Remodel and repair permits in Las Cruces, NM

Data through September 2026 · updated 20 Oct 2026

466 remodel and repair permits were issued in Las Cruces, October 2024 through September 2026: about 233 a year and 3% of all permits. 261 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 27% more than the 205 in the 12 months before. The busiest month is September.

466permits issued
261last 12 months
Sepbusiest month
$6,594usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 9Oct2024Nov 2024: 9Dec 2024: 17Jan 2025: 22Jan2025Feb 2025: 20Mar 2025: 17Apr 2025: 16May 2025: 16Jun 2025: 21Jul 2025: 21JulAug 2025: 15Sep 2025: 22Oct 2025: 19Nov 2025: 12Dec 2025: 24Jan 2026: 3Jan2026Feb 2026: 29Mar 2026: 15Apr 2026: 30May 2026: 26Jun 2026: 20Jul 2026: 29JulAug 2026: 23Sep 2026: 31
The same numbers as a table
MonthPermits
Oct 20249
Nov 20249
Dec 202417
Jan 202522
Feb 202520
Mar 202517
Apr 202516
May 202516
Jun 202521
Jul 202521
Aug 202515
Sep 202522
Oct 202519
Nov 202512
Dec 202524
Jan 20263
Feb 202629
Mar 202615
Apr 202630
May 202626
Jun 202620
Jul 202629
Aug 202623
Sep 202631

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (136), November the quietest (54). A busy month at the permit counter usually means a longer wait for a contractor.

January: 64 (100 = an average month)February: 126 (100 = an average month)March: 82 (100 = an average month)April: 118 (100 = an average month)May: 108 (100 = an average month)June: 106 (100 = an average month)July: 129 (100 = an average month)August: 98 (100 = an average month)September: 136 (100 = an average month)136October: 72 (100 = an average month)November: 54 (100 = an average month)December: 106 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January64
February126
March82
April118
May108
June106
July129
August98
September136
October72
November54
December106

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 464 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$6,594
Middle half$2,788–$12,470

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Windowdoor39785%
Alteration (Residential)6714%
Lath Stucco2under 1%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most remodel and repair permits in the City of Las Cruces GIS file, October 2024 through September 2026, with 5 or more each. Share is the part of all 466 remodel and repair permits; 91% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Window World of Las Cruces LLC24753%
Install Partners LLC6013%
Statewide Remodeling LLC409%
KMT Ventures NM, LLC92%

Download this table (CSV)

How these numbers are made

Source: City of Las Cruces GIS, Information_Services map service (Accela feed): BuildingPermits and CertificateOFoccupancy layers, read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's permit layer carries no permit status, and only building permits get a certificate of occupancy or completion in the public data, so no finished share is shown.

Building, trade, solar, fence, sign and demolition permits the City of Las Cruces issued inside the city limits. Right-of-way, paving, site-improvement and utility permits are left out. Unincorporated Doña Ana County is permitted by the county and is not in this file.

  • The city's permit layer has no status, so we show no finished share.
  • A final date is the date of the certificate of occupancy or certificate of completion the city issued for a building permit (new homes, additions, alterations); electrical, plumbing, mechanical, roofing and solar permits have none, so time to final is shown only for building work.
  • The value is the project valuation on the permit. The city records no value on electrical, plumbing and mechanical permits, so those are left unpriced.
  • Homes are the permits the city files under its Residential project class plus manufactured-home installations. Solar, fence, window and door, and sign permits carry no residential or commercial class, so they count as other property in the homes figures.
  • The layer gives a street address and map point but no ZIP code, so there are no ZIP pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Las Cruces, NM", https://contractorrecords.com/las-cruces/remodel-permits, data through September 2026, from City of Las Cruces Community Development building-permit records.

Link to a table: By month · Season · Declared value · Permit types · Most active contractors by permits filed.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: declared value · Remodels & repairs permits by permit type · Most active contractors by permits filed.

Common questions

  • How many remodel and repair permits does Las Cruces issue a year?About 233 a year in Las Cruces: 466 permits issued October 2024 through September 2026, 261 of them in the last 12 months.
  • When do people in Las Cruces file the most remodel and repair permits?September (136 against an average month of 100); November is the quietest (54). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.