ADU and casita permits in Portland, OR

Data through September 2026 · updated 18 Oct 2026

245 ADU and casita permits were issued in Portland, October 2024 through September 2026: about 122 a year and under 1% of all permits. 105 ADU and casita permits in the last 12 months (Oct 2025–Sep 2026), 25% fewer than the 140 in the 12 months before. The busiest month is December. The usual one took 213 days from issue to the city's final. 97206 has the most, 35.

245permits issued
105last 12 months
Decbusiest month
213days, usual issue to final
93%finished
$100,000usual declared value
Sep 2026records through

ADU and casita permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 14Oct2024Nov 2024: 10Dec 2024: 12Jan 2025: 14Jan2025Feb 2025: 14Mar 2025: 15Apr 2025: 16May 2025: 19Jun 2025: 6Jul 2025: 5JulAug 2025: 8Sep 2025: 7Oct 2025: 4Nov 2025: 10Dec 2025: 17Jan 2026: 12Jan2026Feb 2026: 5Mar 2026: 4Apr 2026: 6May 2026: 6Jun 2026: 6Jul 2026: 14JulAug 2026: 8Sep 2026: 13
The same numbers as a table
MonthPermits
Oct 202414
Nov 202410
Dec 202412
Jan 202514
Feb 202514
Mar 202515
Apr 202516
May 202519
Jun 20256
Jul 20255
Aug 20258
Sep 20257
Oct 20254
Nov 202510
Dec 202517
Jan 202612
Feb 20265
Mar 20264
Apr 20266
May 20266
Jun 20266
Jul 202614
Aug 20268
Sep 202613

Download this table (CSV)

When ADU and casita permits are filed

By calendar month, 100 = an average month (the thin line). December is the busiest (142), June the quietest (59). A busy month at the permit counter usually means a longer wait for a contractor.

January: 127 (100 = an average month)February: 93 (100 = an average month)March: 93 (100 = an average month)April: 108 (100 = an average month)May: 122 (100 = an average month)June: 59 (100 = an average month)July: 93 (100 = an average month)August: 78 (100 = an average month)September: 98 (100 = an average month)October: 88 (100 = an average month)November: 98 (100 = an average month)December: 142 (100 = an average month)142JFMAMJJASOND
The same numbers as a table
MonthIndex
January127
February93
March93
April108
May122
June59
July93
August78
September98
October88
November98
December142

Download this table (CSV)

How long an ADU and casita permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 130 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025140
Finished92.9%
Expired1.4%
Usual days, issue to final213
Middle half, days104–300

Download this table (CSV)

What an ADU and casita permit is declared at

The value written on the permit at application, from 203 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$100,000
Middle half$35,000–$100,000

Download this table (CSV)

ZIP codes with the most ADU and casita permits

Counted at the property's ZIP code. Share is the part of the city's 245 ADU and casita permits.

ZIP codePermitsShare
972063514%
972112811%
97213156%
97220135%
97215125%
97219125%
97218125%
97266125%
97202114%
97212104%

Download this table (CSV)

Nearby permit data

ADU and casita permits for other places in Portland. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Portland, PortlandMaps Public/BDS_Permit FeatureServer layer 22 (All Permits), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Portland Permitting & Development (formerly the Bureau of Development Services) issued for property inside the City of Portland. Permits the bureau handles for places outside the city limits, and tree, nuisance, noise, land-use and right-of-way cases in the same file, are not counted. Gresham, Beaverton, Lake Oswego and the rest of the metro area run their own permit offices.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Portland.
  • Electrical, mechanical and plumbing permits are trade permits filed on their own, so one job (a remodel, say) can show up as a building permit plus several trade permits.
  • Job value is the value declared on building permits only; electrical, mechanical and plumbing permits carry no value, so costs are shown only for kinds of work filed as building permits.
  • A final date is the city's finaled date. A permit that expired or was cancelled is not counted as finished even when the file gives it a closing date.
  • The ZIP code comes from the county tax lot the permit is filed on; permits not tied to a tax lot have no ZIP code.
  • Roofing and solar jobs are picked out of residential building permits by their descriptions; a reroof that needs no structural work needs no permit in Portland, so roofing counts are low.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "ADU and casita permits in Portland, OR", https://contractorrecords.com/portland/adu-permits, data through September 2026, from Portland Permitting & Development building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code.

Download the tables (CSV): ADUs & casitas permits by month · ADUs & casitas permits by calendar month (index) · ADUs & casitas permits: days to final · ADUs & casitas permits: declared value · ADUs & casitas permits by ZIP code.

Common questions

  • How many ADU and casita permits does Portland issue a year?About 122 a year in Portland: 245 permits issued October 2024 through September 2026, 105 of them in the last 12 months.
  • How long does an ADU and casita permit take in Portland?The usual one took 213 days from issue to the city's final inspection, and the middle half took 104 to 300 days (130 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Portland file the most ADU and casita permits?December (142 against an average month of 100); June is the quietest (59). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most ADU and casita permits in Portland?97206, with 35 of the 245 (14%); then 97211 (28).