Contractor Records
Home › Las Cruces › Roofing

Roofing permits in Las Cruces, NM

Data through September 2026 · updated 20 Oct 2026

502 roofing permits were issued in Las Cruces, October 2024 through September 2026: about 251 a year and 4% of all permits. 323 roofing permits in the last 12 months (Oct 2025–Sep 2026), 80% more than the 179 in the 12 months before. The busiest month is October.

502permits issued
323last 12 months
Octbusiest month
$13,550usual declared value
Sep 2026records through

Roofing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 16Oct2024Nov 2024: 6Dec 2024: 12Jan 2025: 18Jan2025Feb 2025: 9Mar 2025: 10Apr 2025: 16May 2025: 11Jun 2025: 9Jul 2025: 19JulAug 2025: 31Sep 2025: 22Oct 2025: 43Nov 2025: 35Dec 2025: 14Jan 2026: 25Jan2026Feb 2026: 23Mar 2026: 27Apr 2026: 34May 2026: 28Jun 2026: 27Jul 2026: 21JulAug 2026: 25Sep 2026: 21
The same numbers as a table
MonthPermits
Oct 202416
Nov 20246
Dec 202412
Jan 202518
Feb 20259
Mar 202510
Apr 202516
May 202511
Jun 20259
Jul 202519
Aug 202531
Sep 202522
Oct 202543
Nov 202535
Dec 202514
Jan 202625
Feb 202623
Mar 202627
Apr 202634
May 202628
Jun 202627
Jul 202621
Aug 202625
Sep 202621

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (141), December the quietest (62). A busy month at the permit counter usually means a longer wait for a contractor.

January: 103 (100 = an average month)February: 76 (100 = an average month)March: 88 (100 = an average month)April: 120 (100 = an average month)May: 93 (100 = an average month)June: 86 (100 = an average month)July: 96 (100 = an average month)August: 134 (100 = an average month)September: 103 (100 = an average month)October: 141 (100 = an average month)141November: 98 (100 = an average month)December: 62 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January103
February76
March88
April120
May93
June86
July96
August134
September103
October141
November98
December62

Download this table (CSV)

What a roofing permit is declared at

The value written on the permit at application, from 502 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$13,550
Middle half$8,250–$19,828

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Re-Roof (Residential)45390%
Re-Roof (Commercial)4910%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most roofing permits in the City of Las Cruces GIS file, October 2024 through September 2026, with 5 or more each. Share is the part of all 502 roofing permits; 94% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
United General Construction428%
Gilbert & Sons Roofing & Stucco Inc357%
Erasmo's Roofing LLC265%
Progreen Superior Coatings and Roofing Inc224%
Vista Del Sol Construction163%
Specialized Roofing Systems & Construction Inc153%
Sosa, Anthony Roofing & Construction133%
J.B. Home Builders, LLC122%
Fort Selden Builders Inc112%
Green Mountain Contractors Inc112%

Download this table (CSV)

How these numbers are made

Source: City of Las Cruces GIS, Information_Services map service (Accela feed): BuildingPermits and CertificateOFoccupancy layers, read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's permit layer carries no permit status, and only building permits get a certificate of occupancy or completion in the public data, so no finished share is shown.

Building, trade, solar, fence, sign and demolition permits the City of Las Cruces issued inside the city limits. Right-of-way, paving, site-improvement and utility permits are left out. Unincorporated Doña Ana County is permitted by the county and is not in this file.

  • The city's permit layer has no status, so we show no finished share.
  • A final date is the date of the certificate of occupancy or certificate of completion the city issued for a building permit (new homes, additions, alterations); electrical, plumbing, mechanical, roofing and solar permits have none, so time to final is shown only for building work.
  • The value is the project valuation on the permit. The city records no value on electrical, plumbing and mechanical permits, so those are left unpriced.
  • Homes are the permits the city files under its Residential project class plus manufactured-home installations. Solar, fence, window and door, and sign permits carry no residential or commercial class, so they count as other property in the homes figures.
  • The layer gives a street address and map point but no ZIP code, so there are no ZIP pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in Las Cruces, NM", https://contractorrecords.com/las-cruces/roofing-permits, data through September 2026, from City of Las Cruces Community Development building-permit records.

Link to a table: By month · Season · Declared value · Permit types · Most active contractors by permits filed.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: declared value · Roofing permits by permit type · Most active contractors by permits filed.

Common questions

  • How many roofing permits does Las Cruces issue a year?About 251 a year in Las Cruces: 502 permits issued October 2024 through September 2026, 323 of them in the last 12 months.
  • When do people in Las Cruces file the most roofing permits?October (141 against an average month of 100); December is the quietest (62). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.