Remodel and repair permits in Portland, OR

Data through September 2026 · updated 18 Oct 2026

3,972 remodel and repair permits were issued in Portland, October 2024 through September 2026: about 1,986 a year and 5% of all permits. 1,852 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 13% fewer than the 2,120 in the 12 months before. The busiest month is October. The usual one took 110 days from issue to the city's final. 97202 has the most, 342.

3,972permits issued
1,852last 12 months
Octbusiest month
110days, usual issue to final
89%finished
$20,000usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 213Oct2024Nov 2024: 149Dec 2024: 159Jan 2025: 184Jan2025Feb 2025: 183Mar 2025: 206Apr 2025: 181May 2025: 172Jun 2025: 177Jul 2025: 190JulAug 2025: 173Sep 2025: 133Oct 2025: 210Nov 2025: 134Dec 2025: 153Jan 2026: 144Jan2026Feb 2026: 138Mar 2026: 175Apr 2026: 137May 2026: 107Jun 2026: 138Jul 2026: 182JulAug 2026: 161Sep 2026: 173
The same numbers as a table
MonthPermits
Oct 2024213
Nov 2024149
Dec 2024159
Jan 2025184
Feb 2025183
Mar 2025206
Apr 2025181
May 2025172
Jun 2025177
Jul 2025190
Aug 2025173
Sep 2025133
Oct 2025210
Nov 2025134
Dec 2025153
Jan 2026144
Feb 2026138
Mar 2026175
Apr 2026137
May 2026107
Jun 2026138
Jul 2026182
Aug 2026161
Sep 2026173

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (128), May the quietest (84). A busy month at the permit counter usually means a longer wait for a contractor.

January: 99 (100 = an average month)February: 97 (100 = an average month)March: 115 (100 = an average month)April: 96 (100 = an average month)May: 84 (100 = an average month)June: 95 (100 = an average month)July: 112 (100 = an average month)August: 101 (100 = an average month)September: 92 (100 = an average month)October: 128 (100 = an average month)128November: 85 (100 = an average month)December: 94 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January99
February97
March115
April96
May84
June95
July112
August101
September92
October128
November85
December94

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,889 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20252,120
Finished89.3%
Expired5.0%
Usual days, issue to final110
Middle half, days46–206

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 3,268 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$20,000
Middle half$7,500–$45,000

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 3,972 remodel and repair permits.

ZIP codePermitsShare
972023429%
972193338%
972123258%
972113178%
972063028%
972132647%
972152286%
972172256%
972142175%
972031484%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential 1 & 2 Family Permit / Single Family Dwelling3,61191%
Residential 1 & 2 Family Permit / Accessory Dwelling Unit1233%
Residential 1 & 2 Family Permit / Garage/Carport822%
Residential 1 & 2 Family Permit / Duplex/Two Family Dwelling742%
Residential 1 & 2 Family Permit / Accessory Structure491%
Residential 1 & 2 Family Permit / Townhouse (3 or more units)23under 1%
Residential 1 & 2 Family Permit / Townhouse (2 Units)8under 1%
Residential 1 & 2 Family Permit / Floating Home2under 1%

Download this table (CSV)

How Portland compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in Portland. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Portland, PortlandMaps Public/BDS_Permit FeatureServer layer 22 (All Permits), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Portland Permitting & Development (formerly the Bureau of Development Services) issued for property inside the City of Portland. Permits the bureau handles for places outside the city limits, and tree, nuisance, noise, land-use and right-of-way cases in the same file, are not counted. Gresham, Beaverton, Lake Oswego and the rest of the metro area run their own permit offices.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Portland.
  • Electrical, mechanical and plumbing permits are trade permits filed on their own, so one job (a remodel, say) can show up as a building permit plus several trade permits.
  • Job value is the value declared on building permits only; electrical, mechanical and plumbing permits carry no value, so costs are shown only for kinds of work filed as building permits.
  • A final date is the city's finaled date. A permit that expired or was cancelled is not counted as finished even when the file gives it a closing date.
  • The ZIP code comes from the county tax lot the permit is filed on; permits not tied to a tax lot have no ZIP code.
  • Roofing and solar jobs are picked out of residential building permits by their descriptions; a reroof that needs no structural work needs no permit in Portland, so roofing counts are low.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Portland, OR", https://contractorrecords.com/portland/remodel-permits, data through September 2026, from Portland Permitting & Development building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits: declared value · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Portland issue a year?About 1,986 a year in Portland: 3,972 permits issued October 2024 through September 2026, 1,852 of them in the last 12 months.
  • How long does a remodel and repair permit take in Portland?The usual one took 110 days from issue to the city's final inspection, and the middle half took 46 to 206 days (1,889 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Portland file the most remodel and repair permits?October (128 against an average month of 100); May is the quietest (84). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Portland?97202, with 342 of the 3,972 (9%); then 97219 (333).