Electrical permits in the City of Tigard, OR

Data through September 2026 · updated 20 Oct 2026

1,788 electrical permits were issued in the City of Tigard, October 2024 through September 2026: about 894 a year and 30% of all permits. 890 electrical permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 898 in the 12 months before. The busiest month is July. 97223 has the most, 1,079.

1,788permits issued
890last 12 months
Julbusiest month
77%finished
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 85Oct2024Nov 2024: 78Dec 2024: 76Jan 2025: 76Jan2025Feb 2025: 55Mar 2025: 78Apr 2025: 83May 2025: 81Jun 2025: 45Jul 2025: 96JulAug 2025: 80Sep 2025: 65Oct 2025: 63Nov 2025: 58Dec 2025: 77Jan 2026: 70Jan2026Feb 2026: 59Mar 2026: 97Apr 2026: 81May 2026: 84Jun 2026: 66Jul 2026: 91JulAug 2026: 76Sep 2026: 68
The same numbers as a table
MonthPermits
Oct 202485
Nov 202478
Dec 202476
Jan 202576
Feb 202555
Mar 202578
Apr 202583
May 202581
Jun 202545
Jul 202596
Aug 202580
Sep 202565
Oct 202563
Nov 202558
Dec 202577
Jan 202670
Feb 202659
Mar 202697
Apr 202681
May 202684
Jun 202666
Jul 202691
Aug 202676
Sep 202668

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (126), June the quietest (74). A busy month at the permit counter usually means a longer wait for a contractor.

January: 98 (100 = an average month)February: 77 (100 = an average month)March: 117 (100 = an average month)April: 110 (100 = an average month)May: 111 (100 = an average month)June: 74 (100 = an average month)July: 126 (100 = an average month)126August: 105 (100 = an average month)September: 89 (100 = an average month)October: 99 (100 = an average month)November: 91 (100 = an average month)December: 103 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January98
February77
March117
April110
May111
June74
July126
August105
September89
October99
November91
December103

Download this table (CSV)

How many electrical permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025898
Finished76.9%
Expired19.9%

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 1,788 electrical permits.

ZIP codePermitsShare
972231,07960%
9722468238%
9714017under 1%
970075under 1%
970355under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical - Alteration - Residential72240%
Electrical - Alteration - Commercial50528%
Electrical Limited Energy - Alteration - Commercial1518%
Electrical - Addition - Residential1026%
Electrical - New Construction - Commercial915%
Electrical - Addition - Commercial744%
Electrical Limited Energy - Addition - Commercial412%
Electrical Limited Energy - New Construction - Commercial342%
Electrical - New Construction - Residential302%
Electrical - Alteration - Commercial (Plan Review)16under 1%

Download this table (CSV)

How Tigard compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in Portland. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Tigard, TigardMaps Permitting: All Permits (ArcGIS layer), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Tigard issues inside the city limits only. King City, Beaverton, Lake Oswego, Durham and unincorporated Washington County (such as Bull Mountain outside the city) have their own permit offices and are not in this file.

  • The city's permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Tigard.
  • The layer marks a permit closed but gives no final inspection date, so these pages show which permits finished but not how long they took.
  • Plumbing, mechanical and electrical permits are separate from the building permit for the same job, so one job can count several times.
  • The value is the valuation on the permit, which sets the fee. Trade permits carry none. It is not a final cost.
  • Planning and land-use cases, right-of-way and utility permits, erosion control and code-compliance cases are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in the City of Tigard, OR", https://contractorrecords.com/tigard/electrical-permits, data through September 2026, from the City of Tigard Building Division building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: finished share · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Tigard issue a year?About 894 a year in the City of Tigard: 1,788 permits issued October 2024 through September 2026, 890 of them in the last 12 months.
  • When do people in Tigard file the most electrical permits?July (126 against an average month of 100); June is the quietest (74). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Tigard?97223, with 1,079 of the 1,788 (60%); then 97224 (682).