Electrical permits in unincorporated Polk County, FL

Data through September 2026 · updated 20 Oct 2026

829 electrical permits were issued in unincorporated Polk County, October 2024 through September 2026: about 414 a year and 5% of all permits. 373 electrical permits in the last 12 months (Oct 2025–Sep 2026), 18% fewer than the 456 in the 12 months before. The busiest month is May. The usual one took 41 days from issue to the county's final. 33813 has the most, 85.

What this file covers: The Property Appraiser's file holds only permits that can change a property's taxable value, so re-roofs, fences and most trade permits are missing.

829permits issued
373last 12 months
Maybusiest month
41days, usual issue to final
94%finished
$9,400usual declared value
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 27Oct2024Nov 2024: 24Dec 2024: 26Jan 2025: 27Jan2025Feb 2025: 33Mar 2025: 36Apr 2025: 45May 2025: 61Jun 2025: 47Jul 2025: 37JulAug 2025: 47Sep 2025: 46Oct 2025: 45Nov 2025: 21Dec 2025: 27Jan 2026: 24Jan2026Feb 2026: 17Mar 2026: 29Apr 2026: 31May 2026: 40Jun 2026: 39Jul 2026: 38JulAug 2026: 27Sep 2026: 35
The same numbers as a table
MonthPermits
Oct 202427
Nov 202424
Dec 202426
Jan 202527
Feb 202533
Mar 202536
Apr 202545
May 202561
Jun 202547
Jul 202537
Aug 202547
Sep 202546
Oct 202545
Nov 202521
Dec 202527
Jan 202624
Feb 202617
Mar 202629
Apr 202631
May 202640
Jun 202639
Jul 202638
Aug 202627
Sep 202635

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). May is the busiest (146), November the quietest (65). A busy month at the permit counter usually means a longer wait for a contractor.

January: 74 (100 = an average month)February: 72 (100 = an average month)March: 94 (100 = an average month)April: 110 (100 = an average month)May: 146 (100 = an average month)146June: 124 (100 = an average month)July: 109 (100 = an average month)August: 107 (100 = an average month)September: 117 (100 = an average month)October: 104 (100 = an average month)November: 65 (100 = an average month)December: 77 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January74
February72
March94
April110
May146
June124
July109
August107
September117
October104
November65
December77

Download this table (CSV)

How long an electrical permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 358 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025456
Finished93.9%
Usual days, issue to final41
Middle half, days20–91

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 357 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$9,400
Middle half$4,500–$15,300

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the county's 829 electrical permits.

ZIP codePermitsShare
338138510%
33810698%
33884607%
33898526%
33811506%
33880486%
33860486%
33809486%
33844385%
34759344%

Download this table (CSV)

How Polk County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: Polk County Property Appraiser, public FTP permit file (ftp_permit.zip, Appraisal Data), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the Polk County building division issues for unincorporated land only (Poinciana, Lakeland Highlands, Four Corners, Kathleen, Wahneta and similar places). Lakeland, Winter Haven, Haines City, Davenport, Bartow, Lake Wales and the other cities issue their own permits and are not counted here. The list comes from the Polk County Property Appraiser, which collects only permits that can change a property's taxable value.

  • The file names no contractor, so there are no contractor lists, rankings or firm pages for this county.
  • The Property Appraiser collects only permits that can change taxable value: new homes, additions, pools, solar, generators, garages and similar. Re-roofs, fences, driveways and most like-for-like repairs are left out, so those kinds of work are undercounted or missing.
  • A final date is the county's final inspection of a new building or addition. A permit the Property Appraiser marks completed without one counts as finished but adds no days.
  • The value is the estimated value on the permit.
  • The ZIP code is the parcel's site ZIP on the Property Appraiser's roll.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in unincorporated Polk County, FL", https://contractorrecords.com/polk-county/electrical-permits, data through September 2026, from the Polk County Building Division building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits: declared value · Electrical permits by ZIP code.

Common questions

  • How many electrical permits does Polk County issue a year?About 414 a year in unincorporated Polk County: 829 permits issued October 2024 through September 2026, 373 of them in the last 12 months.
  • How long does an electrical permit take in Polk County?The usual one took 41 days from issue to the county's final inspection, and the middle half took 20 to 91 days (358 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Polk County file the most electrical permits?May (146 against an average month of 100); November is the quietest (65). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Polk County?33813, with 85 of the 829 (10%); then 33810 (69).