Solar permits in Portland, OR

Data through September 2026 · updated 18 Oct 2026

3,093 solar permits were issued in Portland, October 2024 through September 2026: about 1,546 a year and 4% of all permits. 1,241 solar permits in the last 12 months (Oct 2025–Sep 2026), 33% fewer than the 1,852 in the 12 months before. The busiest month is October. The usual one took 48 days from issue to the city's final. 97206 has the most, 399.

3,093permits issued
1,241last 12 months
Octbusiest month
48days, usual issue to final
97%finished
$6,750usual declared value
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 185Oct2024Nov 2024: 118Dec 2024: 157Jan 2025: 93Jan2025Feb 2025: 171Mar 2025: 178Apr 2025: 173May 2025: 125Jun 2025: 127Jul 2025: 188JulAug 2025: 150Sep 2025: 187Oct 2025: 348Nov 2025: 156Dec 2025: 118Jan 2026: 47Jan2026Feb 2026: 49Mar 2026: 58Apr 2026: 65May 2026: 81Jun 2026: 57Jul 2026: 86JulAug 2026: 87Sep 2026: 89
The same numbers as a table
MonthPermits
Oct 2024185
Nov 2024118
Dec 2024157
Jan 202593
Feb 2025171
Mar 2025178
Apr 2025173
May 2025125
Jun 2025127
Jul 2025188
Aug 2025150
Sep 2025187
Oct 2025348
Nov 2025156
Dec 2025118
Jan 202647
Feb 202649
Mar 202658
Apr 202665
May 202681
Jun 202657
Jul 202686
Aug 202687
Sep 202689

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (207), January the quietest (54). A busy month at the permit counter usually means a longer wait for a contractor.

January: 54 (100 = an average month)February: 85 (100 = an average month)March: 92 (100 = an average month)April: 92 (100 = an average month)May: 80 (100 = an average month)June: 71 (100 = an average month)July: 106 (100 = an average month)August: 92 (100 = an average month)September: 107 (100 = an average month)October: 207 (100 = an average month)207November: 106 (100 = an average month)December: 107 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January54
February85
March92
April92
May80
June71
July106
August92
September107
October207
November106
December107

Download this table (CSV)

How long a solar permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,794 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,852
Finished96.9%
Expired2.5%
Usual days, issue to final48
Middle half, days27–87

Download this table (CSV)

What a solar permit is declared at

The value written on the permit at application, from 2,638 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$6,750
Middle half$6,750–$6,750

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the city's 3,093 solar permits.

ZIP codePermitsShare
9720639913%
972022448%
972172016%
972131926%
972191896%
972661705%
972151645%
972111635%
972031595%
972361455%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential 1 & 2 Family Permit / Single Family Dwelling2,59184%
Electrical Permit / Residential 1 & 2 Family2006%
Residential 1 & 2 Family Permit / Garage/Carport1214%
Electrical Permit / Commercial/Multifamily993%
Residential 1 & 2 Family Permit / Townhouse (2 Units)23under 1%
Residential 1 & 2 Family Permit / Duplex/Two Family Dwelling23under 1%
Residential 1 & 2 Family Permit / Accessory Structure19under 1%
Residential 1 & 2 Family Permit / Townhouse (3 or more units)15under 1%
Residential 1 & 2 Family Permit / Floating Home2under 1%

Download this table (CSV)

How Portland compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Solar permits for other places in Portland. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Portland, PortlandMaps Public/BDS_Permit FeatureServer layer 22 (All Permits), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Portland Permitting & Development (formerly the Bureau of Development Services) issued for property inside the City of Portland. Permits the bureau handles for places outside the city limits, and tree, nuisance, noise, land-use and right-of-way cases in the same file, are not counted. Gresham, Beaverton, Lake Oswego and the rest of the metro area run their own permit offices.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Portland.
  • Electrical, mechanical and plumbing permits are trade permits filed on their own, so one job (a remodel, say) can show up as a building permit plus several trade permits.
  • Job value is the value declared on building permits only; electrical, mechanical and plumbing permits carry no value, so costs are shown only for kinds of work filed as building permits.
  • A final date is the city's finaled date. A permit that expired or was cancelled is not counted as finished even when the file gives it a closing date.
  • The ZIP code comes from the county tax lot the permit is filed on; permits not tied to a tax lot have no ZIP code.
  • Roofing and solar jobs are picked out of residential building permits by their descriptions; a reroof that needs no structural work needs no permit in Portland, so roofing counts are low.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in Portland, OR", https://contractorrecords.com/portland/solar-permits, data through September 2026, from Portland Permitting & Development building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: days to final · Solar permits: declared value · Solar permits by ZIP code · Solar permits by permit type.

Common questions

  • How many solar permits does Portland issue a year?About 1,546 a year in Portland: 3,093 permits issued October 2024 through September 2026, 1,241 of them in the last 12 months.
  • How long does a solar permit take in Portland?The usual one took 48 days from issue to the city's final inspection, and the middle half took 27 to 87 days (1,794 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Portland file the most solar permits?October (207 against an average month of 100); January is the quietest (54). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Portland?97206, with 399 of the 3,093 (13%); then 97202 (244).