Electrical permits in unincorporated Alachua County, FL

Data through September 2026 · updated 20 Oct 2026

1,546 electrical permits were issued in unincorporated Alachua County, October 2024 through September 2026: about 773 a year and 10% of all permits. 652 electrical permits in the last 12 months (Oct 2025–Sep 2026), 27% fewer than the 894 in the 12 months before. The busiest month is October. The usual one took 32 days from issue to the county's final. 32608 has the most, 303.

1,546permits issued
652last 12 months
Octbusiest month
32days, usual issue to final
89%finished
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 118Oct2024Nov 2024: 88Dec 2024: 52Jan 2025: 68Jan2025Feb 2025: 55Mar 2025: 67Apr 2025: 62May 2025: 69Jun 2025: 97Jul 2025: 85JulAug 2025: 61Sep 2025: 72Oct 2025: 61Nov 2025: 38Dec 2025: 49Jan 2026: 33Jan2026Feb 2026: 58Mar 2026: 61Apr 2026: 45May 2026: 66Jun 2026: 69Jul 2026: 73JulAug 2026: 55Sep 2026: 44
The same numbers as a table
MonthPermits
Oct 2024118
Nov 202488
Dec 202452
Jan 202568
Feb 202555
Mar 202567
Apr 202562
May 202569
Jun 202597
Jul 202585
Aug 202561
Sep 202572
Oct 202561
Nov 202538
Dec 202549
Jan 202633
Feb 202658
Mar 202661
Apr 202645
May 202666
Jun 202669
Jul 202673
Aug 202655
Sep 202644

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (139), January the quietest (78). A busy month at the permit counter usually means a longer wait for a contractor.

January: 78 (100 = an average month)February: 88 (100 = an average month)March: 99 (100 = an average month)April: 83 (100 = an average month)May: 105 (100 = an average month)June: 129 (100 = an average month)July: 123 (100 = an average month)August: 90 (100 = an average month)September: 90 (100 = an average month)October: 139 (100 = an average month)139November: 98 (100 = an average month)December: 78 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January78
February88
March99
April83
May105
June129
July123
August90
September90
October139
November98
December78

Download this table (CSV)

How long an electrical permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 783 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025894
Finished89.1%
Expired10.1%
Usual days, issue to final32
Middle half, days11–65

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the county's 1,546 electrical permits.

ZIP codePermitsShare
3260830320%
3266916210%
3260615610%
3261515510%
326071278%
326181127%
32640916%
32641835%
32653765%
32609755%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical Permit / Alteration/Repair/Replace85355%
Electrical Permit / Generator42628%
Electrical Permit / Other Electrical Work16811%
Electrical Permit / New Construction775%
Electrical Permit / Well Service221%

Download this table (CSV)

How Alachua County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in Gainesville. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Alachua County Growth Management, CitizenServe building permits (ArcGIS: BuildingPermitsCS), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the Alachua County Building Division issues for unincorporated land only, plus the small towns that contract with the county for building services. Gainesville, Alachua, High Springs and Newberry run their own permit offices and are not in this file; Gainesville has its own page on this site.

  • The county's file lists the company that pulled each permit, but this page shows permit counts only: there are no contractor lists, rankings or firm pages for this county.
  • The file has no declared job value, so we show no costs.
  • A final date is the county's close date on a permit marked Closed, Complete or Finaled. Permits closed after expiring or closed administratively count as expired.
  • The file has no homes-versus-other flag, so a permit counts as a home when its parcel's Florida property-use code is residential (single-family, mobile home, condo or small multifamily). The ZIP code also comes from the parcel.
  • Window and door replacements are counted under remodels and repairs.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in unincorporated Alachua County, FL", https://contractorrecords.com/alachua-county/electrical-permits, data through September 2026, from Alachua County Growth Management building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Alachua County issue a year?About 773 a year in unincorporated Alachua County: 1,546 permits issued October 2024 through September 2026, 652 of them in the last 12 months.
  • How long does an electrical permit take in Alachua County?The usual one took 32 days from issue to the county's final inspection, and the middle half took 11 to 65 days (783 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Alachua County file the most electrical permits?October (139 against an average month of 100); January is the quietest (78). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Alachua County?32608, with 303 of the 1,546 (20%); then 32669 (162).