Contractor Records
Home › Polk County › ZIP 33897

Building permits in 33897, unincorporated Polk County

Data through September 2026 · updated 20 Oct 2026

745 building permits were issued in ZIP code 33897 by the Polk County Building Division, October 2024 through September 2026: 5% of the 15,936 in unincorporated Polk County, the 9th busiest ZIP code. Solar permits lead with 195. 298 permits in the last 12 months (Oct 2025–Sep 2026), 33% fewer than the 447 in the 12 months before. Permits from a city that runs its own permit office are not counted.

745permits in 33897
298last 12 months
56%for homes
165days, usual issue to final
Sep 2026records through

Permits in 33897 by kind of work

Share here is the part of the 745 permits in 33897; countywide is the same for all of unincorporated Polk County.

Kind of workPermitsShare hereCountywide
Solar19526%13%
New homes7210%27%
Garages, sheds & shade structures527%18%
Remodels & repairs497%13%
Roofing213%2%
Demolition101%4%
Electrical91%5%
Pools & spas7under 1%4%
Additions2under 1%1%
HVAC1under 1%under 1%
Other32744%12%

Download this table (CSV)

Permits in 33897 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)394376
202512423423
2026 (through September)9228304

Download this table (CSV)

How permits in 33897 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure33897Countywide
Permits issued Oct 2024–Sep 20254478,322
Finished85.5%90.1%
Usual days, issue to final16583

Download this table (CSV)

How these numbers are made

Source: Polk County Property Appraiser, public FTP permit file (ftp_permit.zip, Appraisal Data), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the Polk County building division issues for unincorporated land only (Poinciana, Lakeland Highlands, Four Corners, Kathleen, Wahneta and similar places). Lakeland, Winter Haven, Haines City, Davenport, Bartow, Lake Wales and the other cities issue their own permits and are not counted here. The list comes from the Polk County Property Appraiser, which collects only permits that can change a property's taxable value.

  • The file names no contractor, so there are no contractor lists, rankings or firm pages for this county.
  • The Property Appraiser collects only permits that can change taxable value: new homes, additions, pools, solar, generators, garages and similar. Re-roofs, fences, driveways and most like-for-like repairs are left out, so those kinds of work are undercounted or missing.
  • A final date is the county's final inspection of a new building or addition. A permit the Property Appraiser marks completed without one counts as finished but adds no days.
  • The value is the estimated value on the permit.
  • The ZIP code is the parcel's site ZIP on the Property Appraiser's roll.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 33897, unincorporated Polk County", https://contractorrecords.com/polk-county/zip/33897, data through September 2026, from the Polk County Building Division building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 33897 by kind of work · Permits in 33897 by year · Permits in 33897: finished and days to final.

Common questions

  • How many building permits were issued in 33897?745 permits issued by the county in ZIP code 33897, October 2024 through September 2026: 195 solar, 72 new homes, 52 garages, sheds & shade structures. 298 were in the last 12 months.
  • What is built most in 33897?Solar: 195 of the 745 permits (26%), against 13% countywide.
  • How long does a permit take in 33897?The usual permit issued here Oct 2024–Sep 2025 took 165 days from issue to final (303 permits with a final date), against 83 days countywide.
  • Who did the work in 33897?The county's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the county.