Electrical permits in Las Cruces, NM

Data through September 2026 · updated 20 Oct 2026

3,851 electrical permits were issued in Las Cruces, October 2024 through September 2026: about 1,926 a year and 29% of all permits. 1,954 electrical permits in the last 12 months (Oct 2025–Sep 2026), 3% more than the 1,897 in the 12 months before. The busiest month is March.

3,851permits issued
1,954last 12 months
Marbusiest month
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 178Oct2024Nov 2024: 113Dec 2024: 106Jan 2025: 148Jan2025Feb 2025: 158Mar 2025: 179Apr 2025: 204May 2025: 142Jun 2025: 162Jul 2025: 176JulAug 2025: 151Sep 2025: 180Oct 2025: 165Nov 2025: 122Dec 2025: 121Jan 2026: 156Jan2026Feb 2026: 177Mar 2026: 214Apr 2026: 176May 2026: 143Jun 2026: 171Jul 2026: 151JulAug 2026: 161Sep 2026: 197
The same numbers as a table
MonthPermits
Oct 2024178
Nov 2024113
Dec 2024106
Jan 2025148
Feb 2025158
Mar 2025179
Apr 2025204
May 2025142
Jun 2025162
Jul 2025176
Aug 2025151
Sep 2025180
Oct 2025165
Nov 2025122
Dec 2025121
Jan 2026156
Feb 2026177
Mar 2026214
Apr 2026176
May 2026143
Jun 2026171
Jul 2026151
Aug 2026161
Sep 2026197

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (122), December the quietest (71). A busy month at the permit counter usually means a longer wait for a contractor.

January: 95 (100 = an average month)February: 104 (100 = an average month)March: 122 (100 = an average month)122April: 118 (100 = an average month)May: 89 (100 = an average month)June: 104 (100 = an average month)July: 102 (100 = an average month)August: 97 (100 = an average month)September: 117 (100 = an average month)October: 107 (100 = an average month)November: 73 (100 = an average month)December: 71 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January95
February104
March122
April118
May89
June104
July102
August97
September117
October107
November73
December71

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical (Residential)3,17182%
Electrical (Commercial)68018%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most electrical permits in the City of Las Cruces GIS file, October 2024 through September 2026, with 5 or more each. Share is the part of all 3,851 electrical permits; 98% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Ies Residential Inc84122%
Rad Electric Inc61116%
Vivint2757%
Organ Mountain Solar & Electric, LLC1053%
L & L Electric952%
Haskins Electric LLC942%
Solar Smart Living, LLC.722%
Emt Electric LLC662%
J and R Electric622%
Jas Electric612%

Download this table (CSV)

How these numbers are made

Source: City of Las Cruces GIS, Information_Services map service (Accela feed): BuildingPermits and CertificateOFoccupancy layers, read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's permit layer carries no permit status, and only building permits get a certificate of occupancy or completion in the public data, so no finished share is shown.

Building, trade, solar, fence, sign and demolition permits the City of Las Cruces issued inside the city limits. Right-of-way, paving, site-improvement and utility permits are left out. Unincorporated Doña Ana County is permitted by the county and is not in this file.

  • The city's permit layer has no status, so we show no finished share.
  • A final date is the date of the certificate of occupancy or certificate of completion the city issued for a building permit (new homes, additions, alterations); electrical, plumbing, mechanical, roofing and solar permits have none, so time to final is shown only for building work.
  • The value is the project valuation on the permit. The city records no value on electrical, plumbing and mechanical permits, so those are left unpriced.
  • Homes are the permits the city files under its Residential project class plus manufactured-home installations. Solar, fence, window and door, and sign permits carry no residential or commercial class, so they count as other property in the homes figures.
  • The layer gives a street address and map point but no ZIP code, so there are no ZIP pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Las Cruces, NM", https://contractorrecords.com/las-cruces/electrical-permits, data through September 2026, from City of Las Cruces Community Development building-permit records.

Link to a table: By month · Season · Permit types · Most active contractors by permits filed.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits by permit type · Most active contractors by permits filed.

Common questions

  • How many electrical permits does Las Cruces issue a year?About 1,926 a year in Las Cruces: 3,851 permits issued October 2024 through September 2026, 1,954 of them in the last 12 months.
  • When do people in Las Cruces file the most electrical permits?March (122 against an average month of 100); December is the quietest (71). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.