Data through September 2026 · updated 20 Oct 2026
5,978 building permits were issued in the City of Tigard from October 2024 to September 2026, about 2,989 a year. Electrical permits lead with 1,788, then HVAC (1,506) and plumbing (1,178). 62% were for homes. The city's file doesn't name contractors, so we can't rank, compare or profile firms here: these pages show what was built, where and when.
Building and trade permits the City of Tigard issues inside the city limits only. King City, Beaverton, Lake Oswego, Durham and unincorporated Washington County (such as Bull Mountain outside the city) have their own permit offices and are not in this file.
The permit file can't tell you who does good work. Ask for the contractor's license number and look it up at the Oregon CCB license search, then ask the city whether they pulled the permit for your job.
Permits issued October 2024 through September 2026, every kind of work with 100 or more. Last 12 months is Oct 2025–Sep 2026. Homes is the share issued as residential permits.
| Kind of work | Permits | Share | Last 12 mo |
|---|---|---|---|
| Electrical | 1,788 | 30% | 890 |
| HVAC | 1,506 | 25% | 720 |
| Plumbing | 1,178 | 20% | 519 |
| New homes | 322 | 5% | 143 |
| Solar | 283 | 5% | 145 |
| Other | 717 | 12% | 347 |
Fewer than 100 permits, so no row: remodels & repairs (69), garages, sheds & shade structures (45), additions (34), demolition (20), ADUs & casitas (13), roofing (3).
Local permit rules and lookups, each with Tigard's own permit numbers.
Permit data for other places in Portland. Each permit office keeps its own file, so the numbers are not added together.
Source: City of Tigard, TigardMaps Permitting: All Permits (ArcGIS layer), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.
Building and trade permits the City of Tigard issues inside the city limits only. King City, Beaverton, Lake Oswego, Durham and unincorporated Washington County (such as Bull Mountain outside the city) have their own permit offices and are not in this file.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "The City of Tigard, OR building permits", https://contractorrecords.com/tigard/, data through September 2026, from the City of Tigard Building Division building-permit records.Link to a table: By kind of work · Browse the permits · Permits each month.
Download the tables (CSV): Permits by kind of work · Permits in the last 12 months.
Every permit in the file issued October 2024 through September 2026, newest first. Pick a month, a kind of work, a ZIP code or a status. Each row is one permit: no street address, no names.
The list loads as you reach it (5,978 permits).
| Issued | Kind of work | City permit type | Status | ZIP |
|---|
Permits issued each month and the kind of work with the most. A month opens its permits in the list above.
| Month | Permits | Top kind of work |
|---|---|---|
| Sep 2026 | 212 | Electrical (68) |
| Aug 2026 | 252 | Electrical (76) |
| Jul 2026 | 274 | Electrical (91) |
| Jun 2026 | 268 | HVAC (78) |
| May 2026 | 225 | Electrical (84) |
| Apr 2026 | 266 | Electrical (81) |
| Mar 2026 | 296 | Electrical (97) |
| Feb 2026 | 205 | HVAC (62) |
| Jan 2026 | 207 | Electrical (70) |
| Dec 2025 | 239 | Electrical (77) |
| Nov 2025 | 191 | Electrical (58) |
| Oct 2025 | 236 | Electrical (63) |