Demolition permits in unincorporated Polk County, FL

Data through September 2026 · updated 20 Oct 2026

657 demolition permits were issued in unincorporated Polk County, October 2024 through September 2026: about 328 a year and 4% of all permits. 323 demolition permits in the last 12 months (Oct 2025–Sep 2026), 3% fewer than the 334 in the 12 months before. The busiest month is August. The usual one took 50 days from issue to the county's final. 33823 has the most, 99.

What this file covers: The Property Appraiser's file holds only permits that can change a property's taxable value, so re-roofs, fences and most trade permits are missing.

657permits issued
323last 12 months
Augbusiest month
50days, usual issue to final
97%finished
$10,000usual declared value
Sep 2026records through

Demolition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 14Oct2024Nov 2024: 18Dec 2024: 35Jan 2025: 24Jan2025Feb 2025: 32Mar 2025: 36Apr 2025: 40May 2025: 20Jun 2025: 24Jul 2025: 33JulAug 2025: 41Sep 2025: 17Oct 2025: 28Nov 2025: 27Dec 2025: 37Jan 2026: 20Jan2026Feb 2026: 30Mar 2026: 37Apr 2026: 31May 2026: 22Jun 2026: 22Jul 2026: 7JulAug 2026: 42Sep 2026: 20
The same numbers as a table
MonthPermits
Oct 202414
Nov 202418
Dec 202435
Jan 202524
Feb 202532
Mar 202536
Apr 202540
May 202520
Jun 202524
Jul 202533
Aug 202541
Sep 202517
Oct 202528
Nov 202527
Dec 202537
Jan 202620
Feb 202630
Mar 202637
Apr 202631
May 202622
Jun 202622
Jul 20267
Aug 202642
Sep 202620

Download this table (CSV)

When demolition permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (152), September the quietest (68). A busy month at the permit counter usually means a longer wait for a contractor.

January: 80 (100 = an average month)February: 113 (100 = an average month)March: 133 (100 = an average month)April: 130 (100 = an average month)May: 77 (100 = an average month)June: 84 (100 = an average month)July: 73 (100 = an average month)August: 152 (100 = an average month)152September: 68 (100 = an average month)October: 77 (100 = an average month)November: 82 (100 = an average month)December: 132 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January80
February113
March133
April130
May77
June84
July73
August152
September68
October77
November82
December132

Download this table (CSV)

How long a demolition permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 261 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025334
Finished97.0%
Usual days, issue to final50
Middle half, days23–124

Download this table (CSV)

What a demolition permit is declared at

The value written on the permit at application, from 60 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$10,000
Middle half$5,915–$26,000

Download this table (CSV)

ZIP codes with the most demolition permits

Counted at the property's ZIP code. Share is the part of the county's 657 demolition permits.

ZIP codePermitsShare
338239915%
338446410%
33809518%
33880437%
33843386%
33853355%
33805355%
33898345%
33810325%
33881325%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
DE MH40862%
RES ADDN21633%
COM ADDN315%
RES NEW2under 1%

Download this table (CSV)

How these numbers are made

Source: Polk County Property Appraiser, public FTP permit file (ftp_permit.zip, Appraisal Data), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the Polk County building division issues for unincorporated land only (Poinciana, Lakeland Highlands, Four Corners, Kathleen, Wahneta and similar places). Lakeland, Winter Haven, Haines City, Davenport, Bartow, Lake Wales and the other cities issue their own permits and are not counted here. The list comes from the Polk County Property Appraiser, which collects only permits that can change a property's taxable value.

  • The file names no contractor, so there are no contractor lists, rankings or firm pages for this county.
  • The Property Appraiser collects only permits that can change taxable value: new homes, additions, pools, solar, generators, garages and similar. Re-roofs, fences, driveways and most like-for-like repairs are left out, so those kinds of work are undercounted or missing.
  • A final date is the county's final inspection of a new building or addition. A permit the Property Appraiser marks completed without one counts as finished but adds no days.
  • The value is the estimated value on the permit.
  • The ZIP code is the parcel's site ZIP on the Property Appraiser's roll.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Demolition permits in unincorporated Polk County, FL", https://contractorrecords.com/polk-county/demolition-permits, data through September 2026, from the Polk County Building Division building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits: days to final · Demolition permits: declared value · Demolition permits by ZIP code · Demolition permits by permit type.

Common questions

  • How many demolition permits does Polk County issue a year?About 328 a year in unincorporated Polk County: 657 permits issued October 2024 through September 2026, 323 of them in the last 12 months.
  • How long does a demolition permit take in Polk County?The usual one took 50 days from issue to the county's final inspection, and the middle half took 23 to 124 days (261 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Polk County file the most demolition permits?August (152 against an average month of 100); September is the quietest (68). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most demolition permits in Polk County?33823, with 99 of the 657 (15%); then 33844 (64).