Contractor Records
Home › Tigard › Solar

Solar permits in the City of Tigard, OR

Data through September 2026 · updated 20 Oct 2026

283 solar permits were issued in the City of Tigard, October 2024 through September 2026: about 142 a year and 5% of all permits. 145 solar permits in the last 12 months (Oct 2025–Sep 2026), 5% more than the 138 in the 12 months before. The busiest month is April. 97223 has the most, 141.

283permits issued
145last 12 months
Aprbusiest month
87%finished
$13,500usual declared value
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 10Oct2024Nov 2024: 8Dec 2024: 11Jan 2025: 13Jan2025Feb 2025: 7Mar 2025: 9Apr 2025: 16May 2025: 8Jun 2025: 11Jul 2025: 17JulAug 2025: 12Sep 2025: 16Oct 2025: 28Nov 2025: 16Dec 2025: 5Jan 2026: 4Jan2026Feb 2026: 11Mar 2026: 8Apr 2026: 27May 2026: 14Jun 2026: 10Jul 2026: 8JulAug 2026: 9Sep 2026: 5
The same numbers as a table
MonthPermits
Oct 202410
Nov 20248
Dec 202411
Jan 202513
Feb 20257
Mar 20259
Apr 202516
May 20258
Jun 202511
Jul 202517
Aug 202512
Sep 202516
Oct 202528
Nov 202516
Dec 20255
Jan 20264
Feb 202611
Mar 20268
Apr 202627
May 202614
Jun 202610
Jul 20268
Aug 20269
Sep 20265

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (182), December the quietest (68). A busy month at the permit counter usually means a longer wait for a contractor.

January: 72 (100 = an average month)February: 76 (100 = an average month)March: 72 (100 = an average month)April: 182 (100 = an average month)182May: 93 (100 = an average month)June: 89 (100 = an average month)July: 106 (100 = an average month)August: 89 (100 = an average month)September: 89 (100 = an average month)October: 161 (100 = an average month)November: 102 (100 = an average month)December: 68 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January72
February76
March72
April182
May93
June89
July106
August89
September89
October161
November102
December68

Download this table (CSV)

How many solar permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025138
Finished87.0%
Expired12.3%

Download this table (CSV)

What a solar permit is declared at

The value written on the permit at application, from 167 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$13,500
Middle half$7,368–$22,891

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the city's 283 solar permits.

ZIP codePermitsShare
9722314150%
9722413046%
9714093%
9700731%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Renewable Energy - Residential (Prescriptive)16257%
Residential - Alteration - Addition/Alteration7727%
Electrical - Alteration - Residential2910%
Renewable Energy - Residential (Non Prescriptive)93%
Renewable Energy - Commercial31%
Electrical - Alteration - Commercial1under 1%
Electrical - Alteration - Commercial (Plan Review)1under 1%
Electrical - Addition - Residential1under 1%

Download this table (CSV)

How Tigard compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Solar permits for other places in Portland. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Tigard, TigardMaps Permitting: All Permits (ArcGIS layer), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Tigard issues inside the city limits only. King City, Beaverton, Lake Oswego, Durham and unincorporated Washington County (such as Bull Mountain outside the city) have their own permit offices and are not in this file.

  • The city's permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Tigard.
  • The layer marks a permit closed but gives no final inspection date, so these pages show which permits finished but not how long they took.
  • Plumbing, mechanical and electrical permits are separate from the building permit for the same job, so one job can count several times.
  • The value is the valuation on the permit, which sets the fee. Trade permits carry none. It is not a final cost.
  • Planning and land-use cases, right-of-way and utility permits, erosion control and code-compliance cases are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in the City of Tigard, OR", https://contractorrecords.com/tigard/solar-permits, data through September 2026, from the City of Tigard Building Division building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: finished share · Solar permits: declared value · Solar permits by ZIP code · Solar permits by permit type.

Common questions

  • How many solar permits does Tigard issue a year?About 142 a year in the City of Tigard: 283 permits issued October 2024 through September 2026, 145 of them in the last 12 months.
  • When do people in Tigard file the most solar permits?April (182 against an average month of 100); December is the quietest (68). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Tigard?97223, with 141 of the 283 (50%); then 97224 (130).