New home permits in the City of Tigard, OR

Data through September 2026 · updated 20 Oct 2026

322 new home permits were issued in the City of Tigard, October 2024 through September 2026: about 161 a year and 5% of all permits. 143 new home permits in the last 12 months (Oct 2025–Sep 2026), 20% fewer than the 179 in the 12 months before. The busiest month is January. 97224 has the most, 205.

322permits issued
143last 12 months
Janbusiest month
97%finished
$411,237usual declared value
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 11Oct2024Nov 2024: 17Dec 2024: 19Jan 2025: 21Jan2025Feb 2025: 13Mar 2025: 11Apr 2025: 14May 2025: 16Jun 2025: 13Jul 2025: 14JulAug 2025: 11Sep 2025: 19Oct 2025: 16Nov 2025: 10Dec 2025: 11Jan 2026: 20Jan2026Feb 2026: 13Mar 2026: 22Apr 2026: 12May 2026: 6Jun 2026: 7Jul 2026: 12JulAug 2026: 4Sep 2026: 10
The same numbers as a table
MonthPermits
Oct 202411
Nov 202417
Dec 202419
Jan 202521
Feb 202513
Mar 202511
Apr 202514
May 202516
Jun 202513
Jul 202514
Aug 202511
Sep 202519
Oct 202516
Nov 202510
Dec 202511
Jan 202620
Feb 202613
Mar 202622
Apr 202612
May 20266
Jun 20267
Jul 202612
Aug 20264
Sep 202610

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). January is the busiest (153), August the quietest (56). A busy month at the permit counter usually means a longer wait for a contractor.

January: 153 (100 = an average month)153February: 97 (100 = an average month)March: 123 (100 = an average month)April: 97 (100 = an average month)May: 82 (100 = an average month)June: 75 (100 = an average month)July: 97 (100 = an average month)August: 56 (100 = an average month)September: 108 (100 = an average month)October: 101 (100 = an average month)November: 101 (100 = an average month)December: 112 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January153
February97
March123
April97
May82
June75
July97
August56
September108
October101
November101
December112

Download this table (CSV)

How many new home permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025179
Finished96.6%
Expired2.8%

Download this table (CSV)

What a new home permit is declared at

The value written on the permit at application, from 322 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$411,237
Middle half$346,708–$492,109

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the city's 322 new home permits.

ZIP codePermitsShare
9722420564%
971408526%
972233210%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential - New Construction - New Dwelling Unit31698%
Residential - New Construction - New Accessory Structure2under 1%
Residential - Alteration - New Dwelling Unit2under 1%
Residential - New Construction - Addition/Alteration2under 1%

Download this table (CSV)

How Tigard compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

New home permits for other places in Portland. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Tigard, TigardMaps Permitting: All Permits (ArcGIS layer), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Tigard issues inside the city limits only. King City, Beaverton, Lake Oswego, Durham and unincorporated Washington County (such as Bull Mountain outside the city) have their own permit offices and are not in this file.

  • The city's permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Tigard.
  • The layer marks a permit closed but gives no final inspection date, so these pages show which permits finished but not how long they took.
  • Plumbing, mechanical and electrical permits are separate from the building permit for the same job, so one job can count several times.
  • The value is the valuation on the permit, which sets the fee. Trade permits carry none. It is not a final cost.
  • Planning and land-use cases, right-of-way and utility permits, erosion control and code-compliance cases are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in the City of Tigard, OR", https://contractorrecords.com/tigard/new-home-permits, data through September 2026, from the City of Tigard Building Division building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: finished share · New homes permits: declared value · New homes permits by ZIP code · New homes permits by permit type.

Common questions

  • How many new home permits does Tigard issue a year?About 161 a year in the City of Tigard: 322 permits issued October 2024 through September 2026, 143 of them in the last 12 months.
  • When do people in Tigard file the most new home permits?January (153 against an average month of 100); August is the quietest (56). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Tigard?97224, with 205 of the 322 (64%); then 97140 (85).