Plumbing permits in unincorporated Alachua County, FL

Data through September 2026 · updated 20 Oct 2026

1,902 plumbing permits were issued in unincorporated Alachua County, October 2024 through September 2026: about 951 a year and 13% of all permits. 831 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 22% fewer than the 1,071 in the 12 months before. The busiest month is March. The usual one took 24 days from issue to the county's final. 32608 has the most, 563.

1,902permits issued
831last 12 months
Marbusiest month
24days, usual issue to final
85%finished
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 106Oct2024Nov 2024: 78Dec 2024: 65Jan 2025: 95Jan2025Feb 2025: 72Mar 2025: 92Apr 2025: 93May 2025: 92Jun 2025: 84Jul 2025: 108JulAug 2025: 96Sep 2025: 90Oct 2025: 78Nov 2025: 65Dec 2025: 72Jan 2026: 62Jan2026Feb 2026: 53Mar 2026: 92Apr 2026: 64May 2026: 65Jun 2026: 83Jul 2026: 59JulAug 2026: 70Sep 2026: 68
The same numbers as a table
MonthPermits
Oct 2024106
Nov 202478
Dec 202465
Jan 202595
Feb 202572
Mar 202592
Apr 202593
May 202592
Jun 202584
Jul 2025108
Aug 202596
Sep 202590
Oct 202578
Nov 202565
Dec 202572
Jan 202662
Feb 202653
Mar 202692
Apr 202664
May 202665
Jun 202683
Jul 202659
Aug 202670
Sep 202668

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (116), February the quietest (79). A busy month at the permit counter usually means a longer wait for a contractor.

January: 99 (100 = an average month)February: 79 (100 = an average month)March: 116 (100 = an average month)116April: 99 (100 = an average month)May: 99 (100 = an average month)June: 105 (100 = an average month)July: 105 (100 = an average month)August: 105 (100 = an average month)September: 100 (100 = an average month)October: 116 (100 = an average month)November: 90 (100 = an average month)December: 86 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January99
February79
March116
April99
May99
June105
July105
August105
September100
October116
November90
December86

Download this table (CSV)

How long a plumbing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 900 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,071
Finished85.2%
Expired13.3%
Usual days, issue to final24
Middle half, days9–57

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the county's 1,902 plumbing permits.

ZIP codePermitsShare
3260856330%
3260632617%
3260721111%
326691699%
326151277%
326531196%
32618854%
32641593%
32667472%
32640442%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Plumbing Permit / Alteration/Repair/Replace1,16661%
Gas Permit / Alteration/Repair/Replace49026%
Gas Permit / New Construction23512%
Plumbing Permit / New Construction7under 1%
Plumbing Permit / Solar Water Heating4under 1%

Download this table (CSV)

How Alachua County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in Gainesville. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Alachua County Growth Management, CitizenServe building permits (ArcGIS: BuildingPermitsCS), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the Alachua County Building Division issues for unincorporated land only, plus the small towns that contract with the county for building services. Gainesville, Alachua, High Springs and Newberry run their own permit offices and are not in this file; Gainesville has its own page on this site.

  • The county's file lists the company that pulled each permit, but this page shows permit counts only: there are no contractor lists, rankings or firm pages for this county.
  • The file has no declared job value, so we show no costs.
  • A final date is the county's close date on a permit marked Closed, Complete or Finaled. Permits closed after expiring or closed administratively count as expired.
  • The file has no homes-versus-other flag, so a permit counts as a home when its parcel's Florida property-use code is residential (single-family, mobile home, condo or small multifamily). The ZIP code also comes from the parcel.
  • Window and door replacements are counted under remodels and repairs.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in unincorporated Alachua County, FL", https://contractorrecords.com/alachua-county/plumbing-permits, data through September 2026, from Alachua County Growth Management building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits by ZIP code · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Alachua County issue a year?About 951 a year in unincorporated Alachua County: 1,902 permits issued October 2024 through September 2026, 831 of them in the last 12 months.
  • How long does a plumbing permit take in Alachua County?The usual one took 24 days from issue to the county's final inspection, and the middle half took 9 to 57 days (900 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Alachua County file the most plumbing permits?March (116 against an average month of 100); February is the quietest (79). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in Alachua County?32608, with 563 of the 1,902 (30%); then 32606 (326).