Where Tigard permits live
| Tool | Search by | What it shows |
|---|---|---|
| Community Development Hub | Address, permit number, parcel number | Each permit's type, status and dates; inspection results with the permit record number |
| TigardMaps All Permits layer (City GIS) | Any field, including address and parcel number | Case number, type, work class, status, valuation, description |
| Weblink (City records system, linked from the records request page) | — | Building and planning records, free |
| Our Tigard permit list | Month, kind of work, ZIP, status | 5,978 permits issued October 2024 to September 2026, no addresses |
How to look up the permits on a Tigard address
- Open the Community Development Hub and choose Search, then Permit.
- Type the house number and street name.
- Open each permit. Electrical, plumbing and mechanical permits are separate from the building permit for the same job.
- Read the status of each. Inspection results need the permit record number from step 3.
- For a permit history older than the portal shows, look the address up in Weblink or send a records request (below).
What the statuses mean in Tigard's file
| Status in the record | What it means | Counted as |
|---|---|---|
| Permit Closed / Inspections Completed | Work inspected and permit closed | Finished |
| Permit Issued | Permit issued, not yet closed | Still open |
| Permit Expired | Lapsed before it closed | Expired |
| Permit Void / Application Void / Withdrawn / Revoked | Cancelled | Left out |
For permits issued October 2024 to September 2025, 71.2% were closed, 5.1% were still open and 23.8% had expired by September 2026. The layer gives no final inspection date, so we can't say how long Tigard jobs take.
When the permit you want is older
The City's Public Records Request Form page says "Building and Planning records may be accessed electronically, free of charge, any time of day through Weblink", and for everything else "City staff will contact you within five (5) business days of receiving your initial request" (read 24 October 2026). Building Services also lists a "Public Records Request: Permit History" option.
What our Tigard pages add
The Hub answers "what was permitted at this address". Ours show what gets permitted in Tigard and when, for permits issued October 2024 to September 2026:
| Kind of work | Permits | Last 12 months | 12 months before |
|---|---|---|---|
| Electrical | 1,788 | 890 | 898 |
| HVAC | 1,506 | 720 | 786 |
| Plumbing | 1,178 | 519 | 659 |
| New homes | 322 | 143 | 179 |
| Solar | 283 | 145 | 138 |
"Last 12 months" is October 2025 to September 2026. By ZIP code over the full window, 97223 had 3,294 permits and 97224 had 2,374.
Start at the Tigard overview, the permit statistics and the permit list, or go straight to electrical, HVAC, plumbing, new homes or solar. To check a contractor's CCB license, see How to check a contractor's license in Oregon.
What this does not tell you
The City's permit layer names no contractor, so there are no firm lists for Tigard, and it has no final inspection date, so there are no day counts. Trade permits carry no valuation. Planning, right-of-way and code cases are left out.
How we know this
Portal and records wording is quoted from the City of Tigard's Building Services, Common Service Requests and Public Records Request Form pages, read 24 October 2026, and the search fields were checked against the Community Development Hub the same day. Our counts are the City's TigardMaps All Permits layer, building and trade permits issued October 2024 to September 2026.
Numbers come from public permit records in 57 cities, data through October 20, 2026. Nobody paid to be on this page and nobody can.
Questions
- How do I find out if a permit was pulled on my house in Tigard?
Search the address in the City's Community Development Hub (tigardor-energovweb.tylerhost.net/apps/SelfService). The City lists permit status checks 'by Address or Permit Number (no login required)'.
- How do I get old Tigard permit records or plans?
The City says building and planning records can be viewed free, any time, through its Weblink records system. For anything not there, use the Public Records Request Form; the City says staff contact you within five business days.
- Does Tigard's search cover Bull Mountain or King City?
Only the parts inside Tigard city limits. King City, Beaverton, Lake Oswego, Durham and unincorporated Washington County, including Bull Mountain outside the city, have their own permit offices.
- Can I search Tigard permits by contractor?
Not in the City's published permit layer, which names no contractor. To check an Oregon contractor's license and bond, use the Construction Contractors Board search.
- What share of Tigard permits get finished?
Of permits issued October 2024 to September 2025, 71.2% were closed, 5.1% still open and 23.8% expired by the end of September 2026.
Build your own list
Pick your city and the kind of work. Every firm with a permit on record, sorted by what you value.
Related guides
- Albuquerque building permit search: how to look up permits on an address
- Building a casita in Albuquerque: the 750 sq ft limit, rear-yard rule, parking, free plans, and who builds them
- Do I need a permit to build a house in Albuquerque? GB-2 or homeowner, the plan set and the fee
- Do I need a solar permit in Albuquerque? Building and electrical permits, the engineer triggers and the fee
- Common Service Requests — City of Tigard Building Services (2026-10-24)
- Building Services — City of Tigard (2026-10-24)
- Community Development Hub (EnerGov Self Service) — City of Tigard (2026-10-24)
- TigardMaps Permitting: All Permits — City of Tigard GIS (2026-10-24)
- Public Records Request Form — City of Tigard (2026-10-24)