Contractor Records
Home › Polk County › Remodels & repairs

Remodel and repair permits in unincorporated Polk County, FL

Data through September 2026 · updated 20 Oct 2026

2,000 remodel and repair permits were issued in unincorporated Polk County, October 2024 through September 2026: about 1,000 a year and 13% of all permits. 1,001 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 999 in the 12 months before. The busiest month is June. The usual one took 55 days from issue to the county's final. 33810 has the most, 168.

What this file covers: The Property Appraiser's file holds only permits that can change a property's taxable value, so re-roofs, fences and most trade permits are missing.

2,000permits issued
1,001last 12 months
Junbusiest month
55days, usual issue to final
93%finished
$14,080usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 78Oct2024Nov 2024: 49Dec 2024: 61Jan 2025: 85Jan2025Feb 2025: 87Mar 2025: 88Apr 2025: 70May 2025: 102Jun 2025: 103Jul 2025: 96JulAug 2025: 80Sep 2025: 100Oct 2025: 73Nov 2025: 81Dec 2025: 76Jan 2026: 69Jan2026Feb 2026: 71Mar 2026: 93Apr 2026: 101May 2026: 96Jun 2026: 103Jul 2026: 73JulAug 2026: 73Sep 2026: 92
The same numbers as a table
MonthPermits
Oct 202478
Nov 202449
Dec 202461
Jan 202585
Feb 202587
Mar 202588
Apr 202570
May 2025102
Jun 2025103
Jul 202596
Aug 202580
Sep 2025100
Oct 202573
Nov 202581
Dec 202576
Jan 202669
Feb 202671
Mar 202693
Apr 2026101
May 202696
Jun 2026103
Jul 202673
Aug 202673
Sep 202692

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (124), November the quietest (78). A busy month at the permit counter usually means a longer wait for a contractor.

January: 92 (100 = an average month)February: 95 (100 = an average month)March: 109 (100 = an average month)April: 103 (100 = an average month)May: 119 (100 = an average month)June: 124 (100 = an average month)124July: 101 (100 = an average month)August: 92 (100 = an average month)September: 115 (100 = an average month)October: 91 (100 = an average month)November: 78 (100 = an average month)December: 82 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January92
February95
March109
April103
May119
June124
July101
August92
September115
October91
November78
December82

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 572 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025999
Finished93.1%
Usual days, issue to final55
Middle half, days25–111

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 1,381 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$14,080
Middle half$5,000–$30,000

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the county's 2,000 remodel and repair permits.

ZIP codePermitsShare
338101688%
347591508%
338131427%
338371306%
338111226%
338981196%
338091136%
33884995%
33880955%
33823884%

Download this table (CSV)

How Polk County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: Polk County Property Appraiser, public FTP permit file (ftp_permit.zip, Appraisal Data), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the Polk County building division issues for unincorporated land only (Poinciana, Lakeland Highlands, Four Corners, Kathleen, Wahneta and similar places). Lakeland, Winter Haven, Haines City, Davenport, Bartow, Lake Wales and the other cities issue their own permits and are not counted here. The list comes from the Polk County Property Appraiser, which collects only permits that can change a property's taxable value.

  • The file names no contractor, so there are no contractor lists, rankings or firm pages for this county.
  • The Property Appraiser collects only permits that can change taxable value: new homes, additions, pools, solar, generators, garages and similar. Re-roofs, fences, driveways and most like-for-like repairs are left out, so those kinds of work are undercounted or missing.
  • A final date is the county's final inspection of a new building or addition. A permit the Property Appraiser marks completed without one counts as finished but adds no days.
  • The value is the estimated value on the permit.
  • The ZIP code is the parcel's site ZIP on the Property Appraiser's roll.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in unincorporated Polk County, FL", https://contractorrecords.com/polk-county/remodel-permits, data through September 2026, from the Polk County Building Division building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits: declared value · Remodels & repairs permits by ZIP code.

Common questions

  • How many remodel and repair permits does Polk County issue a year?About 1,000 a year in unincorporated Polk County: 2,000 permits issued October 2024 through September 2026, 1,001 of them in the last 12 months.
  • How long does a remodel and repair permit take in Polk County?The usual one took 55 days from issue to the county's final inspection, and the middle half took 25 to 111 days (572 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Polk County file the most remodel and repair permits?June (124 against an average month of 100); November is the quietest (78). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Polk County?33810, with 168 of the 2,000 (8%); then 34759 (150).