Addition Permit | 385 | 13% |
| Commercial Solar/PV Permit | 64 | 2% |
| Commercial Electrical Permit | 33 | 1% |
Plumbing (36,961)Electrical (26,550)HVAC (17,879)Remodels & repairs (5,864)Roofing (5,203)New homes (5,159)Fences & walls (2,713)Demolition (2,643)Additions (2,008)Pools & spas (1,533)Garages, sheds & shade structures (239)
Solar permits for other places in Dallas–Fort Worth. Each permit office keeps its own file, so the numbers are not added together.
Denton, TXIrving, TXArlington, TXMcKinney, TXMurphy, TXWylie, TX
Source: Dallas OpenData, Building Permits (Socrata e7gq-4sah, January 2018 to present, updated daily), read 26 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's open permit file has no permit status and no final inspection date, so no finished share is shown.
Building and trade permits the City of Dallas issued inside the city limits: building, plumbing, electrical, mechanical, roofing, solar, pool, accessory-structure, foundation-repair and demolition permits. Suburbs such as Irving, Garland, Mesquite, Richardson and Plano, and unincorporated Dallas County, run their own permit offices and are not in this file. Drive approach and sidewalk permits are left out.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "Solar permits in the City of Dallas, TX", https://contractorrecords.com/dallas/solar-permits, data through September 2026, from City of Dallas Development Services building-permit records.Link to a table: By month · Season · By ZIP code · Permit types.
Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits by ZIP code · Solar permits by permit type.